Project Management Plan: Establishing a Cafe in Sydney, Australia
VerifiedAdded on 2022/10/15
|16
|1892
|15
Project
AI Summary
This project management plan details the process of opening a cafe in Sydney, Australia, focusing on providing affordable coffee and snacks to college students. The plan outlines the project scope, objectives, stakeholder identification using a RACI matrix, and the organizational structure. It covers legislative requirements such as taxation, insurance, and licensing, alongside resource planning including physical, material, human, and financial aspects. A budget of approximately $69,160 is allocated. Detailed timelines are provided in a Gantt chart, specifying responsibilities. Risk assessment and risk management strategies, including a risk register, are also included. The project aims to create a welcoming environment that attracts students while ensuring business success through competitive pricing and service offerings.

Running head: PROJECT MANAGEMENT
Project management: Opening a cafe in Sydney
Name of the Student
Name of the University
Author’s Note
Project management: Opening a cafe in Sydney
Name of the Student
Name of the University
Author’s Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

1
PROJECT MANAGEMENT
Table of Contents
1. Introduction..................................................................................................................................2
1.1 Background of the project.....................................................................................................2
1.2 Project scope..........................................................................................................................2
2. Objectives of the project and its alignment with organizational objectives and goals................3
3. Identification of project stakeholders.........................................................................................3
4. Organizational structure of the project........................................................................................7
5. Legislative actions requirements that needs to be considered.....................................................8
6. Project requirement including physical, material, human and financial.....................................8
7. Budget of the project.................................................................................................................10
8. Detailed timelines with responsibilities in Gantt chart..............................................................11
9. Risk assessment and risk management strategies including risk register..................................12
Bibliography..................................................................................................................................14
PROJECT MANAGEMENT
Table of Contents
1. Introduction..................................................................................................................................2
1.1 Background of the project.....................................................................................................2
1.2 Project scope..........................................................................................................................2
2. Objectives of the project and its alignment with organizational objectives and goals................3
3. Identification of project stakeholders.........................................................................................3
4. Organizational structure of the project........................................................................................7
5. Legislative actions requirements that needs to be considered.....................................................8
6. Project requirement including physical, material, human and financial.....................................8
7. Budget of the project.................................................................................................................10
8. Detailed timelines with responsibilities in Gantt chart..............................................................11
9. Risk assessment and risk management strategies including risk register..................................12
Bibliography..................................................................................................................................14

2
PROJECT MANAGEMENT
1. Introduction
1.1 Background of the project
The paper mainly reflects on opening of a café in Sydney. It is identified that the café
was opened near to a college in Sydney such that the college students can be able to spend their
free time in the café and can enjoy coffee with snacks at a very much reasonable price. This is
mainly because the cafés which are present in that location is quite expensive and the college
students are unable to afford those coffee shops with their pocket money. The new coffee shop
not only serves coffee at reasonable price but also provides excellent environment that attracts
students.
1.2 Project scope
The scope of the project is mainly categorized into in scope and out scope:
In scope
Opening of a café in Sydney near to a college
Creating the business plan for the café shop
Exploring the near by location for undertaking market analysis
Determining the vendors who can be able to supply snacks
Determining point to point sales system
Giving proper facility of training to the project team members
Out-scope
The information about the vendors are not included within the project
PROJECT MANAGEMENT
1. Introduction
1.1 Background of the project
The paper mainly reflects on opening of a café in Sydney. It is identified that the café
was opened near to a college in Sydney such that the college students can be able to spend their
free time in the café and can enjoy coffee with snacks at a very much reasonable price. This is
mainly because the cafés which are present in that location is quite expensive and the college
students are unable to afford those coffee shops with their pocket money. The new coffee shop
not only serves coffee at reasonable price but also provides excellent environment that attracts
students.
1.2 Project scope
The scope of the project is mainly categorized into in scope and out scope:
In scope
Opening of a café in Sydney near to a college
Creating the business plan for the café shop
Exploring the near by location for undertaking market analysis
Determining the vendors who can be able to supply snacks
Determining point to point sales system
Giving proper facility of training to the project team members
Out-scope
The information about the vendors are not included within the project

3
PROJECT MANAGEMENT
The information about the materials as well as equipment’s which are required are not
provided in detail
2. Objectives of the project and its alignment with organizational objectives
and goals
The main objective of the project is to open a café in Sydney for providing the facility of
coffee and snacks to the college students at a very much reasonable price.
It is found that the objective of the project is aligned with the organizational goals and
objectives as the café has also the aim of flourishing their business by attracting new people to
their shop and that they want to do by serving different types of coffee as well as snacks at an
affordable price within excellent ambience.
3. Identification of project stakeholders
The stakeholders who are involved with the café opening project can be showcased with
the help of the RACI matrix. It is found that the RACI matrix is one of the responsibility
assignment charts that helps in mapping out each task, milestones or key decisions that are
involved in finishing the project. RACI mainly stands for Responsibility, accountability,
consulted as well as informed. The RACI matrix for café opening project is provided below:
Activities
Project
manager
Project
planner
HR
manager
Finance
manager
Operational
manager
Market
analyst
Creating the
business case for
the project
R, A C I
PROJECT MANAGEMENT
The information about the materials as well as equipment’s which are required are not
provided in detail
2. Objectives of the project and its alignment with organizational objectives
and goals
The main objective of the project is to open a café in Sydney for providing the facility of
coffee and snacks to the college students at a very much reasonable price.
It is found that the objective of the project is aligned with the organizational goals and
objectives as the café has also the aim of flourishing their business by attracting new people to
their shop and that they want to do by serving different types of coffee as well as snacks at an
affordable price within excellent ambience.
3. Identification of project stakeholders
The stakeholders who are involved with the café opening project can be showcased with
the help of the RACI matrix. It is found that the RACI matrix is one of the responsibility
assignment charts that helps in mapping out each task, milestones or key decisions that are
involved in finishing the project. RACI mainly stands for Responsibility, accountability,
consulted as well as informed. The RACI matrix for café opening project is provided below:
Activities
Project
manager
Project
planner
HR
manager
Finance
manager
Operational
manager
Market
analyst
Creating the
business case for
the project
R, A C I
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

4
PROJECT MANAGEMENT
Undertaking the
project feasibility
study
C I R, A
Establishing the
project charter
C R, A I
Appointing the
project team
members
C I R, A
Project plan
development
C R, A I
Resource plan
development
C I R, A
Financial plan
development
C I R, A
Quality plan
development
C R, A I
Risk
management plan
development
C R, A I
Procurement
plan development
C I R, A
PROJECT MANAGEMENT
Undertaking the
project feasibility
study
C I R, A
Establishing the
project charter
C R, A I
Appointing the
project team
members
C I R, A
Project plan
development
C R, A I
Resource plan
development
C I R, A
Financial plan
development
C I R, A
Quality plan
development
C R, A I
Risk
management plan
development
C R, A I
Procurement
plan development
C I R, A

5
PROJECT MANAGEMENT
Communication
plan development
C I R, A
Business plan
for café
R, A I C
Menu selection
for café that will be
available
I C R, A
Exploration of
different location
C I R, A
Competitive
market analysis
C I R, A
Local
regulations and
laws
C R, A I
Exploration of
the equipment’s
C R, A I
Business
structure
establishment
C R, A I
Identifying
vendors for
supplying cakes
C I R, A
PROJECT MANAGEMENT
Communication
plan development
C I R, A
Business plan
for café
R, A I C
Menu selection
for café that will be
available
I C R, A
Exploration of
different location
C I R, A
Competitive
market analysis
C I R, A
Local
regulations and
laws
C R, A I
Exploration of
the equipment’s
C R, A I
Business
structure
establishment
C R, A I
Identifying
vendors for
supplying cakes
C I R, A

6
PROJECT MANAGEMENT
Exploring the
rules of the health
department
I C R, A
Point to sale
system exploration
I C R, A
Identifying the
coffee brand
I C R, A
Providing
training to the
workers
I R, A C
Proper
understanding about
the sales regulation
C I R, A
Reviewing the
project
R, A C I
Sign off from
stakeholders
R, A C I
Project
documentation
R, A C I
PROJECT MANAGEMENT
Exploring the
rules of the health
department
I C R, A
Point to sale
system exploration
I C R, A
Identifying the
coffee brand
I C R, A
Providing
training to the
workers
I R, A C
Proper
understanding about
the sales regulation
C I R, A
Reviewing the
project
R, A C I
Sign off from
stakeholders
R, A C I
Project
documentation
R, A C I
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7
PROJECT MANAGEMENT
CEO
Business
development Legal Finance Hr resources
Global growth
and operations Capital
Health and
business
solution
Healthcare Transportati
on
4. Organizational structure of the project
An organizational structure is one of the systems that is helpful in properly outlining
different types of activities which are directed for achieving the organizational objectives of the
project. The organizational structure of the café is provided below and it is found that the
structure is also helpful in reporting requirements of the project.
Figure 1: Organizational structure
(Source: Created by Author)
PROJECT MANAGEMENT
CEO
Business
development Legal Finance Hr resources
Global growth
and operations Capital
Health and
business
solution
Healthcare Transportati
on
4. Organizational structure of the project
An organizational structure is one of the systems that is helpful in properly outlining
different types of activities which are directed for achieving the organizational objectives of the
project. The organizational structure of the café is provided below and it is found that the
structure is also helpful in reporting requirements of the project.
Figure 1: Organizational structure
(Source: Created by Author)

8
PROJECT MANAGEMENT
5. Legislative actions requirements that needs to be considered
The legislative actions which are mainly needed to be considered while opening a café in
healthcare are mainly listed below:
Taxation: It is found that in order to pay GST, one need to register the shop with the
Australian Taxation office. Paying GST means that the shop is reporting obligations including
the submissions of BAS statements.
Insurance: The café must have proper insurance named Public liability insurance. It is
found that these types of insurance help in covering for third party-based liabilities that arises in
the premises.
License: Food and safety license must be permitted before opening of the café that is
mainly required for safeguarding public health and generally assists in ensuring the food quality.
6. Project requirement including physical, material, human and financial
The different types of resources including physical, material, human as well as financial
resources which are required for the project are listed below:
Physical resources: The physical resources which are needed for opening of a café
include:
Automatic drip coffee makers
High quality Espresso machine
Security system
Refrigeration system
Oven, Toasters as well as other devices that needed for cooking
PROJECT MANAGEMENT
5. Legislative actions requirements that needs to be considered
The legislative actions which are mainly needed to be considered while opening a café in
healthcare are mainly listed below:
Taxation: It is found that in order to pay GST, one need to register the shop with the
Australian Taxation office. Paying GST means that the shop is reporting obligations including
the submissions of BAS statements.
Insurance: The café must have proper insurance named Public liability insurance. It is
found that these types of insurance help in covering for third party-based liabilities that arises in
the premises.
License: Food and safety license must be permitted before opening of the café that is
mainly required for safeguarding public health and generally assists in ensuring the food quality.
6. Project requirement including physical, material, human and financial
The different types of resources including physical, material, human as well as financial
resources which are required for the project are listed below:
Physical resources: The physical resources which are needed for opening of a café
include:
Automatic drip coffee makers
High quality Espresso machine
Security system
Refrigeration system
Oven, Toasters as well as other devices that needed for cooking

9
PROJECT MANAGEMENT
Human resources: The human resources who are involved with the opening of the café
include:
Project manager
Project planner
HR manager
Finance manager
Operational manager
Market analyst
Material resources: The material resources which are mainly needed in order to open a café
in Sydney are listed below:
Oven, Toasters and devices for cooking
Coffee materials
Few industrial blenders
Cake and pastry maker
Containers and pumps
Assorted miscellaneous
Adequate shelving
Financial resources: It is found that around $69, 160 is needed for opening of a café in
Sydney.
PROJECT MANAGEMENT
Human resources: The human resources who are involved with the opening of the café
include:
Project manager
Project planner
HR manager
Finance manager
Operational manager
Market analyst
Material resources: The material resources which are mainly needed in order to open a café
in Sydney are listed below:
Oven, Toasters and devices for cooking
Coffee materials
Few industrial blenders
Cake and pastry maker
Containers and pumps
Assorted miscellaneous
Adequate shelving
Financial resources: It is found that around $69, 160 is needed for opening of a café in
Sydney.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

10
PROJECT MANAGEMENT
7. Budget of the project
The table that is provided below reflects that around $69,160 is needed for opening a café
in Sydney.
PROJECT MANAGEMENT
7. Budget of the project
The table that is provided below reflects that around $69,160 is needed for opening a café
in Sydney.

11
PROJECT MANAGEMENT
8. Detailed timelines with responsibilities in Gantt chart
The Gantt chart that is provided below not only reflects on the detailed timeline but also
on the person who are responsible for completing the different project activities.
Figure 2: Gantt chart
(Source: Created by Author)
PROJECT MANAGEMENT
8. Detailed timelines with responsibilities in Gantt chart
The Gantt chart that is provided below not only reflects on the detailed timeline but also
on the person who are responsible for completing the different project activities.
Figure 2: Gantt chart
(Source: Created by Author)

12
PROJECT MANAGEMENT
9. Risk assessment and risk management strategies including risk register
Risk Description Impact Probability Mitigation
strategy
Schedule
slippage
If the schedule
of the project
gets slipped then
it would be
difficult to finish
the project on
time.
High High Weekly basis
tracking of the
project is mainly
needed in order
to finish the
entire project on
time.
Proper legal
actions done
If the legal
actions are not
done properly
then there will
be high risk of
legal laws
violation
High Medium All the legal
actions including
license as well
as insurance
should be done
after the project
completion.
Budget shortfall If the budget of
the project is not
enough then the
café cannot get
set up in a
proper time.
High High The budget for
the project need
to be estimated
before starting
the project.
PROJECT MANAGEMENT
9. Risk assessment and risk management strategies including risk register
Risk Description Impact Probability Mitigation
strategy
Schedule
slippage
If the schedule
of the project
gets slipped then
it would be
difficult to finish
the project on
time.
High High Weekly basis
tracking of the
project is mainly
needed in order
to finish the
entire project on
time.
Proper legal
actions done
If the legal
actions are not
done properly
then there will
be high risk of
legal laws
violation
High Medium All the legal
actions including
license as well
as insurance
should be done
after the project
completion.
Budget shortfall If the budget of
the project is not
enough then the
café cannot get
set up in a
proper time.
High High The budget for
the project need
to be estimated
before starting
the project.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

13
PROJECT MANAGEMENT
Improper
market analysis
If market
analysis was not
done
successfully then
it would be quite
difficult to gain
competitive
advantage by
providing proper
benefits to the
customers.
Medium Medium It is quite
important to
analyze the
market properly
for giving proper
facilities to the
customers so
that the
customers can
gain competitive
advantage.
PROJECT MANAGEMENT
Improper
market analysis
If market
analysis was not
done
successfully then
it would be quite
difficult to gain
competitive
advantage by
providing proper
benefits to the
customers.
Medium Medium It is quite
important to
analyze the
market properly
for giving proper
facilities to the
customers so
that the
customers can
gain competitive
advantage.

14
PROJECT MANAGEMENT
Bibliography
Archibald, R.D. and Archibald, S., 2016. Leading and Managing Innovation: What Every
Executive Team Must Know about Project, Program, and Portfolio Management. Auerbach
Publications.
Badewi, A., 2016. The impact of project management (PM) and benefits management (BM)
practices on project success: Towards developing a project benefits governance
framework. International Journal of Project Management, 34(4), pp.761-778.
Hornstein, H.A., 2015. The integration of project management and organizational change
management is now a necessity. International Journal of Project Management, 33(2), pp.291-
298.
Kivilä, J., Martinsuo, M. and Vuorinen, L., 2017. Sustainable project management through
project control in infrastructure projects. International Journal of Project Management, 35(6),
pp.1167-1183.
Kolić, D., Brandić, V., Jaki, D. and Novak, L., 2018, January. Gantt chart analysis to improve
shipbuilding panel line assembly. In SOME 2018, the 6th Annual International SOME
Symposium (Ship Operations, Management and Economics).
O'Har, J.P., Senesi, C.W. and Molenaar, K.R., 2017. Development of a risk register spreadsheet
tool for enterprise-and program-level risk management. Transportation research
record, 2604(1), pp.19-27.
PROJECT MANAGEMENT
Bibliography
Archibald, R.D. and Archibald, S., 2016. Leading and Managing Innovation: What Every
Executive Team Must Know about Project, Program, and Portfolio Management. Auerbach
Publications.
Badewi, A., 2016. The impact of project management (PM) and benefits management (BM)
practices on project success: Towards developing a project benefits governance
framework. International Journal of Project Management, 34(4), pp.761-778.
Hornstein, H.A., 2015. The integration of project management and organizational change
management is now a necessity. International Journal of Project Management, 33(2), pp.291-
298.
Kivilä, J., Martinsuo, M. and Vuorinen, L., 2017. Sustainable project management through
project control in infrastructure projects. International Journal of Project Management, 35(6),
pp.1167-1183.
Kolić, D., Brandić, V., Jaki, D. and Novak, L., 2018, January. Gantt chart analysis to improve
shipbuilding panel line assembly. In SOME 2018, the 6th Annual International SOME
Symposium (Ship Operations, Management and Economics).
O'Har, J.P., Senesi, C.W. and Molenaar, K.R., 2017. Development of a risk register spreadsheet
tool for enterprise-and program-level risk management. Transportation research
record, 2604(1), pp.19-27.

15
PROJECT MANAGEMENT
Ong, H.Y., Wang, C. and Zainon, N., 2016. Integrated earned value Gantt chart (EV-Gantt) tool
for project portfolio planning and monitoring optimization. Engineering Management
Journal, 28(1), pp.39-53.
Sánchez, M.A., 2015. Integrating sustainability issues into project management. Journal of
Cleaner Production, 96, pp.319-330.
Svejvig, P. and Andersen, P., 2015. Rethinking project management: A structured literature
review with a critical look at the brave new world. International Journal of Project
Management, 33(2), pp.278-290.
Todorović, M.L., Petrović, D.Č., Mihić, M.M., Obradović, V.L. and Bushuyev, S.D., 2015.
Project success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), pp.772-783.
PROJECT MANAGEMENT
Ong, H.Y., Wang, C. and Zainon, N., 2016. Integrated earned value Gantt chart (EV-Gantt) tool
for project portfolio planning and monitoring optimization. Engineering Management
Journal, 28(1), pp.39-53.
Sánchez, M.A., 2015. Integrating sustainability issues into project management. Journal of
Cleaner Production, 96, pp.319-330.
Svejvig, P. and Andersen, P., 2015. Rethinking project management: A structured literature
review with a critical look at the brave new world. International Journal of Project
Management, 33(2), pp.278-290.
Todorović, M.L., Petrović, D.Č., Mihić, M.M., Obradović, V.L. and Bushuyev, S.D., 2015.
Project success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), pp.772-783.
1 out of 16
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.