Project Management Report: Globalization Impact Analysis on Tesco

Verified

Added on  2024/06/28

|35
|5492
|112
Report
AI Summary
This report outlines a project management plan to analyze the impact of globalization on Tesco, a UK-based company. It establishes project aims and objectives, including increasing trade rates, forecasting labor migration, and assessing strategic measurements for revenue growth. The report includes a project management plan covering cost, scope, time, quality, communication, risk, and resources, along with a work breakdown structure (WBS) and Gantt chart to provide timeframes. It details small-scale research using qualitative and quantitative methods, analyzing data using appropriate tools and techniques to communicate recommendations and draw meaningful conclusions. The research incorporates surveys and interviews to gather data on economic, cultural, and ethical impacts, as well as the influence of globalization on business operations. The report also reflects on the value of undertaking the research to meet stated objectives and own learning and performance.
Document Page
Managing a Successful Business Project
Page | 0
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Table of Contents
Introduction
......................................................................................................................................2
LO1. Establish project aims, objectives and timeframes based on the chosen theme
.....................2
P1. Devise project aim and objectives for a chosen scenario
......................................................2
P2. Produce a project management plan that covers aspects of cost, scope, time, quality,

communication, risk and resources
..............................................................................................3
P3. Produce a work breakdown structure and a Gantt chart to provide timeframes and stages

for completion
..............................................................................................................................4
LO2. Conduct small-scale research, information gathering and data collection to generate

knowledge to support the project
...................................................................................................10
P4. Carry out small-scale research by applying qualitative and quantitative research methods

appropriate for meeting project aims and objectives
.................................................................10
LO3. Present the project and communicate appropriate recommendations based on meaningful

conclusions draw from the evidence findings and / or analysis
....................................................14
P5. Analyse research and data using appropriate tools and techniques
.....................................14
P6. Communicate appropriate recommendations as a result of research and data analysis to

draw valid and meaningful conclusions
....................................................................................26
LO4. Reflect on the value of undertaking the research to meet stated objectives and own learning

and performance
............................................................................................................................26
Reference List
................................................................................................................................ 28
Page | 1
Document Page
Introduction
Project managing helps to present the efficiency that can be obtained via various implications of

techniques as well as tools. In this project the importance of project management in terms of

types of impact by the various factors of the globalization that affects the performance and

activities of the UK based organization, Tesco will be potrayed. The other parts of the

assignment will demonstrate about the specification based on the Gantt chart and WBS structure.

LO1. Establish project aims, objectives and timeframes based on the chosen theme

P1. Devise project aim and objectives for a chosen scenario

Definition of project

Enhancement in the project has been done with the help of various parts of that delves with an

interpretation of procedures center rounding the tactics for collection of data.

Project aim

The framework tries to identify the significant matters that deals with the propagation of issues

and impact that takes place during execution of the project.

Company background

Tesco has been selected by the study that has been established in UK’s headquarters. The

company has the revenue of £63,911 million that operates the income of £2,206 million

(Tesco.com, 2019). The company serves 450,000 numbers of workers that have been enhanced

in the form of various subsidiaries.

Project objectives

To increase the rate of trade across different regions so that the organization
To forecast the level of labor migration for a start-up organization
To confine the materialization of the organization during the globalization period
To assess the impact of strategic measurement that will be implemented by the company
for a successful revenue rate

Page | 2
Document Page
Problem statement
Economic impact:
This can be comprehended into the form of cost curtailing (Lock, 2018).
Cultural impact:
cultural impact delves with an approach of different cross cultural involvement.
Ethical impact:
This can be explained via mitigation the issues gained from the market.
Data collection methods

This framework will be formed forward through primary procedure of data compilation

(Misopoulos
et al., 2018).
Sampling size and technique

In this framework 150 numbers of respondents for the assessment as well as for the interview 3

managers will be chosen.

P2. Produce a project management plan that covers aspects of cost, scope, time, quality,

communication, risk and resources

Enlistment of

Actions

Time taken (days)
Value/ rate per hour
(£)

Overall expenditure

(£)

Data aggregation

methodology

4
90 360
Review of the

data

5
75 375
Approval of the

Project

7
35 245
Execution of the

project

8
30 240
Overall
1,220
Page | 3
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
P3. Produce a work breakdown structure and a Gantt chart to provide timeframes and
stages for completion

Project management

The framework will be developed through involvement of significant parts.

Project scope

The weaker section will be highlighting in this framework (Steinke
et al., 2018).
Communication

Commutation skill will be enhanced via group members.

Resources and risks

Resources

This can be analyzed through the means of primary method for data collection (Taherdoost,

2018).

Risks

Week
Remembran
ce of threat

(Date)

Identified

Issues

Estimate

d value

Level of

authorit

y

Effect on

the

actions of

the

project

Action

taken to

eliminate

the threats

Opening

Week

10.3.2019
Miscommunicati
on takes place

due to an

involvement of

improper

communication

ability.

The

monitor

of the

group

will deal

with

such

hurdles.

H
The
monitor

of the

group

will help

to

mitigate

the hurdle

Through

the means

of

mitigating

the hurdle,

the monitor

will help to

provide

Page | 4
Document Page
that
delves

among

the

employee

s.

sustainable

outcome in

the

framework.

Subsequent

ly Week

20.3.2019
Financial gap is
one of the

significant

hurdles, which

presents ethical

problem in the

project.

The

monitor

of the

group

will look

after on

this

statement

of the

problem.

M
Framewo
rk will

gain

helping

hand by

monitors

of the

group,

which

will have

the access

to

mitigate

the

hurdles.

This will

help the

framework

to go with

further

developme

nt.

Short terms, which have been utilized-

M (Medium), H(High)

Work Breakdown Structure

Enlist

ment

of

Action

s

Classifying Events

Page | 5
Document Page
For scrutinizing several social, cultural as well as ethical influence of
globalization with respect to business operations of a Tesco.

1.0
Onset of Project
1.1
Groundwork study
1.2
Groundwork study categorization
1.3
Significant inquiries made for the purpose of survey
1.4
Channelizing the study’s expansion
2.0
Examination techniques of the project
2.1
Assembling of Data
Page | 6
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Page | 7
Document Page
Page | 8
Document Page
Page | 9
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
2.2 Secondary study
Page | 10
Document Page
2.3 Qualitative research as well as Qualitative Research
2.4
Data Surveying
2.5
Data implementation
3.0
Project Implementation
3.1
Documentation
3.2
Project’s evaluation
3.3
Project’s depiction
3.4
Assertion of the project
Table 2: Work breakdown structure

(Source: Developed by the learner)

Gantt chart (Table)

Sl. No.
Action’s
Enlistment

Initiation date
Interval of
actions (days)

Date for

execution the

project

1.0
Onset of Project 10.3.2019 10 20.3.2019
1.1
Groundwork
study

20.3.2019
5 25.3.2019
1.2
Groundwork
study

categorization

25.3.2019
5 30.3.2019
1.3
Significant
questions taken

for survey

purpose

30.3.2019
3 3.4.2019
1.4
Channelizing the
expansion of the

study

3.4.2019
7 10.4.2019
2.0
Project 10.4.2019 15 15.4.2019
Page | 11
chevron_up_icon
1 out of 35
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]