This project document outlines a detailed design brief for a telecommunication project. It covers project objectives, which include establishing a telecommunication link between two offices and implementing Wi-Max internet access. The project scope encompasses gathering technical and non-technical requirements for the project's design and development. The document includes an analysis of existing project management methods like Agile, Scrum, and PRINCE2. It also defines design principles such as balance, alignment, contrast, and proximity. The project deliverables are clearly listed, along with inclusion and exclusion criteria, assumptions, risks, and a budget of $60,000. Hardware and software suggestions are provided, and user scenarios and constraints are also discussed. The document concludes with a sign-off section and a bibliography, providing a comprehensive overview of the project's design and implementation strategy.
Document Page
Running head: ASSESSMENT 2
Preparation of a detailed design brief
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1ASSESSMENT 2
Table of Contents
Assessment 2.......................................................................................................................2
Project objectives.................................................................................................................2
Project scope....................................................................................................................2
Project problem statement...............................................................................................3
Design plan including relevant geographical and topological information, equipment
and material and cost estimates...................................................................................................3
Analysis of existing methods/ approaches.......................................................................3
The design principle of the new and required solution....................................................4
Project deliverables..........................................................................................................5
Inclusion/ exclusion.........................................................................................................6
Assumptions or risks........................................................................................................6
Budget..............................................................................................................................6
Hardware/ software suggestions......................................................................................6
User scenario...................................................................................................................6
Constraints.......................................................................................................................6
Signoff.............................................................................................................................6
Bibliography........................................................................................................................7
Document Page
2ASSESSMENT 2
Assessment 2
Project objectives
The project plan is based on design as well as development of telecommunication project
which is being implemented by small IT Company. The office is consisted 3 rooms which is
accommodated all the servers in addition to telecommunication equipments. The client has
opened a new office in suburb as well as they are required telecommunication link among two of
the offices. The project manager as well as team members can collect technical plus non-
technical needs of the project plan. Following are list of the project objectives such as:
To determine technical as well as non-technical needs of the telecommunication
implementation project
To develop new office in suburb, network and system needed for the
implementation of telecommunication project
To finish the project work in the scheduled time of 8 months as well as estimated
budget of $60,000
To incorporate of Wi-Max internet access for creating connections between two
of the offices
Project scope
The scope of this project plan is to gather the technical as well as non-technical
requirements of the telecommunication project so that there is preparing of detailed project
design. The customers are running public access to the internet center into the city area. The
space of office which is selected has three offices as well as frontage. Two of the rooms are
Document Page
3ASSESSMENT 2
accommodated all the servers while one of the room is accommodated telecommunication
devices as well as equipments. The client has opened new office into suburb while there are
required to open the telecommunication linkage among two various offices. In order to design as
well as develop technical infrastructure, it is require to access to Wi-Max facilities for accessing
to internet with microwave connection among two of the offices. The scope is to prepare the
document by the project team and the client can approve the project as reference to detailed
design.
Project problem statement
Due to lack of the operational as well as functional project activities, the company is
required to face risks which are providing effects on successful implementation of the
telecommunication project. The team members those are involved into the project work has
lack of technical skills to complete the work on time, therefore they are required to provide
proper training so that the work is completed on scheduled time.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4ASSESSMENT 2
Design plan including relevant geographical and topological information, equipment
and material and cost estimates
Analysis of existing methods/ approaches
In order to develop the telecommunication project, there is required to analyze the project
management methods as well as approaches such as:
Agile: This approach is a value centered methods of the project management which can
allow the project to process into smaller phases as well as project lifecycle. The method is
Document Page
5ASSESSMENT 2
flexible which can benefit from the process so that the project manager can work in environment
which can treat the project milestones.
Scrum: This method can reveal lengthy processes when the planning is to be taken place
a couple of months before the project manager can move to next design phases. The planning is
required to kick off the project as it is dependent on the agile framework.
PRINCE2: This method is required so that the project is to be completed on scheduled
timeframe and the outputs are being defined as well as there is proper justification of the project
to the project client. The method is to be featured by the projects which are to be delivered on
schedule timeframe as well as estimation of the project cost. The roles of project team members
are defined before the project kick off and each of the project team can aware of their
responsibilities towards execution of the project work.
The design principle of the new and required solution
Following are the list of the design principles which are to be taken into considerations
for the implementation of the telecommunication project such as:
Balance: Balance into design of office space is required to balance in information
technology. It is provided with stability as well as structure to the project design. The weight of
distributed into the design by means of placement of the project elements.
Alignment: It is allowed to create order as well as organization by alignment elements
permits to create IT connections between two offices.
Contrast: It is opposed with the elements which can allow emphasizing and highlighting
with the key elements into the project design.
Document Page
6ASSESSMENT 2
Proximity: It can create relationships among the elements which are required to develop
an IT infrastructure into the new office space. It is provided with focal point. They are visually
connected with each others.
Project deliverables
In order to develop a new office in suburb, the project is based on creating a
telecommunication project so that they can create connections between two of the office braches.
The project documents are to be approved by the project team members as well as project
manager so that they can approve it. The project team members those have lack of technical
skills can get training to handle the technical equipments so that they can meet with the project
requirements. The lists of the project deliverables which are required for the telecommunication
project are:
Project Charter
Risk management plan
Network and purchase management plan
Technical documents
Training manuals
Project budget and schedule plan
Design review
Project progress report
Feasibility study
Usability report
Product prototype
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7ASSESSMENT 2
Inclusion/ exclusion
The details project objectives, problem statement; design plan details that are related to
the geographical and topological information, equipments, and materials as well as cost
estimation are included in this project document. Not only this but also the current methods and
approaches required for the successful implementation of the project are also illustrated in this
project. The ways through which the office space will be accommodated are elaborated. Besides
this, in order to facilitate the Wi Max internet access and microwave connection between the
main office and the branch office are part of the project activity. The technical and non technical
requirements that will help the project team associates to meet the project objectives included in
the project discussion details. In addition to this, the techniques of project funding and reference
technicians are discussed in the project brief.
The stakeholder engagement practices, list of stakeholders their power, interest and
influence are not included in this project. Apart from this, the potential risks and issues are
identified and analyzed for the project but the probable mitigation techniques that may used to
completely resolve and mitigate the possible risk excluded. In addition to this, based on the
project complexity how the project can be properly distributed are not parts of the project
documentation. In other words the project details that are to be followed throughout the project
life cycle period to meet the objectives are excluded in this documentation. How change
management plan can be implemented and also for which activities change management actions
are required are excluded in this discussion.
Assumptions or risks
The potential risks that may interrupt the regular expected objectives of the project are as
follows:
Document Page
8ASSESSMENT 2
Lack of technical experience and knowledge among the project team members
Lack of communication
Inaccurate process flow
Security risks and issues
Operational and functional risks
Overrunning budget and time
Budget
Budgeting is referred to as an very essential project management tool that is used by the
projects leaders to measure whether the project will be a success or a failure. The project budget
includes detail project estimation. The technique of budget estimation also varies a lot each other
based on the nature, type and size. The costs are considered for labours, materials and operation.
This project is about development of a telecommunication link between the office branches. Not
only this but also, WI Max facility is also required to be implemented by the end of this project.
It has been determined that the project will be accomplished within an estimated budget of
$60,000
Hardware/ software suggestions
In order to accomplish the telecommunication connection building project in the main
office and branch office different hardware and software are required. It is responsibility of the
project supervisor and team members to accomplish the project activities based on the primary
requirements and objectives. The hardware required for the completion of the project are
computers, router, LAN, WAN, Ethernet, CPU, laptop.
Document Page
9ASSESSMENT 2
The software those will be required for the successful implementation of the project are
redhat server software, antivirus software, Operating system, firewall application software are
the software required for the successful implementation of the project. It will also help to
maintain the overall security of the system. It can be said that if all the mentioned security
measures are implemented by the project team during implementation of the project then, none
of the external users will be able to access the information
User scenario
Constraints
For this particular project triple project constraint has been evaluated in terms of budget,
time and scope. The responsibility of the project supervisor and the team members are to
accomplish the activities professionally to gain commercial profit and economic support as well.
The total budget that has been estimated for the project is $60,000 and the total time which is
determined for the project is 8 months.
Signoff
As soon as a project gets finished it becomes responsibility of the project lead to ensure
that the project outcomes and outputs have meets the primary company and client expectations
and objectives. At the end of the project the lead or supervisor should create a project signoff
document. This is a project acceptance agreement. In this phase the project lead should create a
checklist for testing the reporting system. For this project the signoff checklist include the below
components:
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10ASSESSMENT 2
Stakeholders Names Dates
Project manager <Please fill> 6/10/2019
Finance manager <Please fill> 6/10/2019
Operation manager <Please fill> 6/10/2019
Information system developer <Please fill> 6/10/2019
System designer <Please fill> 6/10/2019
Tester <Please fill> 6/10/2019
Business analyst <Please fill> 6/10/2019
Document Page
11ASSESSMENT 2
Bibliography
Harrison, Frederick, and Dennis Lock. Advanced project management: a structured approach.
Routledge, 2017.
Heagney, Joseph. Fundamentals of project management. Amacom, 2016.
Kerzner, Harold, and Harold R. Kerzner. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons, 2017.
Kerzner, Harold. Project management best practices: Achieving global excellence. John Wiley &
Sons, 2018.
Larson, Erik W., and Clifford F. Gray. Project management: The managerial process. McGraw-
Hill Education, 2017.
Meredith, Jack R., Samuel J. Mantel Jr, and Scott M. Shafer. Project management: a managerial
approach. John Wiley & Sons, 2017.
Schwalbe, Kathy. Information technology project management. Cengage Learning, 2015.
Turner, Rodney. Gower handbook of project management. Routledge, 2016.