North Hill College Registration System Analysis and Design Report
VerifiedAdded on 2022/10/11
|15
|1459
|24
Report
AI Summary
This report details the system analysis and design for a new online registration system at North Hill College. It begins by justifying the need for the system and presents a comprehensive business case, highlighting benefits for both students and the college administration. The project scope is defined, including cost and schedule analysis. The report utilizes various diagrammatic tools, such as use case, sequence, context level, and data flow diagrams (DFD) to model the system's processes. An entity-relationship diagram (ERD) is also included to represent the data model. Screen interfaces are provided to illustrate the user experience. A Gantt chart outlines the project timeline. The report concludes with a bibliography of cited sources. The system aims to streamline the registration process, allowing students to choose courses, view results, and manage their academic information efficiently while reducing manual processes for the college staff. The report covers the complete system development life cycle, from initial analysis to design and implementation planning.

Running head: SYSTEM ANALYSIS AND DESIGN
Developing Registration System for North Hill College
Name of Student-
Name of University-
Author’s Note-
Developing Registration System for North Hill College
Name of Student-
Name of University-
Author’s Note-
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1SYSTEM ANALYSIS AND DESIGN
Table of Contents
1. Need of developing the system....................................................................................................1
2. Business Case..............................................................................................................................1
2.1 Business benefits...................................................................................................................2
3. Project Scope...............................................................................................................................2
3.1 Cost and Schedule analysis....................................................................................................3
4. Use Case Diagram.......................................................................................................................4
5. Sequence Diagram.......................................................................................................................5
6. Context level Diagram.................................................................................................................6
7. DFD diagram with one process exploded....................................................................................6
8. Entity Relationship Diagram.......................................................................................................7
9. Screen Interfaces..........................................................................................................................8
10. Gantt chart...............................................................................................................................11
Bibliography..................................................................................................................................12
Table of Contents
1. Need of developing the system....................................................................................................1
2. Business Case..............................................................................................................................1
2.1 Business benefits...................................................................................................................2
3. Project Scope...............................................................................................................................2
3.1 Cost and Schedule analysis....................................................................................................3
4. Use Case Diagram.......................................................................................................................4
5. Sequence Diagram.......................................................................................................................5
6. Context level Diagram.................................................................................................................6
7. DFD diagram with one process exploded....................................................................................6
8. Entity Relationship Diagram.......................................................................................................7
9. Screen Interfaces..........................................................................................................................8
10. Gantt chart...............................................................................................................................11
Bibliography..................................................................................................................................12

2SYSTEM ANALYSIS AND DESIGN
1. Need of developing the system
The North Hill College needs to implement a new online registration system for the
student who want to register themselves with the college. The administrator needs to improve the
registration process in the college so that the students can easily register themselves. The new
system that is being developed for the college will help the student to choose their respective
courses and register themselves. The can also view their course result from the IS system. All
information related with the college will be kept up to date so that the students get informed
about all instruction about their academic courses.
2. Business Case
This information system would be benefited for the student as well as the college
administer as because the manual process would be reduced by launching this IS system in the
college website. With this system the registration process can be automated and the students can
register easily in the system by selecting their course they want.
With the new IS system, the student will be able to change their courses within duration
of two week from the registration. This would enable the students to have a customized courses
even after the registration is completed. The students can also view their semester results at the
end of the semester using this IS system. In the new information system, the lecturers can view
the details of the new students registering in the system and can contact them if any information
is to be given to them regarding the course details.
The development methodology of the project used for developing the JAD (Joint
Application Development) includes the client end design as well as the user end design that is to
1. Need of developing the system
The North Hill College needs to implement a new online registration system for the
student who want to register themselves with the college. The administrator needs to improve the
registration process in the college so that the students can easily register themselves. The new
system that is being developed for the college will help the student to choose their respective
courses and register themselves. The can also view their course result from the IS system. All
information related with the college will be kept up to date so that the students get informed
about all instruction about their academic courses.
2. Business Case
This information system would be benefited for the student as well as the college
administer as because the manual process would be reduced by launching this IS system in the
college website. With this system the registration process can be automated and the students can
register easily in the system by selecting their course they want.
With the new IS system, the student will be able to change their courses within duration
of two week from the registration. This would enable the students to have a customized courses
even after the registration is completed. The students can also view their semester results at the
end of the semester using this IS system. In the new information system, the lecturers can view
the details of the new students registering in the system and can contact them if any information
is to be given to them regarding the course details.
The development methodology of the project used for developing the JAD (Joint
Application Development) includes the client end design as well as the user end design that is to
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3SYSTEM ANALYSIS AND DESIGN
be included in the system. This methodology helps to create the applications more quickly and
also reuses the
2.1 Business benefits
The IS system would provide the business in many ways. The benefits are listed below.
The system would help the admin of the college to upload all the details regarding the
college administration system and the registration system.
The IS system will take the details of the college courses that are provided by the college.
The students will be able register themselves online in the new IS system in the system.
The student can also view the courses details in the IS system, that would reduce the
pressure of the registration office in the college.
The student can also view their academic result from the IS system at the end of the
semester.
3. Project Scope
The project scope is to develop an IS system (Information system) that would be able to
make the registration system efficient in the North Hill College. This system would make the
system more efficient and would reduce the working pressure of the administrative staffs in the
college. The college would also have manually registration process in the college campus but
with the online system, the extreme pressure on the system would be reduced.
This project will deliver a project plan that would be used for developing the new is IS
system for the college and will provide total budget for the project that would be needed to build
the system. This system will include many functions that would help the students and the college
be included in the system. This methodology helps to create the applications more quickly and
also reuses the
2.1 Business benefits
The IS system would provide the business in many ways. The benefits are listed below.
The system would help the admin of the college to upload all the details regarding the
college administration system and the registration system.
The IS system will take the details of the college courses that are provided by the college.
The students will be able register themselves online in the new IS system in the system.
The student can also view the courses details in the IS system, that would reduce the
pressure of the registration office in the college.
The student can also view their academic result from the IS system at the end of the
semester.
3. Project Scope
The project scope is to develop an IS system (Information system) that would be able to
make the registration system efficient in the North Hill College. This system would make the
system more efficient and would reduce the working pressure of the administrative staffs in the
college. The college would also have manually registration process in the college campus but
with the online system, the extreme pressure on the system would be reduced.
This project will deliver a project plan that would be used for developing the new is IS
system for the college and will provide total budget for the project that would be needed to build
the system. This system will include many functions that would help the students and the college
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4SYSTEM ANALYSIS AND DESIGN
administration to complete their registration on time and would also help the students to change
their courses in two weeks duration of time after registration being completed.
This report will detail the designing process to develop IS system for the North Hill
College. The report will state the use case diagram for IS system showing all the actors
associated with the IS system. This report will also explain the sequence diagram explaining one
of the process included in the system. There is a context diagram and a data flow diagram that
would show the processes that are carried out in the system. The ERD of the IS system is also
shown in this report that would define the primary keys and the foreign keys that are associated
with the system. 3 screen interfaces of the system are shown in the report showing the interface
from the customer end and admin end.
3.1 Cost and Schedule analysis
For developing the IS system for the North Hill college, the total cost of developing the
system will be $202,920. The system would be completed with the specified budget and will
include all the phases that are stated in the project plan schedule of the project. The budget of
developing the system should not exclude as that will lead to failure of the project.
administration to complete their registration on time and would also help the students to change
their courses in two weeks duration of time after registration being completed.
This report will detail the designing process to develop IS system for the North Hill
College. The report will state the use case diagram for IS system showing all the actors
associated with the IS system. This report will also explain the sequence diagram explaining one
of the process included in the system. There is a context diagram and a data flow diagram that
would show the processes that are carried out in the system. The ERD of the IS system is also
shown in this report that would define the primary keys and the foreign keys that are associated
with the system. 3 screen interfaces of the system are shown in the report showing the interface
from the customer end and admin end.
3.1 Cost and Schedule analysis
For developing the IS system for the North Hill college, the total cost of developing the
system will be $202,920. The system would be completed with the specified budget and will
include all the phases that are stated in the project plan schedule of the project. The budget of
developing the system should not exclude as that will lead to failure of the project.

5SYSTEM ANALYSIS AND DESIGN
4. Use Case Diagram
Figure 1: Use Case Diagram
(Source: Created by Author using Visio)
4. Use Case Diagram
Figure 1: Use Case Diagram
(Source: Created by Author using Visio)
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6SYSTEM ANALYSIS AND DESIGN
5. Sequence Diagram
Figure 2: Sequence Diagram
(Source: Created by Author using Visio)
5. Sequence Diagram
Figure 2: Sequence Diagram
(Source: Created by Author using Visio)
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7SYSTEM ANALYSIS AND DESIGN
6. Context level Diagram
Figure 3: Context Diagram
(Source: Created by Author using Visio)
7. DFD diagram with one process exploded
Figure 4: Data Flow Diagram
(Source: Created by Author using Visio)
6. Context level Diagram
Figure 3: Context Diagram
(Source: Created by Author using Visio)
7. DFD diagram with one process exploded
Figure 4: Data Flow Diagram
(Source: Created by Author using Visio)

8SYSTEM ANALYSIS AND DESIGN
8. Entity Relationship Diagram
Figure 5: Entity Relationship Diagram
(Source: Created by Author using Visio)
8. Entity Relationship Diagram
Figure 5: Entity Relationship Diagram
(Source: Created by Author using Visio)
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9SYSTEM ANALYSIS AND DESIGN
9. Screen Interfaces
Figure 6: Main page Interface
(Source: Created by Author using Balsamic)
9. Screen Interfaces
Figure 6: Main page Interface
(Source: Created by Author using Balsamic)
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10SYSTEM ANALYSIS AND DESIGN
Figure 7: Sign Up page Interface
(Source: Created by Author using Balsamic)
Figure 7: Sign Up page Interface
(Source: Created by Author using Balsamic)

11SYSTEM ANALYSIS AND DESIGN
Figure 8: View Marksheet page Interface
(Source: Created by Author using Balsamic)
Figure 8: View Marksheet page Interface
(Source: Created by Author using Balsamic)
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 15
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.




