Business Project Management Plan: Tesco Case Study, Spring 2024

Verified

Added on  2025/05/12

|35
|4686
|452
AI Summary
Desklib provides solved assignments and past papers to help students succeed.
Document Page
Managing a Successful Business Project
Page | 0
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Table of Contents
Introduction......................................................................................................................................2
LO1. Establish project aims, objectives and timeframes based on the chosen theme.....................2
P1. Devise project aim and objectives for a chosen scenario......................................................2
P2. Produce a project management plan that covers aspects of cost, scope, time, quality,
communication, risk and resources..............................................................................................3
P3. Produce a work breakdown structure and a Gantt chart to provide timeframes and stages
for completion..............................................................................................................................4
LO2. Conduct small-scale research, information gathering and data collection to generate
knowledge to support the project...................................................................................................10
P4. Carry out small-scale research by applying qualitative and quantitative research methods
appropriate for meeting project aims and objectives.................................................................10
LO3. Present the project and communicate appropriate recommendations based on meaningful
conclusions draw from the evidence findings and / or analysis....................................................14
P5. Analyse research and data using appropriate tools and techniques.....................................14
P6. Communicate appropriate recommendations as a result of research and data analysis to
draw valid and meaningful conclusions....................................................................................26
LO4. Reflect on the value of undertaking the research to meet stated objectives and own learning
and performance............................................................................................................................26
Reference List................................................................................................................................28
Page | 1
Document Page
Introduction
Project managing helps to present the efficiency that can be obtained via various implications of
techniques as well as tools. In this project the importance of project management in terms of
types of impact by the various factors of the globalization that affects the performance and
activities of the UK based organization, Tesco will be potrayed. The other parts of the
assignment will demonstrate about the specification based on the Gantt chart and WBS structure.
LO1. Establish project aims, objectives and timeframes based on the chosen theme
P1. Devise project aim and objectives for a chosen scenario
Definition of project
Enhancement in the project has been done with the help of various parts of that delves with an
interpretation of procedures center rounding the tactics for collection of data.
Project aim
The framework tries to identify the significant matters that deals with the propagation of issues
and impact that takes place during execution of the project.
Company background
Tesco has been selected by the study that has been established in UK’s headquarters. The
company has the revenue of £63,911 million that operates the income of £2,206 million
(Tesco.com, 2019). The company serves 450,000 numbers of workers that have been enhanced
in the form of various subsidiaries.
Project objectives
To increase the rate of trade across different regions so that the organization
To forecast the level of labor migration for a start-up organization
To confine the materialization of the organization during the globalization period
To assess the impact of strategic measurement that will be implemented by the company
for a successful revenue rate
Page | 2
Document Page
Problem statement
Economic impact: This can be comprehended into the form of cost curtailing (Lock, 2018).
Cultural impact: cultural impact delves with an approach of different cross cultural involvement.
Ethical impact: This can be explained via mitigation the issues gained from the market.
Data collection methods
This framework will be formed forward through primary procedure of data compilation
(Misopoulos et al., 2018).
Sampling size and technique
In this framework 150 numbers of respondents for the assessment as well as for the interview 3
managers will be chosen.
P2. Produce a project management plan that covers aspects of cost, scope, time, quality,
communication, risk and resources
Enlistment of
Actions
Time taken (days) Value/ rate per hour
(£)
Overall expenditure
(£)
Data aggregation
methodology
4 90 360
Review of the
data
5 75 375
Approval of the
Project
7 35 245
Execution of the
project
8 30 240
Overall 1,220
Page | 3
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
P3. Produce a work breakdown structure and a Gantt chart to provide timeframes and
stages for completion
Project management
The framework will be developed through involvement of significant parts.
Project scope
The weaker section will be highlighting in this framework (Steinke et al., 2018).
Communication
Commutation skill will be enhanced via group members.
Resources and risks
Resources
This can be analyzed through the means of primary method for data collection (Taherdoost,
2018).
Risks
Week Remembran
ce of threat
(Date)
Identified
Issues
Estimate
d value
Level of
authorit
y
Effect on
the
actions of
the
project
Action
taken to
eliminate
the threats
Opening
Week
10.3.2019 Miscommunicati
on takes place
due to an
involvement of
improper
communication
ability.
The
monitor
of the
group
will deal
with
such
hurdles.
H The
monitor
of the
group
will help
to
mitigate
the hurdle
Through
the means
of
mitigating
the hurdle,
the monitor
will help to
provide
Page | 4
Document Page
that
delves
among
the
employee
s.
sustainable
outcome in
the
framework.
Subsequent
ly Week
20.3.2019 Financial gap is
one of the
significant
hurdles, which
presents ethical
problem in the
project.
The
monitor
of the
group
will look
after on
this
statement
of the
problem.
M Framewo
rk will
gain
helping
hand by
monitors
of the
group,
which
will have
the access
to
mitigate
the
hurdles.
This will
help the
framework
to go with
further
developme
nt.
Short terms, which have been utilized-
M (Medium), H(High)
Work Breakdown Structure
Enlist
ment
of
Action
s
Classifying Events
Page | 5
Document Page
For scrutinizing several social, cultural as well as ethical influence of
globalization with respect to business operations of a Tesco.
1.0 Onset of Project
1.1 Groundwork study
1.2 Groundwork study categorization
1.3 Significant inquiries made for the purpose of survey
1.4 Channelizing the study’s expansion
2.0 Examination techniques of the project
2.1 Assembling of Data
Page | 6
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Page | 7
Document Page
Page | 8
Document Page
Page | 9
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
2.2 Secondary study
Page | 10
Document Page
2.3 Qualitative research as well as Qualitative Research
2.4 Data Surveying
2.5 Data implementation
3.0 Project Implementation
3.1 Documentation
3.2 Project’s evaluation
3.3 Project’s depiction
3.4 Assertion of the project
Table 2: Work breakdown structure
(Source: Developed by the learner)
Gantt chart (Table)
Sl. No. Action’s
Enlistment
Initiation date Interval of
actions (days)
Date for
execution the
project
1.0 Onset of Project 10.3.2019 10 20.3.2019
1.1 Groundwork
study
20.3.2019 5 25.3.2019
1.2 Groundwork
study
categorization
25.3.2019 5 30.3.2019
1.3 Significant
questions taken
for survey
purpose
30.3.2019 3 3.4.2019
1.4 Channelizing the
expansion of the
study
3.4.2019 7 10.4.2019
2.0 Project 10.4.2019 15 15.4.2019
Page | 11
chevron_up_icon
1 out of 35
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]