TopEd Campus Refurbishment Project

Verified

Added on  2022/12/27

|20
|1489
|1
Case Study
AI Summary
The TopEd Campus Refurbishment Project is a comprehensive case study focusing on the strategic management of procurement and contracts for a significant renovation of an educational institution's facilities. Established 25 years ago, TopEd aims to modernize its campus to enhance the student experience and accommodate increasing enrollment. The project involves a complete overhaul of a sixteen-story building, requiring careful planning and execution to meet budgetary and scheduling constraints. This case study will analyze the most suitable procurement routes and contract types, emphasizing the importance of strategic planning in construction projects.
Document Page
TopEd Campus
Refurbishment
Procurement and Contract
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Background of the plan
TopEd is an educational institution which was established 25 years ago in Sydney.
TopEd has been running Bachelor and Master Courses in IT, Business, Law, Accounting,
Management and Medical Sciences for domestic and international students.
TopEd has been running the courses in a sixteen-storied building which has not been
refurbished for the last 20 years.
As the international student numbers have been increasing for the last five years and
teaching technologies are also changing day by day, TopEd is in the process of
transforming its campus into a smart campus, providing a high-quality student
experience through industry-leading courses.
Document Page
Project Brief
Right at this point of time institution is identified to be one of the most popular
educational institute but it was established near about 25 years ago
Complete refurbishment required, with renovation and overhaul of all 16 floors of the
TopEd campus
Lecturer rooms, computer and special purpose labs, admin and academic offices require
complete demolition
Schools and all other offices will be aligned as per the vertical floor stacking from level 0
to level 15
Teaching spaces and break out area for students needs to be created
CEO, Reception, Library, Student experience would be specially refurbished with new high
technology devices
Document Page
Project Given
Construction to commence by July 2020 for all the 16 floors
Throughout the project period, TopEd would continue to function and deliver courses to
student
There would be one floor needs to be considered for the refurbishment works and it
needs to be undertaken as a ‘construction zone’
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Project Constraints
Refurbishment must be completed by 30th June 2023
Total cost must not exceed the overall allocated budget
Schedule is the top priority for staged floor-by-floor refurbishments to minimize the
disruptions in the teaching activities
Quality is the top priority as the presentation places for students and external guests
Document Page
Why deliver a Project Strategy?
Strategy for the management of the project is important for the reasons as below:
Contributes to the success of the project
Helps in representing the opportunities of development for the organization
Helps in troubleshooting the problems that might occur while theoretically representing the
practical implementation of the projects
Reduces the total operational cost, any risks occurring or ant waste created during the
project. Reduction of waste is absolutely necessary since in the construction projects, waste
remains the maximum
Document Page
Procurement Strategy
Examination of the current situation
Understanding the information in input from the people involved for the
project
Imagine the future perspectives
Determine the priorities
Creating attainable objectives
Integrating the plan and monitoring the results
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
What is a Procurement Strategy?
It is a planned approach such that the design contractors for TopEd can think about
having a cost-effective purchasing for the required supplies of the project
This approach considers several required supplies and elements like timeline and
factors consideration for the project
Funding of the budget is also analysed through procurement strategy with the
assessment of risk and opportunities amongst others.
Document Page
Procurement Route – design-bid-
built
This is a project that needs to be fully design and needs to be developed in detail with
the advertisement that the team working for the client consultant has to be making
and also by implementing a construction contract that also includes the requirement
and imposition of several penalties applied when the project is late then its usual
established due date.
Document Page
What is Design-Bid-Build?
TopEd Project
Owners
Design
Contractors
Processing of
the Design
documentation
Sequential
Design Process
Contacting the
Construction
Contractors
Quoting the
design cost
Selection
process for
Construction
Contractors
Processing of
the
construction
process
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Things to consider for Design-bid-
built
Time
Cost
Quality of level of service
The change of orders
Claims, disputes and negotiations
Management capacities and responsibilities
Document Page
Why chose Design-Bid-Build?
It creates an open market for the
construction project
It makes sure that the competitive bid
options are available
It ensures a proper delivery procedure
for the construction process