This report investigates the impact of Total Quality Management (TQM) on the performance of project-based firms in Kuwait, focusing on project cost and schedule. The study uses quantitative data analysis to determine the relationship between TQM and project outcomes, also exploring the moderating role of continuous improvement. The research found that TQM has a significant positive impact on project cost reduction but does not significantly affect the project schedule. Continuous improvement was identified as a key moderator for enhancing project cost. The report concludes with recommendations for Kuwaiti firms to effectively implement TQM, emphasizing the importance of identifying relevant factors, investing in continuous improvement infrastructure, and conducting thorough cost-benefit analyses. The study contributes both academic insights and practical business implications, offering suggestions for future research and highlighting the role of TQM in gaining a competitive edge in Kuwait's banking, construction, and healthcare sectors. Desklib provides access to this report and many other solved assignments.

Running head: CONCLUSIONS AND RECOMMENDATIONS
Total Quality Management Impact on the Performance of Project Based Firms in Kuwait
Name of the Student:
Name of the University:
Author note:
Total Quality Management Impact on the Performance of Project Based Firms in Kuwait
Name of the Student:
Name of the University:
Author note:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1CONCLUSIONS AND RECOMMENDATIONS
Topic: Total Quality Management Impact on the Performance of Project Based Firms in
Kuwait
CHAPTER 5: CONCLUSION AND RECOMMENDATONS
5.1 Introduction
Total Quality Management (TQM) is an organizational framework, which entails the
organizations to build an infrastructure where they would be able to continuously improve their
abilities in delivering high-quality goods and services to the consumers (Dale 2015). This
concept was very important during the period between late 1980s and early 1990s and after that,
it was overshadowed by other techniques such as Lean manufacturing, Six Sigma and ISO 9000
(Ross 2017). As seen earlier, the businesses in Kuwait follow the TQM though the consultancy
firms. The TQM process is integrated in the business projects to generate the desired revenue as
well as to meet the timeline of the scheduled delivery, which helps in gaining competitive edge
in the market. While some organizations are focusing on achieving efficient financial
performance (project cost), some other are focusing on improving their non-financial
performance (project schedule) and both type of organizations are implementing the TQM
process.
From the literature review, the overview of the macro environment in Kuwait was obtained.
Along with that, the researcher also highlighted crucial elements in Kuwait’s economy and
culture, which would have significant impact on the working practices. For example, the
tendency to avoid uncertainty would push the people in Kuwait to focus more on cost benefit
analysis before implementing TQM (Gimenez-Espin, Jiménez-Jiménez and Martínez-Costa
2013). The factors of TQM focus on continuous improvement of the quality of the products and
Topic: Total Quality Management Impact on the Performance of Project Based Firms in
Kuwait
CHAPTER 5: CONCLUSION AND RECOMMENDATONS
5.1 Introduction
Total Quality Management (TQM) is an organizational framework, which entails the
organizations to build an infrastructure where they would be able to continuously improve their
abilities in delivering high-quality goods and services to the consumers (Dale 2015). This
concept was very important during the period between late 1980s and early 1990s and after that,
it was overshadowed by other techniques such as Lean manufacturing, Six Sigma and ISO 9000
(Ross 2017). As seen earlier, the businesses in Kuwait follow the TQM though the consultancy
firms. The TQM process is integrated in the business projects to generate the desired revenue as
well as to meet the timeline of the scheduled delivery, which helps in gaining competitive edge
in the market. While some organizations are focusing on achieving efficient financial
performance (project cost), some other are focusing on improving their non-financial
performance (project schedule) and both type of organizations are implementing the TQM
process.
From the literature review, the overview of the macro environment in Kuwait was obtained.
Along with that, the researcher also highlighted crucial elements in Kuwait’s economy and
culture, which would have significant impact on the working practices. For example, the
tendency to avoid uncertainty would push the people in Kuwait to focus more on cost benefit
analysis before implementing TQM (Gimenez-Espin, Jiménez-Jiménez and Martínez-Costa
2013). The factors of TQM focus on continuous improvement of the quality of the products and

2CONCLUSIONS AND RECOMMENDATIONS
services to increase the value proposition to the customer. This requires high level of investment.
Hence, the economic condition and culture of the nation are important as that would determine
the application of TQM in the industries. Through the literature review, the researcher presented
an in depth discussion regarding different aspects of TQM, project management and continuous
improvement. It is seen that there are 9 critical success factors which influence the organizational
performance in various ways. All these factors were discussed individually to evaluate the
relationship between TQM and continuous improvement process and the business performance.
It was found from multiple literature study that TQM has a significant influence on the
production and delivery process, and continuous improvement is an essential factor, which must
be implemented with the TQM. Thus, the researcher created a theoretical background for the
study, which made the reader acquainted with the research topic.
In this research study, the researcher focused on to explore the impact of Total Quality
Management on the performance of the Kuwait based project firms. For the study, the researcher
formulated three research hypotheses, which segregated the relationship between TQM and
project schedule, project cost and whether continuous improvement significantly moderates
project management in construction, banking and healthcare sectors. The researcher conducted a
survey through SurveyMonkey for primary data collection and quantitative data analysis method
was applied to get the findings. The response data was converted into numerical value and
statistical tools, namely, descriptive statistics, reliability test, correlation and regression, were
applied on the data. From the data analysis, it is found that, there is no significant relationship
between TQM and project schedule, while TQM is found to be have a strong positive impact on
the project cost. It is also found that continuous improvement acts as a moderator for project cost
enhancement. This is a significant finding for the Kuwait based project firms.
services to increase the value proposition to the customer. This requires high level of investment.
Hence, the economic condition and culture of the nation are important as that would determine
the application of TQM in the industries. Through the literature review, the researcher presented
an in depth discussion regarding different aspects of TQM, project management and continuous
improvement. It is seen that there are 9 critical success factors which influence the organizational
performance in various ways. All these factors were discussed individually to evaluate the
relationship between TQM and continuous improvement process and the business performance.
It was found from multiple literature study that TQM has a significant influence on the
production and delivery process, and continuous improvement is an essential factor, which must
be implemented with the TQM. Thus, the researcher created a theoretical background for the
study, which made the reader acquainted with the research topic.
In this research study, the researcher focused on to explore the impact of Total Quality
Management on the performance of the Kuwait based project firms. For the study, the researcher
formulated three research hypotheses, which segregated the relationship between TQM and
project schedule, project cost and whether continuous improvement significantly moderates
project management in construction, banking and healthcare sectors. The researcher conducted a
survey through SurveyMonkey for primary data collection and quantitative data analysis method
was applied to get the findings. The response data was converted into numerical value and
statistical tools, namely, descriptive statistics, reliability test, correlation and regression, were
applied on the data. From the data analysis, it is found that, there is no significant relationship
between TQM and project schedule, while TQM is found to be have a strong positive impact on
the project cost. It is also found that continuous improvement acts as a moderator for project cost
enhancement. This is a significant finding for the Kuwait based project firms.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3CONCLUSIONS AND RECOMMENDATIONS
5.2 Conclusion
From the research study, it can be concluded that TQM is important for reducing the project cost,
that is, for the financial performance of the firms; however, it does not have much influence on
the project schedule, that is, non-financial performance. In a project based firm, both the
financial and non-financial performances are equally important to achieve efficiency and
competitive advantage in the industry. Hence, integration of TQM is becoming a common
practice in Kuwait. Based on this, the researcher formulated the research objectives. In this
chapter, the researcher will discuss whether the research objectives have been fulfilled. Along
with that, the researcher also provided some recommendations, implications of the findings and
future scope of the study at the end of this chapter.
5.2.1 Linking to the first objective
The first objective of the study is to explore the impact of the TQM factors on the project
management of the project based firms in Kuwait. Two integral components of project
management are project cost and project schedule. To address this issue, the researcher designed
two hypotheses to address the two components separately. Quantitative data analysis revealed
that, TQM process had a significant impact on the project cost and not on the project schedule.
Some of the major elements of TQM are ethics, integrity, trust, teamwork, training, leadership,
recognition and communication and supply management (Oakland 2014). All these components
together have a positive relationship with project cost. If TQM gets enhanced, the project cost
would be enhanced too. This process ensures improvement in the quality of products and
services delivered, which in turn increases customer satisfaction and market share. This helps the
businesses to expand and enjoy economies of scale. On the other hand, from the insignificant
relationship between the TQM and project schedule infers that improvement in the products and
5.2 Conclusion
From the research study, it can be concluded that TQM is important for reducing the project cost,
that is, for the financial performance of the firms; however, it does not have much influence on
the project schedule, that is, non-financial performance. In a project based firm, both the
financial and non-financial performances are equally important to achieve efficiency and
competitive advantage in the industry. Hence, integration of TQM is becoming a common
practice in Kuwait. Based on this, the researcher formulated the research objectives. In this
chapter, the researcher will discuss whether the research objectives have been fulfilled. Along
with that, the researcher also provided some recommendations, implications of the findings and
future scope of the study at the end of this chapter.
5.2.1 Linking to the first objective
The first objective of the study is to explore the impact of the TQM factors on the project
management of the project based firms in Kuwait. Two integral components of project
management are project cost and project schedule. To address this issue, the researcher designed
two hypotheses to address the two components separately. Quantitative data analysis revealed
that, TQM process had a significant impact on the project cost and not on the project schedule.
Some of the major elements of TQM are ethics, integrity, trust, teamwork, training, leadership,
recognition and communication and supply management (Oakland 2014). All these components
together have a positive relationship with project cost. If TQM gets enhanced, the project cost
would be enhanced too. This process ensures improvement in the quality of products and
services delivered, which in turn increases customer satisfaction and market share. This helps the
businesses to expand and enjoy economies of scale. On the other hand, from the insignificant
relationship between the TQM and project schedule infers that improvement in the products and
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4CONCLUSIONS AND RECOMMENDATIONS
services does not imply that project schedule would be efficient. This is not an independent
element in the project management and hence, TQM cannot separately influence the non-
financial performance, that is, project schedule in a firm. Thus, it can be said that, the first
objective of the study was fulfilled from the analysis.
5.2.2 Linking to the second objective
The second objective of the study was to evaluate the impact of continuous improvement as a
mediator on the efficiency of project management in Kuwait. From the descriptive data analysis,
it is seen that majority of the respondents agreed on the question of whether efficiency of the
project management in the project based firms of Kuwait. This is also reflected from the
reliability score of 0.719. All other statistical tests reveal that continuous improvement of the
functions and process of the TQM has a positive impact on the project management. The
moderation test was run in SPSS version 23, and outcome showed that the interval of LLCI and
ULCI does not have any zero, which indicates that continuous improvement plays a major role as
a moderator for enhancement of project cost and project schedule. Thus, the second objective of
the study was also fulfilled.
5.3 Recommendations
There are some scopes in the operations of the project based firms, where TQM can improve the
performance if implemented efficiently. TQM has many benefits, but the firms must implement
the process thoughtfully after careful planning to reap the benefits profitably.
The firms must identify the factors of TQM which is relevant for their operations. The
project management activities include many factors and those vary from one firm to
services does not imply that project schedule would be efficient. This is not an independent
element in the project management and hence, TQM cannot separately influence the non-
financial performance, that is, project schedule in a firm. Thus, it can be said that, the first
objective of the study was fulfilled from the analysis.
5.2.2 Linking to the second objective
The second objective of the study was to evaluate the impact of continuous improvement as a
mediator on the efficiency of project management in Kuwait. From the descriptive data analysis,
it is seen that majority of the respondents agreed on the question of whether efficiency of the
project management in the project based firms of Kuwait. This is also reflected from the
reliability score of 0.719. All other statistical tests reveal that continuous improvement of the
functions and process of the TQM has a positive impact on the project management. The
moderation test was run in SPSS version 23, and outcome showed that the interval of LLCI and
ULCI does not have any zero, which indicates that continuous improvement plays a major role as
a moderator for enhancement of project cost and project schedule. Thus, the second objective of
the study was also fulfilled.
5.3 Recommendations
There are some scopes in the operations of the project based firms, where TQM can improve the
performance if implemented efficiently. TQM has many benefits, but the firms must implement
the process thoughtfully after careful planning to reap the benefits profitably.
The firms must identify the factors of TQM which is relevant for their operations. The
project management activities include many factors and those vary from one firm to

5CONCLUSIONS AND RECOMMENDATIONS
other. Thus, before integrating a general TQM framework, the firms must identify the
specific needs and apply the framework accordingly (Dale 2015).
The firms must have the infrastructure for providing the scope for continuous
improvement in the TQM process to achieve an efficient outcome.
The firms must conduct a cost benefit analysis before implementing the TQM in their
project management. If the implementation cost becomes higher than the project cost,
then the profitability of the firm would reduce (Wang, Chen and Chen 2012). Although,
these two factors are positively related, yet the firms must adopt ways which would
reduce their production cost.
While implementing the TQM, the firms must determine the quality requirements.
Customer survey is beneficial for this as that would help the firms to get information
about the customers’ needs, demands and expectations. This information will help the
firms to determine the standard for quality and requirement for the TQM based project
(Saeed and Hasan 2012).
The firms should also focus on developing a strategy for continuous improvement. The
strategy should have the scope for multiple iterations and amendments as well as must
keep buffers or safety margins (Khan 2003). During the project many unforeseen
situation can arise and for that the firm must make a contingency plan beforehand by
creating scopes within the TQM strategy plan. The contingency plan should be made to
overcome any sudden threats or challenges, which have the capability to affect the quality
levels of the project. Risk response strategy is also important to manage risks and reduce
their negative impact.
other. Thus, before integrating a general TQM framework, the firms must identify the
specific needs and apply the framework accordingly (Dale 2015).
The firms must have the infrastructure for providing the scope for continuous
improvement in the TQM process to achieve an efficient outcome.
The firms must conduct a cost benefit analysis before implementing the TQM in their
project management. If the implementation cost becomes higher than the project cost,
then the profitability of the firm would reduce (Wang, Chen and Chen 2012). Although,
these two factors are positively related, yet the firms must adopt ways which would
reduce their production cost.
While implementing the TQM, the firms must determine the quality requirements.
Customer survey is beneficial for this as that would help the firms to get information
about the customers’ needs, demands and expectations. This information will help the
firms to determine the standard for quality and requirement for the TQM based project
(Saeed and Hasan 2012).
The firms should also focus on developing a strategy for continuous improvement. The
strategy should have the scope for multiple iterations and amendments as well as must
keep buffers or safety margins (Khan 2003). During the project many unforeseen
situation can arise and for that the firm must make a contingency plan beforehand by
creating scopes within the TQM strategy plan. The contingency plan should be made to
overcome any sudden threats or challenges, which have the capability to affect the quality
levels of the project. Risk response strategy is also important to manage risks and reduce
their negative impact.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6CONCLUSIONS AND RECOMMENDATIONS
Firms must assess their resources in detailed manner while starting a TQM based project.
To make the TQM implementation runs smoothly, they must ensure that there is no lack
of resources in each of the stages. Continuous monitoring and tracking of the project is
required to ensure the there is no lack of resources, as well as, wastage of valuable
resources (Ross 2017).
With the implementation of the above-mentioned recommendations, the project based firms in
Kuwait can have efficient TQM based projects, which would improve their project management
abilities.
5.4 Implications of the study
The study has academic as well as business implications. There have been many scholars who
have explored the subject of TQM and its benefits and costs. Various industries have been
studied to evaluate the impact of the TQM on project management. However, the industry of
Kuwait was not explored earlier. Through this study, the researcher has thrown light to the
project based firms in Kuwait. The research topic was further segregated into three subsections,
which addressed three major factors, namely, project cost, project schedule and continuous
improvement process. This is beneficial in the academic field as it explored the sections of
project management in a detailed manner and described different aspects of the TQM. It also
explored the project management scenario in Kuwait’s banking, construction and healthcare
sectors, which added significant information in the world of literature and research. This paper
will be beneficial for the future researchers, who would pursue study on related subject and
further exploration would be done on TQM and its application in project management.
Firms must assess their resources in detailed manner while starting a TQM based project.
To make the TQM implementation runs smoothly, they must ensure that there is no lack
of resources in each of the stages. Continuous monitoring and tracking of the project is
required to ensure the there is no lack of resources, as well as, wastage of valuable
resources (Ross 2017).
With the implementation of the above-mentioned recommendations, the project based firms in
Kuwait can have efficient TQM based projects, which would improve their project management
abilities.
5.4 Implications of the study
The study has academic as well as business implications. There have been many scholars who
have explored the subject of TQM and its benefits and costs. Various industries have been
studied to evaluate the impact of the TQM on project management. However, the industry of
Kuwait was not explored earlier. Through this study, the researcher has thrown light to the
project based firms in Kuwait. The research topic was further segregated into three subsections,
which addressed three major factors, namely, project cost, project schedule and continuous
improvement process. This is beneficial in the academic field as it explored the sections of
project management in a detailed manner and described different aspects of the TQM. It also
explored the project management scenario in Kuwait’s banking, construction and healthcare
sectors, which added significant information in the world of literature and research. This paper
will be beneficial for the future researchers, who would pursue study on related subject and
further exploration would be done on TQM and its application in project management.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7CONCLUSIONS AND RECOMMENDATIONS
In the business world perspective, this paper is important, as the paper conducted an empirical
investigation on the impact of TQM on two aspects of project management and the effect of
continuous improvement as a mediator of efficient project management in Kuwait, and found
that TQM is important for achieving efficiency and competitive edge in the market, that is, in the
banking, construction and healthcare sector of Kuwait. The paper also presented
recommendations on how to plan strategies and implement an efficient TQM to enhance the
efficiency of the system. The firms can consult this paper to get an idea about the factors in TQM
and how the TQM factors are increasing efficiency in project management in Kuwait and can
make decisions and strategies accordingly. Thus, the research study has important implications in
both the academic and business world.
5.5 Future Research Suggestions
There are some limitations of this study, which can provide scope to the future researchers for
exploration. The researchers can dig deep into the number of factors of TQM, which according
to some are 4, while for some, can reach up to 20. Since, this study focused only on two factors,
there is scope of further research to find out other important factors. Similarly, the researchers
can also focus on various external factors to examine their impact on the TQM implementation
and its outcome. Moreover, the researcher picked out the industries based on the contribution to
GDP of the nation. Hence, only banking, construction and healthcare sector has been chosen.
However, TQM is used in other industries also, such as, in the automotive and manufacturing
industry, and the future researchers can focus on those industries to find out the impact of TQM.
Lastly, the sample size should be increased to check the consistency of the data. In this paper,
primary data is collected from 154 individuals, working in the banking, health and construction
sectors in Kuwait. In the future, the researchers should include other industries and consider
In the business world perspective, this paper is important, as the paper conducted an empirical
investigation on the impact of TQM on two aspects of project management and the effect of
continuous improvement as a mediator of efficient project management in Kuwait, and found
that TQM is important for achieving efficiency and competitive edge in the market, that is, in the
banking, construction and healthcare sector of Kuwait. The paper also presented
recommendations on how to plan strategies and implement an efficient TQM to enhance the
efficiency of the system. The firms can consult this paper to get an idea about the factors in TQM
and how the TQM factors are increasing efficiency in project management in Kuwait and can
make decisions and strategies accordingly. Thus, the research study has important implications in
both the academic and business world.
5.5 Future Research Suggestions
There are some limitations of this study, which can provide scope to the future researchers for
exploration. The researchers can dig deep into the number of factors of TQM, which according
to some are 4, while for some, can reach up to 20. Since, this study focused only on two factors,
there is scope of further research to find out other important factors. Similarly, the researchers
can also focus on various external factors to examine their impact on the TQM implementation
and its outcome. Moreover, the researcher picked out the industries based on the contribution to
GDP of the nation. Hence, only banking, construction and healthcare sector has been chosen.
However, TQM is used in other industries also, such as, in the automotive and manufacturing
industry, and the future researchers can focus on those industries to find out the impact of TQM.
Lastly, the sample size should be increased to check the consistency of the data. In this paper,
primary data is collected from 154 individuals, working in the banking, health and construction
sectors in Kuwait. In the future, the researchers should include other industries and consider

8CONCLUSIONS AND RECOMMENDATIONS
having a larger sample to check if different industries have different implications regarding the
application of TQM.
having a larger sample to check if different industries have different implications regarding the
application of TQM.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9CONCLUSIONS AND RECOMMENDATIONS
References
Dale, B., 2015. Total quality management. John Wiley & Sons, Ltd.
Gimenez-Espin, J.A., Jiménez-Jiménez, D. and Martínez-Costa, M., 2013. Organizational culture
for total quality management. Total Quality Management & Business Excellence, 24(5-6),
pp.678-692.
Khan, J., 2003. Impact of total quality management on productivity. The TQM Magazine,
[online] 15(6), pp.374-380. Available at:
https://www.researchgate.net/publication/241772333_Impact_of_total_quality_management_on_
productivity [Accessed 28 Jun. 2018].
Oakland, J.S., 2014. Total quality management and operational excellence: text with cases.
Routledge.
Ross, J.E., 2017. Total quality management: Text, cases, and readings. Routledge.
Saeed, N.M.N. and Hasan, A.S., 2012. The effect of total quality management on construction
project performance. Journal of Science and Technology, 17.
Wang, C.H., Chen, K.Y. and Chen, S.C., 2012. Total quality management, market orientation
and hotel performance: The moderating effects of external environmental factors. International
Journal of Hospitality Management, 31(1), pp.119-129.
References
Dale, B., 2015. Total quality management. John Wiley & Sons, Ltd.
Gimenez-Espin, J.A., Jiménez-Jiménez, D. and Martínez-Costa, M., 2013. Organizational culture
for total quality management. Total Quality Management & Business Excellence, 24(5-6),
pp.678-692.
Khan, J., 2003. Impact of total quality management on productivity. The TQM Magazine,
[online] 15(6), pp.374-380. Available at:
https://www.researchgate.net/publication/241772333_Impact_of_total_quality_management_on_
productivity [Accessed 28 Jun. 2018].
Oakland, J.S., 2014. Total quality management and operational excellence: text with cases.
Routledge.
Ross, J.E., 2017. Total quality management: Text, cases, and readings. Routledge.
Saeed, N.M.N. and Hasan, A.S., 2012. The effect of total quality management on construction
project performance. Journal of Science and Technology, 17.
Wang, C.H., Chen, K.Y. and Chen, S.C., 2012. Total quality management, market orientation
and hotel performance: The moderating effects of external environmental factors. International
Journal of Hospitality Management, 31(1), pp.119-129.
1 out of 10
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.