Higher National Diploma in Business: TESCO CSR Project Report - Unit 6
VerifiedAdded on 2020/01/21
|18
|3963
|526
Report
AI Summary
This report analyzes a business project focused on Corporate Social Responsibility (CSR) at TESCO plc. It begins by establishing project aims and objectives, emphasizing CSR's impact on organizational effectiveness and community development. A management plan is developed, outlining project scope, risk management, cost control, quality control, and resource management. The report then details a work breakdown structure and a Gantt chart for project timelines. Small-scale research methods, including questionnaires and secondary data analysis, are employed to gather information on customer perceptions of TESCO's CSR activities. The data collected is analyzed and interpreted to assess the impact of CSR initiatives. Recommendations are provided for TESCO to enhance its CSR strategies and improve societal benefits. The report concludes with a reflection on the value of the research and its contribution to organizational learning and performance. The report is well-structured, covering all aspects of project management from planning and execution to analysis and recommendation.

Managing A Successful
Business Project
Business Project
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
INTRODUCTION...........................................................................................................................3
TASK 1............................................................................................................................................3
P1 Project aims and objectives based on Corporate Social Responsibility:...........................3
TASK 2............................................................................................................................................4
P2 Establishment of management plan:.................................................................................4
TASK 3............................................................................................................................................6
P3 Work break down structure and Gantt Chart for time frames:..........................................6
TASK 4............................................................................................................................................8
P4 Small scale research methods suitable for meeting project aims and objectives:.............8
P5 Analysis and interpretation of data:................................................................................10
TASK 6..........................................................................................................................................14
P6 Recommendations for TESCO:.......................................................................................14
TASK 7..........................................................................................................................................15
P7 Reflecting value of undertaking the research to meet stated objectives, learning and
performance:.........................................................................................................................15
CONCLUSION..............................................................................................................................16
REFERENCES..............................................................................................................................17
INTRODUCTION...........................................................................................................................3
TASK 1............................................................................................................................................3
P1 Project aims and objectives based on Corporate Social Responsibility:...........................3
TASK 2............................................................................................................................................4
P2 Establishment of management plan:.................................................................................4
TASK 3............................................................................................................................................6
P3 Work break down structure and Gantt Chart for time frames:..........................................6
TASK 4............................................................................................................................................8
P4 Small scale research methods suitable for meeting project aims and objectives:.............8
P5 Analysis and interpretation of data:................................................................................10
TASK 6..........................................................................................................................................14
P6 Recommendations for TESCO:.......................................................................................14
TASK 7..........................................................................................................................................15
P7 Reflecting value of undertaking the research to meet stated objectives, learning and
performance:.........................................................................................................................15
CONCLUSION..............................................................................................................................16
REFERENCES..............................................................................................................................17

INTRODUCTION
Business projects are undertaken by the managers as to develop plans and policies for the
company. These plans and strategies are developed for improving companies productivity and
efficiency. The managers who are managing the project development should consider all the
facts and figures for understanding the variability of different factors. This helps them in
ensuring that right information is being used for developing the project. The project should also
focus on breaking down the work by using proper work breakdown structure and Gantt chart.
CSR(corporate social responsibility) is an activity which is undertaken by organisation to
establish good relationship with society and people. It also help the business in increasing its
brand value and recognition among people (Carvalho, and Rabechini Junior, 2015). CSR
activities have its own impact on the organisation performance. Chosen organisation is TESCO
plc which is running various CSR activities for society and business development
TASK 1
P1 Project aims and objectives based on Corporate Social Responsibility:
Project aims and objectives are set as to define why the project has been set up. What is
to be achieved by undertaking project. It is very vital for the project manager to set the aims and
objectives as it helps people in understanding the reason behind project existence. Aims and
objectives cover all the important issues which the report has addressed. The size of organisation
have an influence over the aims and objectives of project. Also the addressed issues impacts the
project (Chih, and Zwikael, 2015). There is a project initiation plan which needs to be
established to ensure that all the requirements have been taken into consideration before fixing
aims and objectives of the project:.
The project initiation plan describes about various topics:
 Project purpose: It states about why the project has been set up. What is the reason
behind it.
 Alternatives Analysis: Before setting any objectives and plans it evaluates about various
alternatives which has to analysed as to gather appropriate data. This data helps us in
analysing feasibility of alternatives.
 Planning Estimates: Plan are the blueprint which states various estimates which has been
taken as to prepare a plan.
Business projects are undertaken by the managers as to develop plans and policies for the
company. These plans and strategies are developed for improving companies productivity and
efficiency. The managers who are managing the project development should consider all the
facts and figures for understanding the variability of different factors. This helps them in
ensuring that right information is being used for developing the project. The project should also
focus on breaking down the work by using proper work breakdown structure and Gantt chart.
CSR(corporate social responsibility) is an activity which is undertaken by organisation to
establish good relationship with society and people. It also help the business in increasing its
brand value and recognition among people (Carvalho, and Rabechini Junior, 2015). CSR
activities have its own impact on the organisation performance. Chosen organisation is TESCO
plc which is running various CSR activities for society and business development
TASK 1
P1 Project aims and objectives based on Corporate Social Responsibility:
Project aims and objectives are set as to define why the project has been set up. What is
to be achieved by undertaking project. It is very vital for the project manager to set the aims and
objectives as it helps people in understanding the reason behind project existence. Aims and
objectives cover all the important issues which the report has addressed. The size of organisation
have an influence over the aims and objectives of project. Also the addressed issues impacts the
project (Chih, and Zwikael, 2015). There is a project initiation plan which needs to be
established to ensure that all the requirements have been taken into consideration before fixing
aims and objectives of the project:.
The project initiation plan describes about various topics:
 Project purpose: It states about why the project has been set up. What is the reason
behind it.
 Alternatives Analysis: Before setting any objectives and plans it evaluates about various
alternatives which has to analysed as to gather appropriate data. This data helps us in
analysing feasibility of alternatives.
 Planning Estimates: Plan are the blueprint which states various estimates which has been
taken as to prepare a plan.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

 Preliminary environmental evaluation: The project manager has to do environmental
audit for checking the authenticity of the research and validity of the research project.
The project initiation plan helps the project manager and employee's to understand various
requirements which needs to be fulfilled by the team (De Visscher, 2016). The Aims of
objectives will cover the following points:
 Mission and Vision: They will cover the short term and long term goals of the
organisation.
 Goals: They are the end results which will be required to be achieved by the organisation.
 Objectives: These help the manager in measuring the performance of employee's.
 Core competencies: These are the core values and ability of an organisation which
enables it to perform its task.
The chosen project research title is “Corporate Social Responsibility and Its impact on
Coates effectiveness”. The project is being undertaken with certain aims and objectives:
AIMS:
 To check the impact of CSR activities on organisation effectiveness
 To check the need to increase or decrease CSR funding
 Measure Community improvement in standard of living
 Impact on the environment.
Objectives:
 Improve CSR activities impact on the society
 Enhance relationship between organisation and society
 Provide data for developing more activities
 Increase the benefits for the society
audit for checking the authenticity of the research and validity of the research project.
The project initiation plan helps the project manager and employee's to understand various
requirements which needs to be fulfilled by the team (De Visscher, 2016). The Aims of
objectives will cover the following points:
 Mission and Vision: They will cover the short term and long term goals of the
organisation.
 Goals: They are the end results which will be required to be achieved by the organisation.
 Objectives: These help the manager in measuring the performance of employee's.
 Core competencies: These are the core values and ability of an organisation which
enables it to perform its task.
The chosen project research title is “Corporate Social Responsibility and Its impact on
Coates effectiveness”. The project is being undertaken with certain aims and objectives:
AIMS:
 To check the impact of CSR activities on organisation effectiveness
 To check the need to increase or decrease CSR funding
 Measure Community improvement in standard of living
 Impact on the environment.
Objectives:
 Improve CSR activities impact on the society
 Enhance relationship between organisation and society
 Provide data for developing more activities
 Increase the benefits for the society
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

TASK 2
P2 Establishment of management plan:
Management plan is the method which helps the manager in aligning the whole project
into one format. This plan includes all the indispensable factors which are necessary to be
considered as to make it more effective (Duffield, and Hornstein, Henry 2015). Management
plan should analyse all the fixed and variable factors which might impact the research project in
future. Fixed and variable factors location varies as some of them are internal factors and others
are external.
The management plan should have a structure which helps in reducing confusion over
roles and responsibilities of individuals. It should outline specific factors:
 Scope of project: This part of report states about the purpose for which this research has
been undertaken by the organisation. This report is being prepared to understand
Corporate Social Responsibility and Its impact on Tesco effectiveness. This research will
help Tesco in analysing whether they should increase or decrease the CSR activities with
the effectiveness of individual activity.
 Risk management: Risk is associated with every aspect of life and business. It is the
factor which comes with everything we buy and sell. Risk management helps in
understanding, analysing and addressing risk as to ensure that goals and objectives are
achieved by the organisation. For research report the project manager has to do analysis
of various cost and risk associated with those cost (Dutta, and Bose, 2015). This will
ensure that the expenditure wont turn into loss.
 Cost control: Cost control is a step which helps in keeping all the expenditure in control.
This helps in identifying and reducing various expenses which is being done for
completion of research project. The manager is able to calculate the actual results with
the standards and understand the variances involved in it. It is a important factor which
helps in maintaining profitability of an organisation.
 Quality control: This helps in keeping the untaken research quality as per the defined
standards. The project manager will be able to keep up the quality of research if the team
is well informed and everyone is focused on achieving goals and objectives.
 Resource management: Project manager has to ensure that all invested resources are
being utilised in a proper manner or not (Flouris, and Lock, 201I). The resource
P2 Establishment of management plan:
Management plan is the method which helps the manager in aligning the whole project
into one format. This plan includes all the indispensable factors which are necessary to be
considered as to make it more effective (Duffield, and Hornstein, Henry 2015). Management
plan should analyse all the fixed and variable factors which might impact the research project in
future. Fixed and variable factors location varies as some of them are internal factors and others
are external.
The management plan should have a structure which helps in reducing confusion over
roles and responsibilities of individuals. It should outline specific factors:
 Scope of project: This part of report states about the purpose for which this research has
been undertaken by the organisation. This report is being prepared to understand
Corporate Social Responsibility and Its impact on Tesco effectiveness. This research will
help Tesco in analysing whether they should increase or decrease the CSR activities with
the effectiveness of individual activity.
 Risk management: Risk is associated with every aspect of life and business. It is the
factor which comes with everything we buy and sell. Risk management helps in
understanding, analysing and addressing risk as to ensure that goals and objectives are
achieved by the organisation. For research report the project manager has to do analysis
of various cost and risk associated with those cost (Dutta, and Bose, 2015). This will
ensure that the expenditure wont turn into loss.
 Cost control: Cost control is a step which helps in keeping all the expenditure in control.
This helps in identifying and reducing various expenses which is being done for
completion of research project. The manager is able to calculate the actual results with
the standards and understand the variances involved in it. It is a important factor which
helps in maintaining profitability of an organisation.
 Quality control: This helps in keeping the untaken research quality as per the defined
standards. The project manager will be able to keep up the quality of research if the team
is well informed and everyone is focused on achieving goals and objectives.
 Resource management: Project manager has to ensure that all invested resources are
being utilised in a proper manner or not (Flouris, and Lock, 201I). The resource

management is a concept which helps in identifying the available and potential resources
which can be used for the research.
TASK 3
P3 Work break down structure and Gantt Chart for time frames:
Work break down structure defines how the hole task will be divided between different
people as to produce better results. The project manager has to determine various levels between
which the work will be divided. The concept helps the project manager in dividing the whole
task and getting it completed on time as to improve efficiency and effectiveness. It is developed
in a hierarchal subdivision of a project into work area's. The lowest is usually considered as a
activity or a work package. The lowest activity should be consistent and agreed with the making
of whole work break down structure (Kerzner, 2015). The work break down structure acts as a
foundation of all the activities which will be undertaken for the purpose of research. It helps in
planning cost and effort estimation, scheduling and resource allocation. There are certain benefits
of creating a work break down structure:
 Defines scope of research project
 Helps in assigning work to different individuals.
 Helps in establishing a control baseline
 It measure the performance on the basis of objective achievement
 collects and shares the information to all appropriate levels.
 Establishes relationship between aims, work, organisation and cost.
Work break down structure for the research report is:
which can be used for the research.
TASK 3
P3 Work break down structure and Gantt Chart for time frames:
Work break down structure defines how the hole task will be divided between different
people as to produce better results. The project manager has to determine various levels between
which the work will be divided. The concept helps the project manager in dividing the whole
task and getting it completed on time as to improve efficiency and effectiveness. It is developed
in a hierarchal subdivision of a project into work area's. The lowest is usually considered as a
activity or a work package. The lowest activity should be consistent and agreed with the making
of whole work break down structure (Kerzner, 2015). The work break down structure acts as a
foundation of all the activities which will be undertaken for the purpose of research. It helps in
planning cost and effort estimation, scheduling and resource allocation. There are certain benefits
of creating a work break down structure:
 Defines scope of research project
 Helps in assigning work to different individuals.
 Helps in establishing a control baseline
 It measure the performance on the basis of objective achievement
 collects and shares the information to all appropriate levels.
 Establishes relationship between aims, work, organisation and cost.
Work break down structure for the research report is:
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

WORK BREAK DOWN STRUCTURE
The organisation also have to fix a specific time frame to conduct all the activities. The
project manager is assigned with this task as to set a time frame for each activity. This will
ensure that the whole research is completed within a certain time frame.
Gantt Chart is a tool which helps the project manager in simplifying the process of devising
time frame. The Gantt chart explains various start and end date of different task as assigned in
work break down structure (Müller, 2016). The modern gantt chart also specifies various
dependency relationship between different activities. Gantt chart for specified activities is as
follows:
This chart will help the manager in measuring performance of various employee's.
Environment Evaluation
Project planning
Resource Allocation
External and
internal
Environment
Evaluation
Research Process
Evaluation of Results
Implementation
Area which need
development by
CSR
The organisation also have to fix a specific time frame to conduct all the activities. The
project manager is assigned with this task as to set a time frame for each activity. This will
ensure that the whole research is completed within a certain time frame.
Gantt Chart is a tool which helps the project manager in simplifying the process of devising
time frame. The Gantt chart explains various start and end date of different task as assigned in
work break down structure (Müller, 2016). The modern gantt chart also specifies various
dependency relationship between different activities. Gantt chart for specified activities is as
follows:
This chart will help the manager in measuring performance of various employee's.
Environment Evaluation
Project planning
Resource Allocation
External and
internal
Environment
Evaluation
Research Process
Evaluation of Results
Implementation
Area which need
development by
CSR
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Activities 1 to 7
Day
8 to 14
Day
15 to
21 Day
22 to
28 Day
29 to
35Day
36 to
42 Day
43 to
49 Day
50 to
56 Day
Setting aims and
objectives
Environment Evaluation
Project planning
Resource Allocation
Collecting data
Evaluating data
Implementation
Evaluation
TASK 4
P4 Small scale research methods suitable for meeting project aims and objectives:
An organisation like TESCO have huge sum of funds and hence they can adapt any
method of choice. But the most suitable method for doing research is questionnaire which will
provide exact information about the customer mind set. This is a primary data collection method
which has proven its worth.
Questionnaire:
Questionnaire
Name:
Age:
Gender:
Occupation:
1. Does CSR helps in society development?
 Yes
Day
8 to 14
Day
15 to
21 Day
22 to
28 Day
29 to
35Day
36 to
42 Day
43 to
49 Day
50 to
56 Day
Setting aims and
objectives
Environment Evaluation
Project planning
Resource Allocation
Collecting data
Evaluating data
Implementation
Evaluation
TASK 4
P4 Small scale research methods suitable for meeting project aims and objectives:
An organisation like TESCO have huge sum of funds and hence they can adapt any
method of choice. But the most suitable method for doing research is questionnaire which will
provide exact information about the customer mind set. This is a primary data collection method
which has proven its worth.
Questionnaire:
Questionnaire
Name:
Age:
Gender:
Occupation:
1. Does CSR helps in society development?
 Yes

 No
2. Is there any relationship between CSR and competitive advantage?
 Yes
 No
3. Is it the sole responsibility of organisation like TESCO to do CSR activities?
 Agreed
 Disagreed
 Neutral
4. Is TESCO is doing enough CSR activities?
 Yes
 No
5. Have you ever been a part of any CSR activity?
 Yes
 No
6. Did you receive benefit of any CSR activity done by TESCO?
 Yes
 No
7. Whose responsibility is it for developing and measuring CSR activities in organisation?
 Top Management
 Middle Management
 Lower Management
Sign
Qualitative method is useful in the given project. As this research method will help in
analysing the most important factors and knowledge of people regarding CSR activities
conducted by TESCO. This will also help the organisation in developing better understanding
2. Is there any relationship between CSR and competitive advantage?
 Yes
 No
3. Is it the sole responsibility of organisation like TESCO to do CSR activities?
 Agreed
 Disagreed
 Neutral
4. Is TESCO is doing enough CSR activities?
 Yes
 No
5. Have you ever been a part of any CSR activity?
 Yes
 No
6. Did you receive benefit of any CSR activity done by TESCO?
 Yes
 No
7. Whose responsibility is it for developing and measuring CSR activities in organisation?
 Top Management
 Middle Management
 Lower Management
Sign
Qualitative method is useful in the given project. As this research method will help in
analysing the most important factors and knowledge of people regarding CSR activities
conducted by TESCO. This will also help the organisation in developing better understanding
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

with the effectiveness of different CSR activities undertaken by TESCO. This method will also
help the project manager in simplifying the whole data interpretation method.
Secondary Data: This data has been collected from the available case studies on CSR activities
of Tesco. These case studies were taken from online sites. They described about the possible
benefits of the CSR activities undertaken by Tesco to promote communities and the business
profitability.
According to the case study published on European Monitoring Centre on change and IBS case
development centre, Tesco is slowly growing its share in CSR activities which is helping it in
retaining the market share and grow its profitability to new heights (Peters, Blohm, and
Leimeister, 2015). The CSR activities has been very profitable for company as it was able to
develop better image in the market while its support improved the standard of living of people.
P5 Analysis and interpretation of data:
The number of consulted people were 1000. These people were chosen randomly as to
keep the process of data collection unbiased and fair. The data is interpreted as per the result.
1. Does CSR helps in society development?
 Yes -800
 No -200
Interpretation: 80% of people agree that CSR activities help the society in developing and
improving living.
2. Is there any relationship between CSR and competitive advantage?
 Yes -660
Yes No
0
100
200
300
400
500
600
700
800
900
help the project manager in simplifying the whole data interpretation method.
Secondary Data: This data has been collected from the available case studies on CSR activities
of Tesco. These case studies were taken from online sites. They described about the possible
benefits of the CSR activities undertaken by Tesco to promote communities and the business
profitability.
According to the case study published on European Monitoring Centre on change and IBS case
development centre, Tesco is slowly growing its share in CSR activities which is helping it in
retaining the market share and grow its profitability to new heights (Peters, Blohm, and
Leimeister, 2015). The CSR activities has been very profitable for company as it was able to
develop better image in the market while its support improved the standard of living of people.
P5 Analysis and interpretation of data:
The number of consulted people were 1000. These people were chosen randomly as to
keep the process of data collection unbiased and fair. The data is interpreted as per the result.
1. Does CSR helps in society development?
 Yes -800
 No -200
Interpretation: 80% of people agree that CSR activities help the society in developing and
improving living.
2. Is there any relationship between CSR and competitive advantage?
 Yes -660
Yes No
0
100
200
300
400
500
600
700
800
900
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

 No -340
Interpretation: 66.6% people agree that these CSR activities help the company in gaining
competitive advantage over its competitors. Only 33.4% people disagree.
3. Is it the sole responsibility of organisation like TESCO to do CSR activities?
 Agreed- 50
 Disagreed- 650
 Neutral- 300
Yes No
0
100
200
300
400
500
600
700
Interpretation: 66.6% people agree that these CSR activities help the company in gaining
competitive advantage over its competitors. Only 33.4% people disagree.
3. Is it the sole responsibility of organisation like TESCO to do CSR activities?
 Agreed- 50
 Disagreed- 650
 Neutral- 300
Yes No
0
100
200
300
400
500
600
700

Interpretation: 65% disagree that it is the sole responsibility of Tesco to do CSR. They had a
collective view regarding this. They believe that most of the people said that it is Collective duty
of every industry player.
4. Is TESCO is doing enough CSR activities?
 Yes -600
 No- 400
Interpretation: 60% people think that Tesco is doing enough of the CSR activity to make an
impact on the society. While 40% disagree.
5. Have you ever been a part of any CSR activity?
Agreed Disagreed Neutral
0
100
200
300
400
500
600
700
Yes No
0
100
200
300
400
500
600
700
collective view regarding this. They believe that most of the people said that it is Collective duty
of every industry player.
4. Is TESCO is doing enough CSR activities?
 Yes -600
 No- 400
Interpretation: 60% people think that Tesco is doing enough of the CSR activity to make an
impact on the society. While 40% disagree.
5. Have you ever been a part of any CSR activity?
Agreed Disagreed Neutral
0
100
200
300
400
500
600
700
Yes No
0
100
200
300
400
500
600
700
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 18
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.