Critical Analysis of Project Failure Factors and CSFs at Tesco Plc
VerifiedAdded on 2020/06/06
|14
|4946
|371
Report
AI Summary
This report provides a critical analysis of project failure factors within Tesco Plc, a major retail company. It explores various causes of project failures, including poor planning, lack of clear goals, communication issues, improper risk management, inadequate project management software, insufficient documentation, poor leadership, inexperienced project managers, improper budget estimations, and failure to identify critical success factors (CSFs). The report also identifies critical success factors essential for project success within Tesco Plc, emphasizing the importance of delivering high-quality products and services to customers. The analysis highlights the need for improved planning, clear communication, effective risk management strategies, and experienced project managers to enhance project outcomes and achieve organizational goals. Recommendations are provided to address identified weaknesses and promote the adoption of CSFs for improved project performance.

PROJECT MANAGEMENT
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

TABLE OF CONTENTS
INTRODUCTION...........................................................................................................................1
Critical analysis of the project failure factors..................................................................................1
Critical success factors related to a project within Tesco Plc..........................................................5
CONCLUSION................................................................................................................................9
REFERENCES..............................................................................................................................10
INTRODUCTION...........................................................................................................................1
Critical analysis of the project failure factors..................................................................................1
Critical success factors related to a project within Tesco Plc..........................................................5
CONCLUSION................................................................................................................................9
REFERENCES..............................................................................................................................10

INTRODUCTION
Management is one of the highly important as well as significant part in each and every
activity which is undertaken by the company or manager. The present study is talking about
managing project which helps to the firm in order to meet with agreed aims and purposes in
proper direction. Further, the procedure of planning, implementing, executing, monitoring,
controlling as well as reviewing of the specific task is considered as the project management. It
includes wide range of tools and techniques which are such as the Gantt chart, critical path, work
breakdown structure, network diagram etc. The present study based on Tesco Plc company
where it describes about those elements and aspects which create negative impact on the project
or success criteria up to the certain or larger extent. Moreover, causes of the project failure are
explained with the current research. Apart from this, critical success factors (CSFs) which are
necessary for effectively completion of every project are described in the present study. At the
end of report, required attributes and skilled are briefly provided in proper ways. Beside this,
recommendations given to the Tesco Plc in the present study for adopting CSF as well as the
considering the project failure causes.
Critical analysis of the project failure factors
According to Kerzner (2013) when specific success criteria or project cannot completed
on time or not delivered within estimated deadline then it can be said that, project gets failure in
the company. There are several kinds of projects are undertaken by the manager in the business
process of Tesco Plc. Further, many types of the projects are like construction, mining, civil,
manufacturing, service, management etc. When the project manager work upon the specific kind
or success criteria then there are wide range of the factors which are necessary to consider
(Reynolds, 2016). The Tesco Plc considers manufacturing project if the retail products as well as
services. If the required elements are not used and followed then overall project can become
failure up to the higher level. Those aspects which affects to the smooth functioning of the
project and enhance chances of its failure are mentioned below:
Poor Planning:
As per the views of Anderson (2016) scheduling is one of the very important factor for
each project while the management going to adopt at the workplace. When planning of the
project is highly effectual and proper then Tesco Plc able to meet with the desired objectives up
1
Management is one of the highly important as well as significant part in each and every
activity which is undertaken by the company or manager. The present study is talking about
managing project which helps to the firm in order to meet with agreed aims and purposes in
proper direction. Further, the procedure of planning, implementing, executing, monitoring,
controlling as well as reviewing of the specific task is considered as the project management. It
includes wide range of tools and techniques which are such as the Gantt chart, critical path, work
breakdown structure, network diagram etc. The present study based on Tesco Plc company
where it describes about those elements and aspects which create negative impact on the project
or success criteria up to the certain or larger extent. Moreover, causes of the project failure are
explained with the current research. Apart from this, critical success factors (CSFs) which are
necessary for effectively completion of every project are described in the present study. At the
end of report, required attributes and skilled are briefly provided in proper ways. Beside this,
recommendations given to the Tesco Plc in the present study for adopting CSF as well as the
considering the project failure causes.
Critical analysis of the project failure factors
According to Kerzner (2013) when specific success criteria or project cannot completed
on time or not delivered within estimated deadline then it can be said that, project gets failure in
the company. There are several kinds of projects are undertaken by the manager in the business
process of Tesco Plc. Further, many types of the projects are like construction, mining, civil,
manufacturing, service, management etc. When the project manager work upon the specific kind
or success criteria then there are wide range of the factors which are necessary to consider
(Reynolds, 2016). The Tesco Plc considers manufacturing project if the retail products as well as
services. If the required elements are not used and followed then overall project can become
failure up to the higher level. Those aspects which affects to the smooth functioning of the
project and enhance chances of its failure are mentioned below:
Poor Planning:
As per the views of Anderson (2016) scheduling is one of the very important factor for
each project while the management going to adopt at the workplace. When planning of the
project is highly effectual and proper then Tesco Plc able to meet with the desired objectives up
1
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

to the higher extent. If the initial stage of the project like planning, is not proper and effectual
then it affects the whole procedure in negative manner. Therefore, the whole smooth functioning
of the project become failure and achievement of objectives as well. In order to resolve this
particular factor, the project manager of Tesco Plc needs to make raw plan and then revise it.
Further, if it is appropriate then should consider and start the activities.
Lack of clarity about goals:
In the opinion of Gwaya, Masu and Wanyona (2014) goals as well as aims must be
highly clear and proper at the time of making any particular plan of the project. The reason is
that, it is very basic thing which required to determine the project activities and follow it. Once
the goals are properly determined that necessary to communicate with team members as well as
subordinates. Due to this, the project manager able to meet with the prepared goals at the time if
initiation in Tesco Plc workplace.
In contrary to this, Lim (2016) when goals and purposes are not framed in proper ways
then team members not able to understand it. Therefore, they will not clear with the objectives in
proper and corrective direction which lead to hamper the success criteria up to the higher extent.
In addition to this, if group not has idea and broad understanding about the goal then chances of
occurring project failure increases. For resolving this specific conditions, the management of
Tesco Plc must give clear idea about the objectives and increase understanding in subordinates.
Communication issues:
Edwards and Bowen (2013) states that, communication plays very important role in every
project because it helps to the management in order to provide instructions and guidelines to
subordinates. In the company like Tesco Plc, when proper and clear communication is not there
then it leads to make failure to the overall project. Due to lack of communication, the team
members cannot get clear idea as well as increase understanding of the objectives and aims. On
the other hand side, within Tesco Plc, when the communication process is highly better and use
adequate resources then it helps to give proper guidance. In addition to this, to communicate
properly from top to bottom level of the managers and employees also all the things must be
clear which is supportive to complete the project on time. Henceforth, it can be criticised that,
2
then it affects the whole procedure in negative manner. Therefore, the whole smooth functioning
of the project become failure and achievement of objectives as well. In order to resolve this
particular factor, the project manager of Tesco Plc needs to make raw plan and then revise it.
Further, if it is appropriate then should consider and start the activities.
Lack of clarity about goals:
In the opinion of Gwaya, Masu and Wanyona (2014) goals as well as aims must be
highly clear and proper at the time of making any particular plan of the project. The reason is
that, it is very basic thing which required to determine the project activities and follow it. Once
the goals are properly determined that necessary to communicate with team members as well as
subordinates. Due to this, the project manager able to meet with the prepared goals at the time if
initiation in Tesco Plc workplace.
In contrary to this, Lim (2016) when goals and purposes are not framed in proper ways
then team members not able to understand it. Therefore, they will not clear with the objectives in
proper and corrective direction which lead to hamper the success criteria up to the higher extent.
In addition to this, if group not has idea and broad understanding about the goal then chances of
occurring project failure increases. For resolving this specific conditions, the management of
Tesco Plc must give clear idea about the objectives and increase understanding in subordinates.
Communication issues:
Edwards and Bowen (2013) states that, communication plays very important role in every
project because it helps to the management in order to provide instructions and guidelines to
subordinates. In the company like Tesco Plc, when proper and clear communication is not there
then it leads to make failure to the overall project. Due to lack of communication, the team
members cannot get clear idea as well as increase understanding of the objectives and aims. On
the other hand side, within Tesco Plc, when the communication process is highly better and use
adequate resources then it helps to give proper guidance. In addition to this, to communicate
properly from top to bottom level of the managers and employees also all the things must be
clear which is supportive to complete the project on time. Henceforth, it can be criticised that,
2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

because of issues and problems related to the communication, the project can failure up to the
greater extent of the Tesco retail firm.
Improper risk management strategies:
According to Sharma (2017) in the project, there are several numbers of the issues and
risks come into consideration and affect the overall goal achievement procedure in adverse
direction. Wide range of risks by which the project can be failed are like as cost increasing,
situational or contingency problems, technical etc. Within working environment such as Tesco
company of the project completion, if any of the problem or issue comes into consideration then
affects in the negative direction. Therefore, chances of project failure will be incurred up to the
higher extent and manager not able to meet with the expected objectives of the Tesco. Along
with this, strategies must be prepared in clear and highly proper manner by the management
which helps to decline this kind of issue in the company.
Sohn (2013) argues that, if overall strategies as well as tactics of managing the risks are
not proper and effectual then the Tesco Plc not able to complete the manufacturing project. At
the current time, the cited firm uses transferring strategy of the risk which is better up to the
certain extent. Further, it can be recommended that, Tesco Plc requires to use mitigation risk
management technique which is highly supportive for it in terms of resolving issues of the
project failure.
Lack of project management software:
As per the views of Symonds (2011) for completing the adopted project in highly
effectual and proper direction software are used by the firms at majority level. If the project
manager not considers this particular software then planning and different schedules affect up to
the higher extent. In the present scenario, for completion of the manufacturing project and meet
with the goals, the Tesco Plc uses software of the project management up to the certain level. At
the very sometimes, it makes plan manually by which project failure chances can come into
consideration. Moreover, it can be suggested to the project manager of Tesco business
organisation that, it should consider the software from start to the end. The reason is that,
through project management software, Tesco Plc able to make network diagram and derive the
3
greater extent of the Tesco retail firm.
Improper risk management strategies:
According to Sharma (2017) in the project, there are several numbers of the issues and
risks come into consideration and affect the overall goal achievement procedure in adverse
direction. Wide range of risks by which the project can be failed are like as cost increasing,
situational or contingency problems, technical etc. Within working environment such as Tesco
company of the project completion, if any of the problem or issue comes into consideration then
affects in the negative direction. Therefore, chances of project failure will be incurred up to the
higher extent and manager not able to meet with the expected objectives of the Tesco. Along
with this, strategies must be prepared in clear and highly proper manner by the management
which helps to decline this kind of issue in the company.
Sohn (2013) argues that, if overall strategies as well as tactics of managing the risks are
not proper and effectual then the Tesco Plc not able to complete the manufacturing project. At
the current time, the cited firm uses transferring strategy of the risk which is better up to the
certain extent. Further, it can be recommended that, Tesco Plc requires to use mitigation risk
management technique which is highly supportive for it in terms of resolving issues of the
project failure.
Lack of project management software:
As per the views of Symonds (2011) for completing the adopted project in highly
effectual and proper direction software are used by the firms at majority level. If the project
manager not considers this particular software then planning and different schedules affect up to
the higher extent. In the present scenario, for completion of the manufacturing project and meet
with the goals, the Tesco Plc uses software of the project management up to the certain level. At
the very sometimes, it makes plan manually by which project failure chances can come into
consideration. Moreover, it can be suggested to the project manager of Tesco business
organisation that, it should consider the software from start to the end. The reason is that,
through project management software, Tesco Plc able to make network diagram and derive the
3

critical path (Thomas, 2013). Therefore, the whole manufacturing project can be complete within
short period of time which lead to reduce project failure causes up to the larger level.
Inadequate project documentation:
Kendrick (2015) says that, documentation of the overall activities as well as project must
be proper as well as adequate within workplace. Due to creating problem of the documentation,
the project can be failed which lead to hamper the overall functioning of the company. While
making and following the project of manufacturing within Tesco Plc, its project manager use the
documentation procedure in adequate direction. This leads to decline the problem of project
failure in the Tesco Plc (Kamran and et.al., 2014). In the present era, project manager of the
selected business organisation uses the project documentation strategy in highly appropriate as
well the adequate direction. Therefore, there is not any requirement to make changes in the
existing documentation procedure which are used by the Tesco retail entity.
Poor leadership:
In the opinion of Hasan, (2016) leader must be highly skilled and has the adequate
attributes for leading as well as providing guidance to the team members. Due to lack of proper
guidance as well as leading to the team members by the leader of Tesco Plc, it can fail up to the
higher level. The leaders who are currently working in the selected business entity have skills
and attributes which are required to provide instructions to the team. Further, the Tesco Plc needs
give training to the leaders in order to improve their leadership skills by which they able to
become more efficient. Due to which, the company can complete its manufacturing project in
appropriate direction within estimated time frame.
Inexperienced project managers:
According to the views of Hwang and Ng (2013) project managers of the company must
be highly skilled as well as experienced which are supportive for it in order to reduce the project
failure issues. If the particular business organisation not hiring experienced managers to carry out
the manufacturing project within working environment, then project failure chances increase up
to the larger level. The Tesco Plc recruited experienced project managers for conducting as well
as completing the manufacturing project which helps to it for reducing causes of project failure
(Young, 2013). It can be recommended to the Tesco retail enterprise that, in needs to recruit and
4
short period of time which lead to reduce project failure causes up to the larger level.
Inadequate project documentation:
Kendrick (2015) says that, documentation of the overall activities as well as project must
be proper as well as adequate within workplace. Due to creating problem of the documentation,
the project can be failed which lead to hamper the overall functioning of the company. While
making and following the project of manufacturing within Tesco Plc, its project manager use the
documentation procedure in adequate direction. This leads to decline the problem of project
failure in the Tesco Plc (Kamran and et.al., 2014). In the present era, project manager of the
selected business organisation uses the project documentation strategy in highly appropriate as
well the adequate direction. Therefore, there is not any requirement to make changes in the
existing documentation procedure which are used by the Tesco retail entity.
Poor leadership:
In the opinion of Hasan, (2016) leader must be highly skilled and has the adequate
attributes for leading as well as providing guidance to the team members. Due to lack of proper
guidance as well as leading to the team members by the leader of Tesco Plc, it can fail up to the
higher level. The leaders who are currently working in the selected business entity have skills
and attributes which are required to provide instructions to the team. Further, the Tesco Plc needs
give training to the leaders in order to improve their leadership skills by which they able to
become more efficient. Due to which, the company can complete its manufacturing project in
appropriate direction within estimated time frame.
Inexperienced project managers:
According to the views of Hwang and Ng (2013) project managers of the company must
be highly skilled as well as experienced which are supportive for it in order to reduce the project
failure issues. If the particular business organisation not hiring experienced managers to carry out
the manufacturing project within working environment, then project failure chances increase up
to the larger level. The Tesco Plc recruited experienced project managers for conducting as well
as completing the manufacturing project which helps to it for reducing causes of project failure
(Young, 2013). It can be recommended to the Tesco retail enterprise that, in needs to recruit and
4
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

select highly experienced project managers for other kinds of the projects which undertaken at
the workplace. Therefore, overall company easily able to meet with the objectives and risks
related to the failure can be resolved up to the greater extent.
Improper budget estimations:
According to Turner (2016) increase in costs as well as expenses is also one of the
biggest offence for the company which lead to create risks of project failure. When budget is not
estimated in adequate as well as proper direction by the project manager then it is not possible to
identify expenditures. Further, it is highly necessary to prepare appropriate budget which is
supportive tool for analysing costs which can be associate with the firm.
Alzahrani and Emsley (2013) argues that, project team of the Tesco prepares budget in
proper ways up to the certain level and due to which its financial performance is not well in the
retail industry. It can be suggested that, Tesco business should prepare the overall budget in
highly proper direction which lead to resolve generate profit from the project. Therefore,
problem of failure and financial both can be resolved up to the greater level.
Failure to identify CSF:
It can be criticised by Verburg, Bosch-Sijtsema and Vartiainen (2013) that, when the
management of Tesco Plc not able to identify and use the critical success factors within
manufacturing or other projects, then also risks of failure can be incurred. As per the present
project management strategies, the selected business entity considers some CSFs and avoid to
others. Due to this, goals and objectives of the project cannot achieved sometimes. Further, the
project manager of Tesco company needs to consider all the CSFs which lead to meet with the
goals within mentioned or estimated time frame.
Critical success factors related to a project within Tesco Plc.
Tesco Plc is one of the most leading retail outlet which have main aim is to deliver the
high quality of product and services to its customers. It wanted to earn the maximum market
share by deliver excellent commodity. In order to attain the business objective, manager of the
firm should understand the success factor of the project (Landy and Conte, 2009). While
company's project will success then it will effectively earn the success and growth in the market.
In order to success the project of company like mines, manufacturing, production, marketing etc
5
the workplace. Therefore, overall company easily able to meet with the objectives and risks
related to the failure can be resolved up to the greater extent.
Improper budget estimations:
According to Turner (2016) increase in costs as well as expenses is also one of the
biggest offence for the company which lead to create risks of project failure. When budget is not
estimated in adequate as well as proper direction by the project manager then it is not possible to
identify expenditures. Further, it is highly necessary to prepare appropriate budget which is
supportive tool for analysing costs which can be associate with the firm.
Alzahrani and Emsley (2013) argues that, project team of the Tesco prepares budget in
proper ways up to the certain level and due to which its financial performance is not well in the
retail industry. It can be suggested that, Tesco business should prepare the overall budget in
highly proper direction which lead to resolve generate profit from the project. Therefore,
problem of failure and financial both can be resolved up to the greater level.
Failure to identify CSF:
It can be criticised by Verburg, Bosch-Sijtsema and Vartiainen (2013) that, when the
management of Tesco Plc not able to identify and use the critical success factors within
manufacturing or other projects, then also risks of failure can be incurred. As per the present
project management strategies, the selected business entity considers some CSFs and avoid to
others. Due to this, goals and objectives of the project cannot achieved sometimes. Further, the
project manager of Tesco company needs to consider all the CSFs which lead to meet with the
goals within mentioned or estimated time frame.
Critical success factors related to a project within Tesco Plc.
Tesco Plc is one of the most leading retail outlet which have main aim is to deliver the
high quality of product and services to its customers. It wanted to earn the maximum market
share by deliver excellent commodity. In order to attain the business objective, manager of the
firm should understand the success factor of the project (Landy and Conte, 2009). While
company's project will success then it will effectively earn the success and growth in the market.
In order to success the project of company like mines, manufacturing, production, marketing etc
5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

company manager seeks to focus on the element by which they can attain the success. Following
are some success factor which should consider by the project manager of Tesco Plc-
Training program- Training is one of the most effective success factor which assist in
attainment of the project success in every organisation. It is a kind of program which is
organised by the company in order to improve the skill, ability, knowledge and working
capability of workforce. In order to achieve the success of the project within the Tesco
Plc, project manager should consider on the training and development program for
employees (Lawler, 2012). While company organise the training program and provide an
opportunity to employees for their growth then they can bale to improve their personality
and professionalism. While employees effective learn the new skill, ability, talent,
capability about the working in the company then they will effectively perform at
workplace for attain determined objective. They can also able to improve the quality of
working and give their best contribution for achieve the success. Thus, it can be said that
in order to attain the success of the project within Tesco Plc, manager should consider on
the training and development program for its workforce so as they can easily improve the
quality of working and achieve the objective of project.
Customers : Tesco's culb card offers provides reward system that keeps its customers
coming back. Through this reward system the customers get points in his every purchase.
When enough points are collected they can be exchanged for a cash voucher which can
be used in stores for purchasing. This reward system s to cultivate the brand loyalty. To
earn lifetime loyalty of the customer's Tesco have provided the future saving system. It
has kept the track to record the purchases of the customers which have increased
customer satisfaction. The company has a team to analyse who in routine is reading their
customer behaviour by examining the data collected by culb cards. The data is used to
make out the latest customer trends which allows the company to make the innovative
products. Some venture brands include their famous ice-cream,etc. The ultimate aim of
these ventures brands is to include and create new products .
Community : The company believes in being responsible,fair and honest towards the
facilities provided to their customers. It has a strong social media presence which creates
warmth and positive emotional connections. To trap the market in more depth Tesco has
opened food venture. They provide their surplus food In the charities to feed the poor
6
are some success factor which should consider by the project manager of Tesco Plc-
Training program- Training is one of the most effective success factor which assist in
attainment of the project success in every organisation. It is a kind of program which is
organised by the company in order to improve the skill, ability, knowledge and working
capability of workforce. In order to achieve the success of the project within the Tesco
Plc, project manager should consider on the training and development program for
employees (Lawler, 2012). While company organise the training program and provide an
opportunity to employees for their growth then they can bale to improve their personality
and professionalism. While employees effective learn the new skill, ability, talent,
capability about the working in the company then they will effectively perform at
workplace for attain determined objective. They can also able to improve the quality of
working and give their best contribution for achieve the success. Thus, it can be said that
in order to attain the success of the project within Tesco Plc, manager should consider on
the training and development program for its workforce so as they can easily improve the
quality of working and achieve the objective of project.
Customers : Tesco's culb card offers provides reward system that keeps its customers
coming back. Through this reward system the customers get points in his every purchase.
When enough points are collected they can be exchanged for a cash voucher which can
be used in stores for purchasing. This reward system s to cultivate the brand loyalty. To
earn lifetime loyalty of the customer's Tesco have provided the future saving system. It
has kept the track to record the purchases of the customers which have increased
customer satisfaction. The company has a team to analyse who in routine is reading their
customer behaviour by examining the data collected by culb cards. The data is used to
make out the latest customer trends which allows the company to make the innovative
products. Some venture brands include their famous ice-cream,etc. The ultimate aim of
these ventures brands is to include and create new products .
Community : The company believes in being responsible,fair and honest towards the
facilities provided to their customers. It has a strong social media presence which creates
warmth and positive emotional connections. To trap the market in more depth Tesco has
opened food venture. They provide their surplus food In the charities to feed the poor
6

people. It has developed the nationwide scheme in partnership with a small social
enterprise. It has created a phone application for the local charities to know their surplus
food available at the end of each day. They work with their store manager and other
shops in the region to shape how tesco can get involved in local community events,
providing support where it is most needed, and help our customers and colleagues up to
date with most recent activities.
Operations : They made their jobs easier , delivers the product consistently which
Saves time and money. The company has expanded its operations internationally with the
expansion strategies. Strategies has responded to need to be sensitive to local expectation
in other countries by entering in joint ventures with the local partners. The operation
management is related to the production of goods and services and includes the tasks to
make sure that the business operations are organised in a well and efficient manner.
Operations also downgrade the manufacturing of goods and services. It deals with the
plan and supervision of the products, dealings, services and the supply chain
management. It also focuses on the capable planning, preparation, uses and
manufacturing. The review of operation management ranges from planned to strategic
and functioning levels. The issues under these are related to the production and
manufacturing of the products.
Technology
For the effective implementation of the project, Tesco have adopted advance technology
so that they can solve work base problems. The technology includes proper payment schedule,
proper online system to evaluate the performance criteria, penalties when there is deadline delays
and performance issue, proper documentation procedure made by software, training and
development criteria for the employees. It may also includes proper conflicts resolution, reduce
turnover rate. If the organisation will adopt advance technology in all the operations then the
efficiency of the employee will be enhances which help them to make success of their project
and solve difficult problems (Longenecker and Fink, 2013). Technology is one of the factor
which can assist in attainment of the success. In every department of the corporation, technology
is required for carry out business activities and function. While company does not adopt effective
technology then it will fail to attain its objective. It order to fasting the speed of business process
7
enterprise. It has created a phone application for the local charities to know their surplus
food available at the end of each day. They work with their store manager and other
shops in the region to shape how tesco can get involved in local community events,
providing support where it is most needed, and help our customers and colleagues up to
date with most recent activities.
Operations : They made their jobs easier , delivers the product consistently which
Saves time and money. The company has expanded its operations internationally with the
expansion strategies. Strategies has responded to need to be sensitive to local expectation
in other countries by entering in joint ventures with the local partners. The operation
management is related to the production of goods and services and includes the tasks to
make sure that the business operations are organised in a well and efficient manner.
Operations also downgrade the manufacturing of goods and services. It deals with the
plan and supervision of the products, dealings, services and the supply chain
management. It also focuses on the capable planning, preparation, uses and
manufacturing. The review of operation management ranges from planned to strategic
and functioning levels. The issues under these are related to the production and
manufacturing of the products.
Technology
For the effective implementation of the project, Tesco have adopted advance technology
so that they can solve work base problems. The technology includes proper payment schedule,
proper online system to evaluate the performance criteria, penalties when there is deadline delays
and performance issue, proper documentation procedure made by software, training and
development criteria for the employees. It may also includes proper conflicts resolution, reduce
turnover rate. If the organisation will adopt advance technology in all the operations then the
efficiency of the employee will be enhances which help them to make success of their project
and solve difficult problems (Longenecker and Fink, 2013). Technology is one of the factor
which can assist in attainment of the success. In every department of the corporation, technology
is required for carry out business activities and function. While company does not adopt effective
technology then it will fail to attain its objective. It order to fasting the speed of business process
7
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

and improve the quality of production and operation of business, high quality and effective
technology is essential aspect within the Tesco Plc.
Involvement of resources There are different resources involved in the project, that
includes human, financial, raw material, machine, spare parts etc. Tesco have use all
these resources in effective and efficient way to that they can able to implement project
solution in the organisation (Macfarlane and et.al., 2011). They have properly
communicated different task and relevant information to the project members so that they
can use that data to complete their task in effective and efficient way. Proper budget is
made related to all the expenses such as training and development expenditure,
advertisements expenses etc which help them to reduce their cost and use fund which is
framed in the budget. This factor assist in attainment of the business objective in large
manner. Thus, it is very important for manager to consider the impressive involvement
resources so as it can attain the success of the project.
Proper staffing
There are complex problems arises in the organisation, to solve them top executive of
Tesco create a team and project is assign to that team. Top level management should select team
members by identifying their capabilities, knowledge, experience and skills, if the right person is
placed in the right job, his/her efficiency increase, so Tesco should select eligible candidate
which can able to analyse the problem and find innovative ideas to solve the problem (Perry,
Hondeghem and Wise, 2010). Effective identification the causes and consequences of the
problem as well as their solution will help to find fruitful result to solve the problem and the
project will be successful.
Proper planning of the project
Tesco have made proper documentation of the project that how the project and problem will be
managed. Documentation includes how the change will be managed, scope, dates, budget and
resources that are required in the project (Van den Brink, Benschop and Jansen, 2010). It
includes different aspects of the project, that are as follows:
How problem will be analysed and managed.
How the schedule will be managed.
8
technology is essential aspect within the Tesco Plc.
Involvement of resources There are different resources involved in the project, that
includes human, financial, raw material, machine, spare parts etc. Tesco have use all
these resources in effective and efficient way to that they can able to implement project
solution in the organisation (Macfarlane and et.al., 2011). They have properly
communicated different task and relevant information to the project members so that they
can use that data to complete their task in effective and efficient way. Proper budget is
made related to all the expenses such as training and development expenditure,
advertisements expenses etc which help them to reduce their cost and use fund which is
framed in the budget. This factor assist in attainment of the business objective in large
manner. Thus, it is very important for manager to consider the impressive involvement
resources so as it can attain the success of the project.
Proper staffing
There are complex problems arises in the organisation, to solve them top executive of
Tesco create a team and project is assign to that team. Top level management should select team
members by identifying their capabilities, knowledge, experience and skills, if the right person is
placed in the right job, his/her efficiency increase, so Tesco should select eligible candidate
which can able to analyse the problem and find innovative ideas to solve the problem (Perry,
Hondeghem and Wise, 2010). Effective identification the causes and consequences of the
problem as well as their solution will help to find fruitful result to solve the problem and the
project will be successful.
Proper planning of the project
Tesco have made proper documentation of the project that how the project and problem will be
managed. Documentation includes how the change will be managed, scope, dates, budget and
resources that are required in the project (Van den Brink, Benschop and Jansen, 2010). It
includes different aspects of the project, that are as follows:
How problem will be analysed and managed.
How the schedule will be managed.
8
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Different methods of the communication used in the project Effective communication- In order to attain the success of the project within the
organisation, communication is one of the factor which affect the project. In every
organisation, communication is very significant aspect by which various functional
department can communicate and connected with each other (Shackleton, 2015). If there
is improper communication then there may arise confusion among the employees. In
order to attain then project success, project manager of Tesco Plc should focus on the
effective medium and source of communication so as every department can easily share
and transfer their information related to business. In addition to this, open communication
is the best way within business by which every employees can openly share their view,
thoughts, opinion, information, knowledge with each other and accomplish the task with
collaborate manner.
Excellent monitoring and controlling- Within the Tesco Plc, project manager should
focus on the excellent monitoring and controlling about the project. With help of this
aspect, project manager can easily attain the determined success of the project (Landy,
and Conte, 2009). It is a strategy under which project manager should regular control
and monitor the performance of project and if there is any error and issue then they
should try to improve. With help of effective monitoring and controlling, project manager
can improve the quality and productivity of the project of Tesco Plc. Thus, it can be said
that in order to attain the project success within the TESCO, project manager should
focus on the effective monitoring and controlling strategies.
CONCLUSION
From this report it has been concluded that in order to improve the quality of project and
attain the success, Tesco Plc manager should focus on the various success factor such as
effective technology, effective communication, monitoring and controlling, Proper staffing,
Proper planning of the project, training and development program etc. With help of these all
factor of success, project manager can easily attain the success. It has been also concluded that
there are various factors by which project can fail within the TESCO plc.
9
organisation, communication is one of the factor which affect the project. In every
organisation, communication is very significant aspect by which various functional
department can communicate and connected with each other (Shackleton, 2015). If there
is improper communication then there may arise confusion among the employees. In
order to attain then project success, project manager of Tesco Plc should focus on the
effective medium and source of communication so as every department can easily share
and transfer their information related to business. In addition to this, open communication
is the best way within business by which every employees can openly share their view,
thoughts, opinion, information, knowledge with each other and accomplish the task with
collaborate manner.
Excellent monitoring and controlling- Within the Tesco Plc, project manager should
focus on the excellent monitoring and controlling about the project. With help of this
aspect, project manager can easily attain the determined success of the project (Landy,
and Conte, 2009). It is a strategy under which project manager should regular control
and monitor the performance of project and if there is any error and issue then they
should try to improve. With help of effective monitoring and controlling, project manager
can improve the quality and productivity of the project of Tesco Plc. Thus, it can be said
that in order to attain the project success within the TESCO, project manager should
focus on the effective monitoring and controlling strategies.
CONCLUSION
From this report it has been concluded that in order to improve the quality of project and
attain the success, Tesco Plc manager should focus on the various success factor such as
effective technology, effective communication, monitoring and controlling, Proper staffing,
Proper planning of the project, training and development program etc. With help of these all
factor of success, project manager can easily attain the success. It has been also concluded that
there are various factors by which project can fail within the TESCO plc.
9

REFERENCES
Books and Journals
Alzahrani, J. I. and Emsley, M. W., 2013. The impact of contractors’ attributes on construction
project success: A post construction evaluation. International Journal of Project
Management. 31(2). pp. 313-322.
Edwards, P. and Bowen, P., 2013. Risk management in project organisations. Routledge.
Gwaya, A. O., Masu, S. M. and Wanyona, G., 2014. A Critical Analysis of the Causes of Project
Management Failures in Kenya. Blue Eyes Intelligence Engineering & Sciences
Publication Pvt Ltd.
Hwang, B. G. and Ng, W. J., 2013. Project management knowledge and skills for green
construction: Overcoming challenges. International Journal of Project Management.
31(2). pp. 272-284.
Kamran, K., and et.al., 2014. "Evaluation of PMI’s risk management framework and major
causes of software development failure in software industry. "International Journal of
Scientific & Technology Research. 3.(11). pp. 120-124.
Kendrick, T., 2015. Identifying and managing project risk: essential tools for failure-proofing
your project. AMACOM Div American Mgmt Assn.
Kenny, M., 2011. Gender and institutions of political recruitment: candidate selection in post-
devolution Scotland. In Gender, Politics and Institutions (pp. 21-41). Palgrave Macmillan
UK.
Kerzner, H., 2013. Project management: a systems approach to planning, scheduling, and
controlling. John Wiley & Sons.
Landy, F. J. and Conte, J. M., 2009. Work in the 21st century: An introduction to industrial and
organizational psychology. John Wiley & Sons.
Lawler, E., 2012. Effective Human Resource Management: A Global Analysis. Stanford
University Press.
Longenecker, O. C. and Fink, S. L., 2013.Creating human-resource management value in the
twenty-first century: Seven steps to strategic HR. Human Resource Management
International Digest. 21(2). pp. 29–32.
10
Books and Journals
Alzahrani, J. I. and Emsley, M. W., 2013. The impact of contractors’ attributes on construction
project success: A post construction evaluation. International Journal of Project
Management. 31(2). pp. 313-322.
Edwards, P. and Bowen, P., 2013. Risk management in project organisations. Routledge.
Gwaya, A. O., Masu, S. M. and Wanyona, G., 2014. A Critical Analysis of the Causes of Project
Management Failures in Kenya. Blue Eyes Intelligence Engineering & Sciences
Publication Pvt Ltd.
Hwang, B. G. and Ng, W. J., 2013. Project management knowledge and skills for green
construction: Overcoming challenges. International Journal of Project Management.
31(2). pp. 272-284.
Kamran, K., and et.al., 2014. "Evaluation of PMI’s risk management framework and major
causes of software development failure in software industry. "International Journal of
Scientific & Technology Research. 3.(11). pp. 120-124.
Kendrick, T., 2015. Identifying and managing project risk: essential tools for failure-proofing
your project. AMACOM Div American Mgmt Assn.
Kenny, M., 2011. Gender and institutions of political recruitment: candidate selection in post-
devolution Scotland. In Gender, Politics and Institutions (pp. 21-41). Palgrave Macmillan
UK.
Kerzner, H., 2013. Project management: a systems approach to planning, scheduling, and
controlling. John Wiley & Sons.
Landy, F. J. and Conte, J. M., 2009. Work in the 21st century: An introduction to industrial and
organizational psychology. John Wiley & Sons.
Lawler, E., 2012. Effective Human Resource Management: A Global Analysis. Stanford
University Press.
Longenecker, O. C. and Fink, S. L., 2013.Creating human-resource management value in the
twenty-first century: Seven steps to strategic HR. Human Resource Management
International Digest. 21(2). pp. 29–32.
10
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 14
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.