This project management report examines the challenges faced by Toboggan Brewing Company, a craft brewery experiencing rapid growth. The report begins with a project plan outlining objectives, responsibilities, and a timeline. It then presents a case study analysis, identifying key problems related to production capacity, market competition, and financial constraints. The core of the report involves a comprehensive analysis using SWOT, CREST, Porter's Five Forces, and stakeholder analysis to understand the internal and external factors affecting the company. Based on this analysis, the report proposes three alternative solutions and recommends the best course of action, including an action plan for implementation. Finally, the report concludes with a reflection on the project and its findings, providing a strategic roadmap for Toboggan Brewing Company to achieve sustainable success in a competitive market. The report aims to provide the company with a detailed understanding of its issues and to provide the company with viable business solutions.

Running head: PROJECT MANAGEMENT
Toboggan Brewing Company- PROJECT
MANAGEMENT
Name of the Student
Name of the University
Author Note
Toboggan Brewing Company- PROJECT
MANAGEMENT
Name of the Student
Name of the University
Author Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

1
PROJECT MANAGEMENT
Executive summary
The aim of the report is to provide a consultancy report for the organization that he has been
selected. The case study that has been selected for the assessment is Toboggan brewing
company. The report will focus on identifying the major problem that is faced by the
organization. Secondly, the report will focus on completing an internal and external analysis that
will help me in understanding the important information that is needed for resolving the issues
within the organization. The third part of the report will create a feasible alternative solution for
providing better support towards the organization. Lastly the report will recommend one solution
to words the organization for enhancing the overall performance.
PROJECT MANAGEMENT
Executive summary
The aim of the report is to provide a consultancy report for the organization that he has been
selected. The case study that has been selected for the assessment is Toboggan brewing
company. The report will focus on identifying the major problem that is faced by the
organization. Secondly, the report will focus on completing an internal and external analysis that
will help me in understanding the important information that is needed for resolving the issues
within the organization. The third part of the report will create a feasible alternative solution for
providing better support towards the organization. Lastly the report will recommend one solution
to words the organization for enhancing the overall performance.

2
PROJECT MANAGEMENT
Table of Contents
Introduction..................................................................................................................................5
Part 1: Project plan...........................................................................................................................5
Objective for the project (client)..................................................................................................5
Objective of the project (consulting group).................................................................................6
Project plan..................................................................................................................................6
Responsibility of each task..........................................................................................................7
Timetable for the project.............................................................................................................8
Contingency plan.............................................................................................................................9
Part 2: case study report...................................................................................................................9
About the case study....................................................................................................................9
Problems needs to be solved......................................................................................................10
Part 3: Analysis..............................................................................................................................11
SWOT analysis..........................................................................................................................11
CREST analysis.........................................................................................................................13
Porter’s 5 force analysis.............................................................................................................14
Stakeholder analysis..................................................................................................................16
Part 4: 3 possible alternatives........................................................................................................16
Part 5: Selecting the best solution..................................................................................................17
Action plan.................................................................................................................................18
PROJECT MANAGEMENT
Table of Contents
Introduction..................................................................................................................................5
Part 1: Project plan...........................................................................................................................5
Objective for the project (client)..................................................................................................5
Objective of the project (consulting group).................................................................................6
Project plan..................................................................................................................................6
Responsibility of each task..........................................................................................................7
Timetable for the project.............................................................................................................8
Contingency plan.............................................................................................................................9
Part 2: case study report...................................................................................................................9
About the case study....................................................................................................................9
Problems needs to be solved......................................................................................................10
Part 3: Analysis..............................................................................................................................11
SWOT analysis..........................................................................................................................11
CREST analysis.........................................................................................................................13
Porter’s 5 force analysis.............................................................................................................14
Stakeholder analysis..................................................................................................................16
Part 4: 3 possible alternatives........................................................................................................16
Part 5: Selecting the best solution..................................................................................................17
Action plan.................................................................................................................................18

3
PROJECT MANAGEMENT
Part 6: Reflection...........................................................................................................................19
Conclusion.....................................................................................................................................21
References......................................................................................................................................23
PROJECT MANAGEMENT
Part 6: Reflection...........................................................................................................................19
Conclusion.....................................................................................................................................21
References......................................................................................................................................23
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

4
PROJECT MANAGEMENT
Introduction
Toboggan brewing company was started their business in 2015 to rave reviews. Smith
was the owner of the business and he hired the award winning brew master Tom Smith. Within
less time period Toboggan became one of the popular beer brands. The organization started
expanding their business for gaining better market value. However the organization faced several
challenges while expanding their organization on worldwide basis. The main issue was with the
quality of beer. The consumer preferences for beer changes quickly and if the lunatic fridge fails
to meet the demands of the customers then it will become difficult to manage the market value.
Hence in order to have good control over the market, smith decided to choose an alternative way.
The main focus is on preparing a proper consultant report that will be capable of providing better
support towards the Toboggan believing company.
Part 1: Project plan
Objective for the project (client)
The main objective of the project is to analyze the issues that are faced by Toboggan
brewing company at present. It has been observed that due to increase in need for globalization
the production rate of Toboggan has also increased. This will further lead to increase in the
overall expenses. In addition to this it has been observed that gaining a better control over a new
market is very difficult. Thus there is a need to understand the impacts that will be created if the
globalization does not support the business. This has the potential to lower the annual production
rate. The main focus is to ensure that the issues are resolved so that the business can gain better
market value.
PROJECT MANAGEMENT
Introduction
Toboggan brewing company was started their business in 2015 to rave reviews. Smith
was the owner of the business and he hired the award winning brew master Tom Smith. Within
less time period Toboggan became one of the popular beer brands. The organization started
expanding their business for gaining better market value. However the organization faced several
challenges while expanding their organization on worldwide basis. The main issue was with the
quality of beer. The consumer preferences for beer changes quickly and if the lunatic fridge fails
to meet the demands of the customers then it will become difficult to manage the market value.
Hence in order to have good control over the market, smith decided to choose an alternative way.
The main focus is on preparing a proper consultant report that will be capable of providing better
support towards the Toboggan believing company.
Part 1: Project plan
Objective for the project (client)
The main objective of the project is to analyze the issues that are faced by Toboggan
brewing company at present. It has been observed that due to increase in need for globalization
the production rate of Toboggan has also increased. This will further lead to increase in the
overall expenses. In addition to this it has been observed that gaining a better control over a new
market is very difficult. Thus there is a need to understand the impacts that will be created if the
globalization does not support the business. This has the potential to lower the annual production
rate. The main focus is to ensure that the issues are resolved so that the business can gain better
market value.

5
PROJECT MANAGEMENT
Objective of the project (consulting group)
The consulting group has been hired for the purpose of providing proper support towards
the business activities that are carried by Toboggan brewing company. It becomes very much
important to ensure that the client needs are fulfilled successfully. The main components that are
needed to be considered while developing the project is that ensuring that proper services are
offered towards the customers, the overall expense rate is lower than the overall profit margin
and the lunatic fridge is capable of meeting the customer demands.
Project plan
The report aims at creating a proper proposal that will highlight the essential tasks that
are needed for resolving the issues faced by the brewing company. The report is intended
towards the owner of the brewing company and the key executives that are associated with the
organization. In order to complete the report successfully it is important to analyze each
component if actively. The report will focus on analyzing the issues are that are faced by the
organization. Once the issues are identified properly it becomes easy to evaluate proper solution
towards organization. The report will be developed by the consulting group (Zulch, 2016). This
will include the time that is needed for resolving the issues, the essential resources needed, the
crucial team members and statistical data. In order to evaluate the data associated with the
company, quantitative research will be carried out that will be capable of providing better data
sets. The data sets and all the components related to the project report will be developed by the
consulting group. The part of the report will be designed and evaluated by the consulting group
so that the chances of errors within the report can be minimized.
PROJECT MANAGEMENT
Objective of the project (consulting group)
The consulting group has been hired for the purpose of providing proper support towards
the business activities that are carried by Toboggan brewing company. It becomes very much
important to ensure that the client needs are fulfilled successfully. The main components that are
needed to be considered while developing the project is that ensuring that proper services are
offered towards the customers, the overall expense rate is lower than the overall profit margin
and the lunatic fridge is capable of meeting the customer demands.
Project plan
The report aims at creating a proper proposal that will highlight the essential tasks that
are needed for resolving the issues faced by the brewing company. The report is intended
towards the owner of the brewing company and the key executives that are associated with the
organization. In order to complete the report successfully it is important to analyze each
component if actively. The report will focus on analyzing the issues are that are faced by the
organization. Once the issues are identified properly it becomes easy to evaluate proper solution
towards organization. The report will be developed by the consulting group (Zulch, 2016). This
will include the time that is needed for resolving the issues, the essential resources needed, the
crucial team members and statistical data. In order to evaluate the data associated with the
company, quantitative research will be carried out that will be capable of providing better data
sets. The data sets and all the components related to the project report will be developed by the
consulting group. The part of the report will be designed and evaluated by the consulting group
so that the chances of errors within the report can be minimized.

6
PROJECT MANAGEMENT
Responsibility of each task
Task name Members responsible Back up for each
task
Supervisor
Preparing the project
plan
Project manager Project manager Consulting executive
Developing the
business case
Project manager Project team Consulting executive
Performing feasibility
study
Project team ,
feasibility member
Project team Consulting executive
Appointing project
team members
Project manager and
consulting group
Project team Consulting executive
Developing the
project budget
Budget analyst,
project manager
Project team Consulting executive
Handling the risks Risks analyst Project manager Consulting executive
Managing the outputs Project manager Project team Consulting executive
Developing
communication plan
Communication plan Project team Consulting executive
Executing the phases Project team
members
Project manager Consulting executive
Monitoring the
project phases
Project managers Supervisor Consulting executive
Preventing scope
creep
Project managers Project team Consulting executive
PROJECT MANAGEMENT
Responsibility of each task
Task name Members responsible Back up for each
task
Supervisor
Preparing the project
plan
Project manager Project manager Consulting executive
Developing the
business case
Project manager Project team Consulting executive
Performing feasibility
study
Project team ,
feasibility member
Project team Consulting executive
Appointing project
team members
Project manager and
consulting group
Project team Consulting executive
Developing the
project budget
Budget analyst,
project manager
Project team Consulting executive
Handling the risks Risks analyst Project manager Consulting executive
Managing the outputs Project manager Project team Consulting executive
Developing
communication plan
Communication plan Project team Consulting executive
Executing the phases Project team
members
Project manager Consulting executive
Monitoring the
project phases
Project managers Supervisor Consulting executive
Preventing scope
creep
Project managers Project team Consulting executive
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7
PROJECT MANAGEMENT
Project closure Project managers supervisors Consulting executive
Timetable for the project
Task name 1st week 2nd week 3rd
wee
k
4th week 5th
week
6th
week
7th week 8th week
Preparing the
project plan
Developing
the business
case
Performing
feasibility
study
Appointing
project team
members
Developing
the project
budget
Handling the
risks
PROJECT MANAGEMENT
Project closure Project managers supervisors Consulting executive
Timetable for the project
Task name 1st week 2nd week 3rd
wee
k
4th week 5th
week
6th
week
7th week 8th week
Preparing the
project plan
Developing
the business
case
Performing
feasibility
study
Appointing
project team
members
Developing
the project
budget
Handling the
risks

8
PROJECT MANAGEMENT
Managing
the outputs
Developing
communicati
on plan
Executing
the phases
Monitoring
the project
phases
Preventing
scope creep
Project
closure
Contingency plan
Event Likelihood of
event occurring
Impact on
business
Priority Solution to deal
with event
Project time
exceeding
PROJECT MANAGEMENT
Managing
the outputs
Developing
communicati
on plan
Executing
the phases
Monitoring
the project
phases
Preventing
scope creep
Project
closure
Contingency plan
Event Likelihood of
event occurring
Impact on
business
Priority Solution to deal
with event
Project time
exceeding

9
PROJECT MANAGEMENT
Part 2: case study report
About the case study
Smith is the owner of the toboggan brewing company. Since the last one year Smith has
introduced several components into the market of liquor control board of Ontario that typically
includes craft beer, and lunatic fridge. With the release of lunatic fridge it has been observed that
the organization has obtained an outstanding success with the Products stocking out week to
week. However it was observed that Toboggan had reached the maximum brewing capacity.
Thus in order to continue the business Smith decided to build a new brewing facility that will be
offered towards their customers. Building a new brewing solution is considered to be most
efficient solution but the organization does not have sufficient funds to start producing a new
product. Thus for the purpose of designing a new beer, Smith decided to contract the business of
producing the beer to another breweries. However the overall cost and production rate has
already increased widely does in order to gain profit it is important to have a higher investments.
In the way of developing new craft beer it was observed that there are certain barriers that can
lead to complete failure of the new brands (Walczak & Kuchta, 2013). This includes a huge need
of capital investment for brewing equipment and facilities, the regulatory standards for alcohol
are very difficult and restrictive and there is a need to take permission from higher authorities.
Thus in order to develop a new business set up Smith and the business has faced several
challenges.
Problems needs to be solved
The problems that are faced by the management are with the high cost of launching a new
product in the market. Craft brewers often complained that low sales in the beer store made it
PROJECT MANAGEMENT
Part 2: case study report
About the case study
Smith is the owner of the toboggan brewing company. Since the last one year Smith has
introduced several components into the market of liquor control board of Ontario that typically
includes craft beer, and lunatic fridge. With the release of lunatic fridge it has been observed that
the organization has obtained an outstanding success with the Products stocking out week to
week. However it was observed that Toboggan had reached the maximum brewing capacity.
Thus in order to continue the business Smith decided to build a new brewing facility that will be
offered towards their customers. Building a new brewing solution is considered to be most
efficient solution but the organization does not have sufficient funds to start producing a new
product. Thus for the purpose of designing a new beer, Smith decided to contract the business of
producing the beer to another breweries. However the overall cost and production rate has
already increased widely does in order to gain profit it is important to have a higher investments.
In the way of developing new craft beer it was observed that there are certain barriers that can
lead to complete failure of the new brands (Walczak & Kuchta, 2013). This includes a huge need
of capital investment for brewing equipment and facilities, the regulatory standards for alcohol
are very difficult and restrictive and there is a need to take permission from higher authorities.
Thus in order to develop a new business set up Smith and the business has faced several
challenges.
Problems needs to be solved
The problems that are faced by the management are with the high cost of launching a new
product in the market. Craft brewers often complained that low sales in the beer store made it
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

10
PROJECT MANAGEMENT
difficult to justify the cost of delivery. It has been observed that lunatic fridge were not capable
of providing proper quality of product towards their customers. There was a need to sell high
amount of product for gaining profit in the market. Moreover the organization failed to create
proper brand recognition in certain places; this led to low profit margins.
In order to reduce the problem faced by the management of the brewing company it is
important to ensure that products are launched on the basis of their market value. Before
launching a product into a market it is important for the organization to gain proper knowledge
about the market and the competitors (Špundak, 2014). There is a need to ensure that the new
product is capable of resolving the issues that were raised by the earlier products. The main issue
that was faced by the organization was to meet the expectations of the customers. It was
observed that the lunatic fridge was not able to meet the demands of the customers. This led to
hampering the overall profit margin.
It is expected that with the help of proper decision it will become easy to improve the
overall performance of the organization. This will ensure that the organization has gained a
better profit margin in the market and the brand value has also increased. The main focus is to
offer a better service towards the customers. With the help of proper efficient solution it will
become easy to resolve the issues that are faced by the brewing company.
Part 3: Analysis
The company faced a huge lag with the increase in domestic and global competitors due
to change in consumer choices. It has been observed that consumer choices, fluctuation within
the business partners and increase in customer’s interest have hampered the business widely.
Apart from this business has suffered widely due to substantial decline in the earnings (Safari,
PROJECT MANAGEMENT
difficult to justify the cost of delivery. It has been observed that lunatic fridge were not capable
of providing proper quality of product towards their customers. There was a need to sell high
amount of product for gaining profit in the market. Moreover the organization failed to create
proper brand recognition in certain places; this led to low profit margins.
In order to reduce the problem faced by the management of the brewing company it is
important to ensure that products are launched on the basis of their market value. Before
launching a product into a market it is important for the organization to gain proper knowledge
about the market and the competitors (Špundak, 2014). There is a need to ensure that the new
product is capable of resolving the issues that were raised by the earlier products. The main issue
that was faced by the organization was to meet the expectations of the customers. It was
observed that the lunatic fridge was not able to meet the demands of the customers. This led to
hampering the overall profit margin.
It is expected that with the help of proper decision it will become easy to improve the
overall performance of the organization. This will ensure that the organization has gained a
better profit margin in the market and the brand value has also increased. The main focus is to
offer a better service towards the customers. With the help of proper efficient solution it will
become easy to resolve the issues that are faced by the brewing company.
Part 3: Analysis
The company faced a huge lag with the increase in domestic and global competitors due
to change in consumer choices. It has been observed that consumer choices, fluctuation within
the business partners and increase in customer’s interest have hampered the business widely.
Apart from this business has suffered widely due to substantial decline in the earnings (Safari,

11
PROJECT MANAGEMENT
Farhang & Rajabzadehyazdi, 2016). Thus in order to protect the organization the organization
decided to propose four strategies that will be capable of enhancing the business performance.
SWOT analysis
Swot analysis is used for the purpose of assessing the organization current position. Swot
analyses stands for strength, weaknesses, opportunity is and threats. Strength and weaknesses are
referred to the internal factor that impacts an organization. On the other hand opportunities and
threats are related to the external factors that influences the Company. With the help of a swot
analyses it becomes easy to organize the top trends, weaknesses, opportunities and threats that
are associated with the organization. The main aim of performing swot analyses in this
assessment is to identify the issues and the way issues can be resolved within the brewing
company. Swot analysis helps in providing better support towards the factors that are associated
with the organization. For the purpose of determining the internal and external factors impacting
the Swot analysis is carried out (Røsegg & Falk, 2018). The major benefits that are offered with
the use of swot analyses are that it offers source information to organize the strategic planning.
This helps in building a better strength for the organization. In addition to these the responses
towards the organization also maximizes. With the help of what analysis it becomes easy to
overcome the organization threats.
Strength
It has been observed that business has a huge geographical reach. This increases the
client base and also ensures that a strong brand value has been obtained. The organization aims
at focusing on continuous product development so that it becomes easy to gain a better market
position. This also ensures that top services are provided towards the client.
PROJECT MANAGEMENT
Farhang & Rajabzadehyazdi, 2016). Thus in order to protect the organization the organization
decided to propose four strategies that will be capable of enhancing the business performance.
SWOT analysis
Swot analysis is used for the purpose of assessing the organization current position. Swot
analyses stands for strength, weaknesses, opportunity is and threats. Strength and weaknesses are
referred to the internal factor that impacts an organization. On the other hand opportunities and
threats are related to the external factors that influences the Company. With the help of a swot
analyses it becomes easy to organize the top trends, weaknesses, opportunities and threats that
are associated with the organization. The main aim of performing swot analyses in this
assessment is to identify the issues and the way issues can be resolved within the brewing
company. Swot analysis helps in providing better support towards the factors that are associated
with the organization. For the purpose of determining the internal and external factors impacting
the Swot analysis is carried out (Røsegg & Falk, 2018). The major benefits that are offered with
the use of swot analyses are that it offers source information to organize the strategic planning.
This helps in building a better strength for the organization. In addition to these the responses
towards the organization also maximizes. With the help of what analysis it becomes easy to
overcome the organization threats.
Strength
It has been observed that business has a huge geographical reach. This increases the
client base and also ensures that a strong brand value has been obtained. The organization aims
at focusing on continuous product development so that it becomes easy to gain a better market
position. This also ensures that top services are provided towards the client.

12
PROJECT MANAGEMENT
Weakness
The company has experienced absence of monetary and technical resources. These have
actually limited the capability of the organization on worldwide basis (Morrison et al., 2017).
There is a lack of experience and understanding of operating within certain areas.
Opportunity
There are several number of competitors on domestic and worldwide basis that hoers the
business performance. The business also struggles with the increase it rate of duplication of
products. The monetary stability has also hampered due to increase in decline of a Mexican peso.
Threats
The business can expand their gurus with the increasing the theme parks. High internet
penetration can enhance the business performance
CREST analysis
Crest analyses is referred to the mechanism that is used for the purpose of determining
the environmental factors that has the potential to affect the organizational activities. Crest stands
for competitive, regulatory, economic, social cultural and technological environmental factors.
These are the factors that have the potential to impact the performance of the organization and
the products that are associated with it.
Competitive environment
The business of toboggan brewing industry underwent several laws. This hampered the
overall performance of the organization (Larsen et al., 2015). In addition to this it has been
PROJECT MANAGEMENT
Weakness
The company has experienced absence of monetary and technical resources. These have
actually limited the capability of the organization on worldwide basis (Morrison et al., 2017).
There is a lack of experience and understanding of operating within certain areas.
Opportunity
There are several number of competitors on domestic and worldwide basis that hoers the
business performance. The business also struggles with the increase it rate of duplication of
products. The monetary stability has also hampered due to increase in decline of a Mexican peso.
Threats
The business can expand their gurus with the increasing the theme parks. High internet
penetration can enhance the business performance
CREST analysis
Crest analyses is referred to the mechanism that is used for the purpose of determining
the environmental factors that has the potential to affect the organizational activities. Crest stands
for competitive, regulatory, economic, social cultural and technological environmental factors.
These are the factors that have the potential to impact the performance of the organization and
the products that are associated with it.
Competitive environment
The business of toboggan brewing industry underwent several laws. This hampered the
overall performance of the organization (Larsen et al., 2015). In addition to this it has been
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

13
PROJECT MANAGEMENT
observed that the brewing company also seized challenges due to unfavorable location,
community issues and other factors.
Regulatory environment
Toboggan brewing company case analysis is extremely essential as this is subject to
discrimination laws. The business has been exposed to high compliance with healthy and safety
laws in relation to supplying safe and secure environment to words the consumers and the labor
of the workforce (Lai, 2019). Apart from this it has been observed that the organization has an
Obligation that was hampering the overall business performance.
Economic factor
The decision of enhancing the business functionality was considered to be very
advantageous. In addition to this it has been observed that the financial stability becomes a very
difficult factor for the organization due to increase in currency value.
Social environmental factors
The social environmental factors related to the social factors that have the potential to
hamper the market value. With the use of highly web penetration, social media and mobile
games it has been observed that the chances of enhancement in business can be increased
(Lagstedt & Dahlberg, 2018).
Technological factors
Incorporating new innovation and promoting new business design will lead to success of
the organization. The organization believes extremely in introducing new brands that will be
capable of engaging the customers properly (Kaucka et al., 2016).
PROJECT MANAGEMENT
observed that the brewing company also seized challenges due to unfavorable location,
community issues and other factors.
Regulatory environment
Toboggan brewing company case analysis is extremely essential as this is subject to
discrimination laws. The business has been exposed to high compliance with healthy and safety
laws in relation to supplying safe and secure environment to words the consumers and the labor
of the workforce (Lai, 2019). Apart from this it has been observed that the organization has an
Obligation that was hampering the overall business performance.
Economic factor
The decision of enhancing the business functionality was considered to be very
advantageous. In addition to this it has been observed that the financial stability becomes a very
difficult factor for the organization due to increase in currency value.
Social environmental factors
The social environmental factors related to the social factors that have the potential to
hamper the market value. With the use of highly web penetration, social media and mobile
games it has been observed that the chances of enhancement in business can be increased
(Lagstedt & Dahlberg, 2018).
Technological factors
Incorporating new innovation and promoting new business design will lead to success of
the organization. The organization believes extremely in introducing new brands that will be
capable of engaging the customers properly (Kaucka et al., 2016).

14
PROJECT MANAGEMENT
Porter’s 5 force analysis
Porter’s analysis is done for the purpose of determining the external environmental factor
that has the potential to hamper an organization. With the help of porter five forces it becomes
easy to determine the impact that can be created on a business due to its environmental factors.
This helps in guiding the business strategy for increasing competitive advantages. The five forces
of porters are Threat of substitute products, Rivalries among the competitors, Threat of new
entrants, bargaining power of customer and bargaining power of suppliers (Ironside, 2019). With
the help of porter’s five forces it becomes easy to analyze the business overall objective.
Analyzing the barriers that may hamper the business performance also becomes easy with the
use of a porters five forces.
Bargaining power of suppliers
It has been observed that the supplier tends to have high bargaining power. This impacts
the overall business. The bargaining power of the provider is considered to be low, when
considering the toboggan brewing company that is the dominant global brand with a large
consumer base. The main stakeholders that are associated with the business are the sponsors,
commercial partners and shopping centers (Gebre, 2018). The main reason behind continuing
with the organization is the favorable brand value and the ensured profit margin.
Bargaining power of customer
The bargaining power of the toboggan brewing company customers in the Mexico area
seems to be low as there are a couple of local parks found in the Mexico area. However, it has
been observed that the bargaining power of the consumers of total indoor entertainment industry
PROJECT MANAGEMENT
Porter’s 5 force analysis
Porter’s analysis is done for the purpose of determining the external environmental factor
that has the potential to hamper an organization. With the help of porter five forces it becomes
easy to determine the impact that can be created on a business due to its environmental factors.
This helps in guiding the business strategy for increasing competitive advantages. The five forces
of porters are Threat of substitute products, Rivalries among the competitors, Threat of new
entrants, bargaining power of customer and bargaining power of suppliers (Ironside, 2019). With
the help of porter’s five forces it becomes easy to analyze the business overall objective.
Analyzing the barriers that may hamper the business performance also becomes easy with the
use of a porters five forces.
Bargaining power of suppliers
It has been observed that the supplier tends to have high bargaining power. This impacts
the overall business. The bargaining power of the provider is considered to be low, when
considering the toboggan brewing company that is the dominant global brand with a large
consumer base. The main stakeholders that are associated with the business are the sponsors,
commercial partners and shopping centers (Gebre, 2018). The main reason behind continuing
with the organization is the favorable brand value and the ensured profit margin.
Bargaining power of customer
The bargaining power of the toboggan brewing company customers in the Mexico area
seems to be low as there are a couple of local parks found in the Mexico area. However, it has
been observed that the bargaining power of the consumers of total indoor entertainment industry

15
PROJECT MANAGEMENT
is a high (Chen et al., 2017). Thus it can be stated that the organization have a huge customer
base in all over the world and the bargaining power of customer varies from place to place.
Threat of new entrants
The risks of new entrants are hampering the business of the toboggan brewing company.
There always lies a threat from new entrants. There are several brewing company that can invest
a lot of money for giving a tough competition. In addition to these it has been observed that with
the introduction of new technologies and resources the products qualities have also been
modified.
Rivalries among the competitors
It has been observed that due to the market value and product similarities in the products,
organization is facing a huge rivalry in the domestic as well as international market. These leads
to impacting the overall business profit ratio (Butt et al., 2016).
Threat of substitute products
There always lies a situation that can hamper the business profit margin. Threat of
substitute products can impact the overall business. It has been observed that every now and then
new products are being launched with new solutions. Thus it becomes essential to ensure that the
developed product is capable of meeting the needs of the current market (Andersen, 2016).
Stakeholder analysis
The main stakeholders that are associated with the project include external stakeholders
and the internal stakeholders. The major stakeholders that are associated with the project are
sponsors, company associates, consulting group and the producers (Alla et al., 2017).
PROJECT MANAGEMENT
is a high (Chen et al., 2017). Thus it can be stated that the organization have a huge customer
base in all over the world and the bargaining power of customer varies from place to place.
Threat of new entrants
The risks of new entrants are hampering the business of the toboggan brewing company.
There always lies a threat from new entrants. There are several brewing company that can invest
a lot of money for giving a tough competition. In addition to these it has been observed that with
the introduction of new technologies and resources the products qualities have also been
modified.
Rivalries among the competitors
It has been observed that due to the market value and product similarities in the products,
organization is facing a huge rivalry in the domestic as well as international market. These leads
to impacting the overall business profit ratio (Butt et al., 2016).
Threat of substitute products
There always lies a situation that can hamper the business profit margin. Threat of
substitute products can impact the overall business. It has been observed that every now and then
new products are being launched with new solutions. Thus it becomes essential to ensure that the
developed product is capable of meeting the needs of the current market (Andersen, 2016).
Stakeholder analysis
The main stakeholders that are associated with the project include external stakeholders
and the internal stakeholders. The major stakeholders that are associated with the project are
sponsors, company associates, consulting group and the producers (Alla et al., 2017).
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

16
PROJECT MANAGEMENT
Part 4: 3 possible alternatives
Alternative 1
The first alternative that is offered towards the organization is entering into small
markets. This strategy mainly involves the construction of small Cities so that it becomes easy to
increase the GDP growth in population. This would require a smaller size profit as compare to
the other operations. This will also require a minimum amount of investments (Alghail, Yao &
Kie, 2017). Hence it can be stated that for obtaining a better customer it is important for the
business to have some feasible ideas.
Alternative 2
In order to enhance the business performance it has been decided to develop a movie
market. The strategy appears to be more practical as these needs less investment.
Alternative 3
Designing interactive digital platform will allow the users to have a strong connection
with the organization. Considering the fact that high penetration of internet users will eventually
lead to maximize the benefits range (Alexander, 2017).
Part 5: Selecting the best solution
The main reason behind selecting the content development structure as the best way of
enhancing the business performance is that it offers a wide range of benefits towards
organization. For the purpose of implementing the technique of structured content development
the organization should have proper partnership with prominent service provider that will help in
PROJECT MANAGEMENT
Part 4: 3 possible alternatives
Alternative 1
The first alternative that is offered towards the organization is entering into small
markets. This strategy mainly involves the construction of small Cities so that it becomes easy to
increase the GDP growth in population. This would require a smaller size profit as compare to
the other operations. This will also require a minimum amount of investments (Alghail, Yao &
Kie, 2017). Hence it can be stated that for obtaining a better customer it is important for the
business to have some feasible ideas.
Alternative 2
In order to enhance the business performance it has been decided to develop a movie
market. The strategy appears to be more practical as these needs less investment.
Alternative 3
Designing interactive digital platform will allow the users to have a strong connection
with the organization. Considering the fact that high penetration of internet users will eventually
lead to maximize the benefits range (Alexander, 2017).
Part 5: Selecting the best solution
The main reason behind selecting the content development structure as the best way of
enhancing the business performance is that it offers a wide range of benefits towards
organization. For the purpose of implementing the technique of structured content development
the organization should have proper partnership with prominent service provider that will help in

17
PROJECT MANAGEMENT
developing the content is efficiently (Ahmed, 2018). The content developers will be responsible
for building the content within the website. This will help the customers to know more about the
organization and services that are offered towards organization. In Order to enhance the
performance the suppliers needs to be selected wisely by the organization. Effectiveness can be
obtained with proper management of functional costs. Once the functional cost is reduced it
becomes easy to increase the overall productivity of the organization.
Action plan
Objectives Tasks Success criteria Time frame Resources
Content
development
For the purpose
of implementing
the technique of
structured
content
development the
organization
should have
proper
partnership with
prominent
service provider
that will help in
developing the
content is
Easy access and
better profit
margins
4-5 months Web developer,
content
developer and
the
organization’s
executive
PROJECT MANAGEMENT
developing the content is efficiently (Ahmed, 2018). The content developers will be responsible
for building the content within the website. This will help the customers to know more about the
organization and services that are offered towards organization. In Order to enhance the
performance the suppliers needs to be selected wisely by the organization. Effectiveness can be
obtained with proper management of functional costs. Once the functional cost is reduced it
becomes easy to increase the overall productivity of the organization.
Action plan
Objectives Tasks Success criteria Time frame Resources
Content
development
For the purpose
of implementing
the technique of
structured
content
development the
organization
should have
proper
partnership with
prominent
service provider
that will help in
developing the
content is
Easy access and
better profit
margins
4-5 months Web developer,
content
developer and
the
organization’s
executive

18
PROJECT MANAGEMENT
efficiently. The
content
developers will
be responsible
for building the
content within
the website.
Part 6: Reflection
Question 1: The project aims at resolving the issues that are faced by the Toboggan brewing
company. There is a need to use proper analysis so that it becomes easy to develop an effective
project plan. With the help of effective project plan it becomes easy to reduce the chances of
errors within the organization. The main reason behind effectively planning the project is to
enhance the overall profit margin of the organization. In order to evaluate all the essential factors
we focused on identifying the issues that are faced by the organization at present. After that we
focused on identifying the areas that needed to be prioritized effectively. Once the issues are
identified properly it becomes easy to plan effective measures for protecting the resources.
Throughout the planning process we have ensured that all the essential components are
successfully discussed in the paper. However there are certain features that may have missed out
while developing the plan. While developing the project plan we did not prepare any budget or
resource chart that will be needed for understanding the requirements for successfully
implementing the new solution. The project phase is needs to be planned properly so that it can
PROJECT MANAGEMENT
efficiently. The
content
developers will
be responsible
for building the
content within
the website.
Part 6: Reflection
Question 1: The project aims at resolving the issues that are faced by the Toboggan brewing
company. There is a need to use proper analysis so that it becomes easy to develop an effective
project plan. With the help of effective project plan it becomes easy to reduce the chances of
errors within the organization. The main reason behind effectively planning the project is to
enhance the overall profit margin of the organization. In order to evaluate all the essential factors
we focused on identifying the issues that are faced by the organization at present. After that we
focused on identifying the areas that needed to be prioritized effectively. Once the issues are
identified properly it becomes easy to plan effective measures for protecting the resources.
Throughout the planning process we have ensured that all the essential components are
successfully discussed in the paper. However there are certain features that may have missed out
while developing the plan. While developing the project plan we did not prepare any budget or
resource chart that will be needed for understanding the requirements for successfully
implementing the new solution. The project phase is needs to be planned properly so that it can
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

19
PROJECT MANAGEMENT
initiate a better working and its resolution towards the company. If I get the chance of starting
the project all over again, I would focus on allocating the tasks to suitable persons. This will
increase the overall performance. With efficient management and performance it will become
easy to organize the different components of the project successfully. The main component of a
project plan is to include a proper project budget and Resource analysis. Hence I would like to
include these components if I get a chance to redevelop the project plan.
Question 2: As an individual team member I was always focused on analyzing the true facts that
were associated with the Toboggan brewing company. I focused on preparing the project plan
efficiently so that it becomes easy to analyze the factors that are behind the issues. My strength
as a team member was it that I have very good communication skills that helped in
communicating the essential factors with my team members. As an efficient team member I
ensure that every fact very conveyed to other team members so that the project can be developed
properly. Besides this one of my weakness was that I missed out certain faces that I needed it for
successful development of a project plan.
Question 3: My group handled the situation very well. Every component associated with the
project word pre-described and discussed with him the report. In the case of unplanned situation
we managed to organize the working components efficiently. The teamwork was very effective
and the main reason behind this was the coordination between the team members. In addition to
these every team member had a great communication skills that help in successful execution of
the project. The main reason behind stating the team members to be efficient is the great
communication skills, problem-solving capabilities, decision making, organizing and planning
the skills efficiently so that the target can be received and lastly did the liability feature. Every
team member worked hard for meeting the projects objective. As an individual team member I
PROJECT MANAGEMENT
initiate a better working and its resolution towards the company. If I get the chance of starting
the project all over again, I would focus on allocating the tasks to suitable persons. This will
increase the overall performance. With efficient management and performance it will become
easy to organize the different components of the project successfully. The main component of a
project plan is to include a proper project budget and Resource analysis. Hence I would like to
include these components if I get a chance to redevelop the project plan.
Question 2: As an individual team member I was always focused on analyzing the true facts that
were associated with the Toboggan brewing company. I focused on preparing the project plan
efficiently so that it becomes easy to analyze the factors that are behind the issues. My strength
as a team member was it that I have very good communication skills that helped in
communicating the essential factors with my team members. As an efficient team member I
ensure that every fact very conveyed to other team members so that the project can be developed
properly. Besides this one of my weakness was that I missed out certain faces that I needed it for
successful development of a project plan.
Question 3: My group handled the situation very well. Every component associated with the
project word pre-described and discussed with him the report. In the case of unplanned situation
we managed to organize the working components efficiently. The teamwork was very effective
and the main reason behind this was the coordination between the team members. In addition to
these every team member had a great communication skills that help in successful execution of
the project. The main reason behind stating the team members to be efficient is the great
communication skills, problem-solving capabilities, decision making, organizing and planning
the skills efficiently so that the target can be received and lastly did the liability feature. Every
team member worked hard for meeting the projects objective. As an individual team member I

20
PROJECT MANAGEMENT
have contributed fully towards the developing the project. I had the potential to make efficient
decision in the critical time. In addition to this I had the influencing skills that have initiated the
successful completion of the project.
Question 4: Yes as a group we make the objectives for the project. We have ensured that all the
components related to the project are fulfilled properly. In addition to these the personal
objective that was said before executing the project has also achieved (Ageret al., 2018). The
main aim of the project was to successfully offer a better solution for overcoming the issues that
were faced by the organization. The main aim of the project was to successfully offer a better
solution for overcoming the issues that were faced by the organization. In the paper we have
successfully analyze the several theories of for identifying the most suitable solution for the
organization. The different analyses that I have performed in the papers include swot analysis,
crest analysis, porters five forces analysis and stakeholder analysis. With the help of these
analyses it became easy to identify the key resources and components needed for managing the
performance. Thus as a team we have evaluated all the essential factors successfully. Effective
project management knowledge has helped in developing the project component successfully.
Hence it can be stated that we have evaluated all the essential factors that are needed for
developing the project successfully.
Conclusion
The aim of the assessment was to develop a project consultancy report effectively so that
it becomes easy to resolve the challenges that are faced by Toboggan believing company. While
analyzing the resources to project has he polluted all the key factors effectively. The faces that
are included within the report are to identify the major problems that were faced by the
PROJECT MANAGEMENT
have contributed fully towards the developing the project. I had the potential to make efficient
decision in the critical time. In addition to this I had the influencing skills that have initiated the
successful completion of the project.
Question 4: Yes as a group we make the objectives for the project. We have ensured that all the
components related to the project are fulfilled properly. In addition to these the personal
objective that was said before executing the project has also achieved (Ageret al., 2018). The
main aim of the project was to successfully offer a better solution for overcoming the issues that
were faced by the organization. The main aim of the project was to successfully offer a better
solution for overcoming the issues that were faced by the organization. In the paper we have
successfully analyze the several theories of for identifying the most suitable solution for the
organization. The different analyses that I have performed in the papers include swot analysis,
crest analysis, porters five forces analysis and stakeholder analysis. With the help of these
analyses it became easy to identify the key resources and components needed for managing the
performance. Thus as a team we have evaluated all the essential factors successfully. Effective
project management knowledge has helped in developing the project component successfully.
Hence it can be stated that we have evaluated all the essential factors that are needed for
developing the project successfully.
Conclusion
The aim of the assessment was to develop a project consultancy report effectively so that
it becomes easy to resolve the challenges that are faced by Toboggan believing company. While
analyzing the resources to project has he polluted all the key factors effectively. The faces that
are included within the report are to identify the major problems that were faced by the

21
PROJECT MANAGEMENT
organization. Next the focus was to complete the internal and external analyses are that are
associated with the project. There is a need her to analyze all the information properly so that it
can help in resolving the issues faced by the organization. Thus it can be stated that with the help
of the report it becomes easy to understand the factors that impacted the overall business
performance. In this report the project has been divided into different parts so that all the
members associated with the project can be identified successfully. Timetables with dates were
developed so that it becomes easy to understand the project execution phase. Hence it can be
concluded that with the help of different analyses it became easy to manage the different
components related to the project. All the analyses results are discussed within the report so that
it becomes easy to evaluate the best solution for the organization. The alternative solutions were
offered towards the organization which is the best solution was selected.
PROJECT MANAGEMENT
organization. Next the focus was to complete the internal and external analyses are that are
associated with the project. There is a need her to analyze all the information properly so that it
can help in resolving the issues faced by the organization. Thus it can be stated that with the help
of the report it becomes easy to understand the factors that impacted the overall business
performance. In this report the project has been divided into different parts so that all the
members associated with the project can be identified successfully. Timetables with dates were
developed so that it becomes easy to understand the project execution phase. Hence it can be
concluded that with the help of different analyses it became easy to manage the different
components related to the project. All the analyses results are discussed within the report so that
it becomes easy to evaluate the best solution for the organization. The alternative solutions were
offered towards the organization which is the best solution was selected.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

22
PROJECT MANAGEMENT
References
Ager, D., Blume, L., Hites, R. A., Venier, M., Salamova, A., & Lehman, D. (2018). Quality
Assurance Project Plan.
Ahmed, S., (2018). A review on using opportunities of augmented reality & virtual reality in
construction project management. Organization, technology & management in
construction: an international journal, 10(1), pp.1839-1852.
Alexander, E. (2017). After rationality: Towards a contingency theory for planning.
In Explorations in planning theory (pp. 45-64). Routledge.
Alghail, A., Yao, L., & Kie, C. J. (2017). Importance of Project-oriented Organizational Culture
in Knowledge Management Processes. GLOBAL JOURNAL FOR RESEARCH
ANALYSIS, 6(06).
Alla, S., Pazos, P. and DelAguila, R., 2017. The Impact of Requirements Management
Documentation on Software Project Outcomes in Health Care. In IIE Annual Conference.
Proceedings (pp. 1419-1423). Institute of Industrial and Systems Engineers (IISE).
Andersen, E. S. (2016). Do project managers have different perspectives on project
management?. International Journal of Project Management, 34(1), 58-65.
Butt, A., Naaranoja, M. & Savolainen, J., 2016. Project change stakeholder
communication. International Journal of Project Management, 34(8), pp.1579-1595.
Chen, H. H., Kang, H. Y., & Lee, A. H. (2017). A project management plan to reach sustainable
competitive advantage for a photovoltaic (PV) manufacturer. Sustainability, 9(9), 1496.
PROJECT MANAGEMENT
References
Ager, D., Blume, L., Hites, R. A., Venier, M., Salamova, A., & Lehman, D. (2018). Quality
Assurance Project Plan.
Ahmed, S., (2018). A review on using opportunities of augmented reality & virtual reality in
construction project management. Organization, technology & management in
construction: an international journal, 10(1), pp.1839-1852.
Alexander, E. (2017). After rationality: Towards a contingency theory for planning.
In Explorations in planning theory (pp. 45-64). Routledge.
Alghail, A., Yao, L., & Kie, C. J. (2017). Importance of Project-oriented Organizational Culture
in Knowledge Management Processes. GLOBAL JOURNAL FOR RESEARCH
ANALYSIS, 6(06).
Alla, S., Pazos, P. and DelAguila, R., 2017. The Impact of Requirements Management
Documentation on Software Project Outcomes in Health Care. In IIE Annual Conference.
Proceedings (pp. 1419-1423). Institute of Industrial and Systems Engineers (IISE).
Andersen, E. S. (2016). Do project managers have different perspectives on project
management?. International Journal of Project Management, 34(1), 58-65.
Butt, A., Naaranoja, M. & Savolainen, J., 2016. Project change stakeholder
communication. International Journal of Project Management, 34(8), pp.1579-1595.
Chen, H. H., Kang, H. Y., & Lee, A. H. (2017). A project management plan to reach sustainable
competitive advantage for a photovoltaic (PV) manufacturer. Sustainability, 9(9), 1496.

23
PROJECT MANAGEMENT
Gebre, T. (2018). Assessment Of The Importance Of Project Management Soft Skills In The
Project Success: A Case Study On The Joint Programme Rural Women´ S Economic
Empowerment (Doctoral dissertation, Addis Ababa University).
Ironside, M. P. (2019). The cultural and physical evolution of the American amusement park:
From Thompson & Dundy’s A Trip to the Moon to Walt Disney’s Space
Mountain (Doctoral dissertation, University of Kent,).
Kaucka, M., Ivashkin, E., Gyllborg, D., Zikmund, T., Tesarova, M., Kaiser, J., ... & Yu, T.
(2016). Analysis of neural crest–derived clones reveals novel aspects of facial
development. Science advances, 2(8), e1600060.
Lagstedt, A., & Dahlberg, T. (2018). A Contingency Theory Motivated Framework to Select
Information System Development Methods. In PACIS (p. 46).
Lagstedt, A., & Dahlberg, T. (2018). A Contingency Theory Motivated Framework to Select
Information System Development Methods. In PACIS (p. 46).
Lai, T. (2019). The Rise of Legal Project Management: Importance of project management to
law firms.
Larsen, J.K., Shen, G.Q., Lindhard, S.M. & Brunoe, T.D., (2015). Factors affecting schedule
delay, cost overrun, & quality level in public construction projects. Journal of
Management in Engineering, 32(1), p.04015032.
Morrison, J. A., McLennan, R., Wolfe, L. A., Gogol, M. M., Meier, S., McKinney, M. C., ... &
Li, H. (2017). Single-cell transcriptome analysis of avian neural crest migration reveals
signatures of invasion and molecular transitions. Elife, 6, e28415.
PROJECT MANAGEMENT
Gebre, T. (2018). Assessment Of The Importance Of Project Management Soft Skills In The
Project Success: A Case Study On The Joint Programme Rural Women´ S Economic
Empowerment (Doctoral dissertation, Addis Ababa University).
Ironside, M. P. (2019). The cultural and physical evolution of the American amusement park:
From Thompson & Dundy’s A Trip to the Moon to Walt Disney’s Space
Mountain (Doctoral dissertation, University of Kent,).
Kaucka, M., Ivashkin, E., Gyllborg, D., Zikmund, T., Tesarova, M., Kaiser, J., ... & Yu, T.
(2016). Analysis of neural crest–derived clones reveals novel aspects of facial
development. Science advances, 2(8), e1600060.
Lagstedt, A., & Dahlberg, T. (2018). A Contingency Theory Motivated Framework to Select
Information System Development Methods. In PACIS (p. 46).
Lagstedt, A., & Dahlberg, T. (2018). A Contingency Theory Motivated Framework to Select
Information System Development Methods. In PACIS (p. 46).
Lai, T. (2019). The Rise of Legal Project Management: Importance of project management to
law firms.
Larsen, J.K., Shen, G.Q., Lindhard, S.M. & Brunoe, T.D., (2015). Factors affecting schedule
delay, cost overrun, & quality level in public construction projects. Journal of
Management in Engineering, 32(1), p.04015032.
Morrison, J. A., McLennan, R., Wolfe, L. A., Gogol, M. M., Meier, S., McKinney, M. C., ... &
Li, H. (2017). Single-cell transcriptome analysis of avian neural crest migration reveals
signatures of invasion and molecular transitions. Elife, 6, e28415.

24
PROJECT MANAGEMENT
Røsegg, C. J., & Falk, K. (2018, July). The Importance of Project Management in the System
Integration, Verification and Validation Process. In INCOSE International
Symposium (Vol. 28, No. 1, pp. 226-244).
Safari, N., Farhang, M., & Rajabzadehyazdi, E. (2016). The study on the competitive status of
construction companies based on Michael Porter's five competitive forces (Case study:
Armeno Project Development and Management Company). European Online Journal of
Natural and Social Sciences: Proceedings, 5(3 (s)), pp-72.
Špundak, M. (2014). Mixed agile/traditional project management methodology–reality or
illusion?. Procedia-Social and Behavioral Sciences, 119(1), 939-948.
Walczak, W., & Kuchta, D. (2013). Risks characteristic to Agile project management
methodologies and responses to them. Operations Research and Decisions, 23.
Zulch, B., (2016). A proposed model for construction project management communication in the
South African construction industry. Acta Structilia, 23(1), pp.1-35.
PROJECT MANAGEMENT
Røsegg, C. J., & Falk, K. (2018, July). The Importance of Project Management in the System
Integration, Verification and Validation Process. In INCOSE International
Symposium (Vol. 28, No. 1, pp. 226-244).
Safari, N., Farhang, M., & Rajabzadehyazdi, E. (2016). The study on the competitive status of
construction companies based on Michael Porter's five competitive forces (Case study:
Armeno Project Development and Management Company). European Online Journal of
Natural and Social Sciences: Proceedings, 5(3 (s)), pp-72.
Špundak, M. (2014). Mixed agile/traditional project management methodology–reality or
illusion?. Procedia-Social and Behavioral Sciences, 119(1), 939-948.
Walczak, W., & Kuchta, D. (2013). Risks characteristic to Agile project management
methodologies and responses to them. Operations Research and Decisions, 23.
Zulch, B., (2016). A proposed model for construction project management communication in the
South African construction industry. Acta Structilia, 23(1), pp.1-35.
1 out of 25
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.