Online Ticketing System Project for RALS - Business Development

Verified

Added on  2020/04/07

|17
|2606
|118
Project
AI Summary
This project report details the development of an online ticketing system for RALS, focusing on measurable organizational value (MOV) such as revenue increase and improved customer experience. It outlines the project's scope, including stakeholder identification, requirements gathering, and deliverables like an easy-to-use ticketing system accessible on various devices. The report includes a scope management plan, resource allocation, and a work breakdown structure (WBS) developed using MS Project, detailing milestones, tasks, and resource assignments. Risk analysis identifies potential threats and mitigation strategies. The project emphasizes quality assurance through verification and validation activities and concludes with a closure checklist, project evaluation, and an annotated bibliography, showcasing the project's comprehensive approach to successful implementation and evaluation.
Document Page
Student Name
ID Assignment Title
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
--------- Student is requested to delete all irrelevant fields; I kept it for student’s convenience
in understanding the provided information w.r.t. the template requirements---------------------
1. Part One: (15 Marks)
1.1 MOV - Measurable Organisational Value (5 Marks)
Goals: (Miller, 2008)
Goal Target Timeline
Earn more revenue from the show After November
Make more donation to ICV After November
Reduce the pressure of crowd During the show
Reduce the social pressure of any miss happening
which can happen in uncontrolled crowd
During the show
Provide comfort to the customers by enabling easy
ticket booking from their place of comfort
Early November,
before the start of the
show
Area of Impact Rank (1 to 5)
Customer: Due to the introduction of the new online ticket
booking system, the customers will no longer need to stand
outside the in the ticket counter. This will make them happy
1
Operational: This new online ticket booking system will
reduce the working load on the ticket counter and security
gate as most of the people will book their tickets online
2
Finance: This online ticketing system will help RALS as now
more tickets will be sold than previous and they will earn
more money
3
Strategy: This online ticketing system will help RALS to in
earning more money and help them in donating more money
to ICV
4
Social: For showing their social benefits now after the
introduction of this online ticket booking system they will be
able to donate more revenue to ICV
5
Document Page
o Faster - This online ticketing system will help their customers in booking their
ticket online so the load on the ticket counter on the first day will be less and
the volunteers on the counter will be able to do their work faster
o Do more - This positive result will encourage RALS to develop the show more
and make more donations to ICV
Part Two: (10 Marks)
Scope (minimal 10 items) – 10 Marks
Proper stakeholder identification and analysis
Requirements to be gathered from the identified stakeholders
Requirements finalization and approval
Design and Develop the required system
Develop and get approval on the test plan for the system
Test and Implement the system
Generation of implementation report
Arrange and provide training to the RALS staff & Volunteers
Collect and document lessons learned
Conduct meeting for gathering inputs from stakeholders regarding the output
Do the evaluation of the project
Provide support for the system till its warranty period of three months
Document Page
Scope Management Plan – 10 Marks
Define Scope: The main criteria of this project is to create an online ticketing system which will be
accessible from all electronic gadgets to reduce the overcrowding of people in the ticket counter and
the main security gate and to decrease the overload of work (Monnappa, 2017).
Identify requirements: For logging in for the first time the customers identity proof is needed. A
secret scanner ID should be there to identify each customer and it should be safe from cybercrime.
In-Scope: When the online ticket booking system will be created it should give a system which will be
easy to be accessed from all electronic gadgets, should contain a scanner ID tag to check the
originality of the customers and the tickets, there should be a new code for determining the
customer’s proofs.
Out-of Scope: Every kind of after sales services like maintaining the hardware, providing training for
the improvement and maintaining the system etc. For utilizing such services different orders should
be awarded by the RALS.
Deliverables: The ticketing system should be easy, decent and valid containing all the mentioned
things.
Resource Plan (from MS-Project)
People (and their roles), plus any extra personnel that is required for the project –
Project screenshot.
o Project Sponsor: role is to fund the project
o Project Manager: coordinate the project and be the central focal point & fully
responsible for the project success or failure
o Network Developer: design and develop the network system
o QA Manager: to oversee and check the quality assurance and control at each
exit point
o Technical Lead: to lead the technical team and oversee the quality assurance
o Testers: oversee the testing procedure and conduct test properly
o Trainers: to train the RALS staff & Volunteers
o Web Designers: to design the web page for online booking facility
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
MSP View:
Technology - any hardware, network and software needs to support the team and
your client.
Hardware Latest computers
Software Latest software
Network LAN to connect all hardware
Facilities - where will most of the teamwork be situated?
Internet service
Video conferencing facility
Full office set-up for the team members
Other - for example, travel, training etc.
Travel Requirements o For daily pick-up & drop
o Gathering information for the
project
Training Requirements o To upgrade the skill level
o Able to use the system which is
to be developed by users
Document Page
Part Three: (15 Marks)
Using MS Project, develop a schedule using a high level Work Breakdown Structure
(WBS). It should include:
o WBS (Project Smart, 2017)
Document Page
o Milestones for each phase and deliverable (4 marks)
This will tell everyone associated with the project that the phase or
deliverable was completed satisfactorily.
o Activities / Tasks(4 marks)
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Define a set of activities / tasks that must be completed to produce
each deliverable.
Document Page
o Resource Assignments(4 marks)
Assign people and resources to each individual activities.
o Estimates for Each Activity / Task (3 Marks)
Develop a time estimate for each task or activity to be completed.
Document Page
Part Four: (15 Marks)
Assumptions - Document any assumptions you have made about the project (5
Marks)
In the Project, budget is not an issue
Resources should always be there throughout execution of the project to prevent it
from any issue of time extension
Stakeholders should be recognized well and should not worry about their analysis, as
Virtucon is one of the oldest consultants of Globex
Volunteers should be enough educated to be trained after implementing the online
ticketing system
Procurement material shall be available at the time of requirement
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Risk Analysis (The MITRE Corporation, 2017)
Ris
k
ID
Description Probabilit
y
Impact Rate Assigne
d To
Response
Strategy
Threat or
Opportunit
y
Upto
100%
5 – for
high
3 – for
mediu
m
1-for
low
1-
Probabilit
y *
Impact
Mitigate or
Accept or
Transfer or
Prevent
Describe it as
well
1 During
initiation
stage:
stakeholder
s are
unknown
Project
Manage
r
Mitigate: all
the important
things which
are
recognized
should be
discussed
further with
the team of
co-workers
before
making any
decision
Threat
2 During
planning
Stage: the
time of
work can be
increased
due to
wrong
finalization
of the
requiremen
ts
Project
Manage
r
Mitigate: all
the
associate’s
should be
recognized
and after
doing every
single change
of should be
revised
Threat
3 During
execution
stage: many
problems
can be
caused
during the
Project
Manage
r
Mitigate:
after doing
the
associate’s
conspicuous
evidence
Threat
Document Page
execution of
the project
if it is not
managed
properly
suitably with
standards of
quality they
should be
altered as per
necessities
4 During
monitoring
&
controlling
stage: the
project
scope can
get
increased if
the
stakeholder
s are not
chosen
properly
Project
Manage
r
Mitigate: in
each step the
expert review
should be
done
Threat
5 During
close-out &
evaluation
stage: the
cost can get
increased
and the
project can
get delayed
due to
incomplete
submission.
Project
Manage
r
Mitigate: at
last the
documentatio
n of each
stage should
be submitted
after the
movement to
stop totalling
up in the last
stage
Threat
Part Five: (15 Marks)
A short statement that reflects your team’s philosophy or objective for ensuring that
you deliver a quality system to your client. – 3 Marks
Team’s Philosophy (CMU, 2017): The social occasion must try to keep up the
required quality benchmarks of the things and persistently meet the apparent and
documented assistant's needs. All the threats should be checked genuinely to keep
away it far away from any overwhelm of increase in time. All the documented wants
should be taken with satisfactory quality benchmarks. All workers need to focus on
work quality to avoid any required changes
Develop and describe the following that your project team could implement to
ensure quality;