This report delves into the application of project management principles for redeveloping Uber's driver application. It emphasizes the importance of PMBOK knowledge areas, processes, and PMI's code of ethics for guiding the project. Various project management approaches and selection methods, such as cost-benefit ratio and payback period, are compared and contrasted to determine their suitability for the project. The report also highlights project management tools and techniques used for risk management, including documentation review, brainstorming, and root-cause analysis. The goal is to provide Uber drivers with a simpler, faster, and more efficient driving experience through the revamped app. This document is available on Desklib, where students can access a wealth of solved assignments and past papers.

Running head: PROJECT MANAGEMENT
Project management
Name of the Student
Name of the University
Author’s Note
Project management
Name of the Student
Name of the University
Author’s Note
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1
PROJECT MANAGEMENT
1. Introduction
The paper mainly reflects on the principles of project management that is mainly applied
for redeveloping an app for Uber drivers for providing directive approach to the drivers and for
giving them the facility of simple as well as fastest driving experience. The paper analyses the
PMBOK knowledge areas as well as processes and generally helps in creating proper impact on
the practices of project management. The paper also compares various approaches of project
management for successfully executing the project. In addition to this, proper project
management tools as well as techniques are utilized in order to manage the risks that are faced by
the project team while developing the app.
2. Discussion
Relevance and impact of project management best practices and PMI’s code of ethics
The redevelopment of app for the Uber drivers will generally act as one of the personal
coach. It is found that the utilization of proper project management practices as well as PMI’S
code of ethics as per the PMBOK knowledge areas are generally needed. The first and the most
important practice that must be adopted within the app development project is defining scope and
objectives of the project (Kerzner&Kerzner, 2017). Proper understanding about the project
objectives helps in providing proper idea about the project and as a result the team can be able to
progress effectively in executing the work of the project.
Moreover, understanding about the project stakeholders and what is expected to be
delivered in the project is required for developing the app for the Uber drivers. As the Uber
drivers need to make pretty complex calculation about the most profitable place that they should
drive and therefore, it is necessary to elaborate the deliverables of the project effectively.
PROJECT MANAGEMENT
1. Introduction
The paper mainly reflects on the principles of project management that is mainly applied
for redeveloping an app for Uber drivers for providing directive approach to the drivers and for
giving them the facility of simple as well as fastest driving experience. The paper analyses the
PMBOK knowledge areas as well as processes and generally helps in creating proper impact on
the practices of project management. The paper also compares various approaches of project
management for successfully executing the project. In addition to this, proper project
management tools as well as techniques are utilized in order to manage the risks that are faced by
the project team while developing the app.
2. Discussion
Relevance and impact of project management best practices and PMI’s code of ethics
The redevelopment of app for the Uber drivers will generally act as one of the personal
coach. It is found that the utilization of proper project management practices as well as PMI’S
code of ethics as per the PMBOK knowledge areas are generally needed. The first and the most
important practice that must be adopted within the app development project is defining scope and
objectives of the project (Kerzner&Kerzner, 2017). Proper understanding about the project
objectives helps in providing proper idea about the project and as a result the team can be able to
progress effectively in executing the work of the project.
Moreover, understanding about the project stakeholders and what is expected to be
delivered in the project is required for developing the app for the Uber drivers. As the Uber
drivers need to make pretty complex calculation about the most profitable place that they should
drive and therefore, it is necessary to elaborate the deliverables of the project effectively.

2
PROJECT MANAGEMENT
Planning of project is considered as one of the best practice that is required by the project
manager in order to decide which people, resources as well as budget are generally needed in
order to complete the entire project quite successfully (Harrison & Lock, 2017). Proper
estimation as well as effort are generally needed for each of the activities of the project such that
the dependencies between the project activities helps in producing realistic schedule for
executing the deliverables of the project successfully (Sharp, Peters & Howard, 2017). In
addition to this, it is found that communication generally plays an important role for performing
the basic functions of management including planning, organizing as well as motivating and
controlling the entire project team.
Compare and contrast project management approaches and appropriateness to manage
the project types
Project selection methods applied to Uber project
The main aim of Uber is to rebuild the application for the drivers. The new application
can draw on the technological components of new rider application. This new project follows of
various project selection methods which are applied to analyze features as well as characteristics
of Uber application project. Following are the project selection methods which are applied in the
Uber project such as:
Cost benefit ratio is a benefit measurement method where the cost benefit ratio is an
effective method to communicate potential project value in understandable terms. This method
measures the cost of total investment into the project against value of return once it is being
completed. Uber driver requires an application which is simple and faster and also cost benefit
for the driver’s experiences with using the app (Fleming & Koppelman, 2016). One of the ways
is to finance the costs of the riders, paying the drivers as well as indicating the riders less than it
PROJECT MANAGEMENT
Planning of project is considered as one of the best practice that is required by the project
manager in order to decide which people, resources as well as budget are generally needed in
order to complete the entire project quite successfully (Harrison & Lock, 2017). Proper
estimation as well as effort are generally needed for each of the activities of the project such that
the dependencies between the project activities helps in producing realistic schedule for
executing the deliverables of the project successfully (Sharp, Peters & Howard, 2017). In
addition to this, it is found that communication generally plays an important role for performing
the basic functions of management including planning, organizing as well as motivating and
controlling the entire project team.
Compare and contrast project management approaches and appropriateness to manage
the project types
Project selection methods applied to Uber project
The main aim of Uber is to rebuild the application for the drivers. The new application
can draw on the technological components of new rider application. This new project follows of
various project selection methods which are applied to analyze features as well as characteristics
of Uber application project. Following are the project selection methods which are applied in the
Uber project such as:
Cost benefit ratio is a benefit measurement method where the cost benefit ratio is an
effective method to communicate potential project value in understandable terms. This method
measures the cost of total investment into the project against value of return once it is being
completed. Uber driver requires an application which is simple and faster and also cost benefit
for the driver’s experiences with using the app (Fleming & Koppelman, 2016). One of the ways
is to finance the costs of the riders, paying the drivers as well as indicating the riders less than it
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3
PROJECT MANAGEMENT
is gainful. Using this measurement method, it is found that for Uber, there were losses of $4.5
billion in the year 2017 and $2.8 billion in the year 2018.
Payback period is one of the method is referred to the times which are taken to recover
the expenses locked in this new project. The project is provided returnable value which has lower
payback period. Uber has made changes in their current process by reviewing the websites of
drivers and forums which indicated that the drivers should remain unsatisfied (Todorović et al.,
2015). The drive friendly measurement is to allow for greater flexibility to pick which directions
the rides are taken them. Other is to pack back for the tolls which are incurred while taking to the
riders. The time value of the money is not to be taken in this case. In implementation of Uber
app, the payback period is a tool which is easier to apply as well as easier to understand for the
drivers (Fleming & Koppelman, 2016). The measures of return are conducted throughout net
present value and internal rate of the return.
Project management processes used to conduct the methods
Following are the project management approaches and processes which are used to
conduct the methods such as:
A business case document on implementation of Uber app project is formal and written
arguments which are intended to approve the project plan. The business case is explored feasible
approaches to the problems and enables the business owners to select the options that can best
serve the organization, Uber.
The feasibility study tests viability of the idea of implementation of the new Uber app for
the customers so that it is used to manage the implementation and building of application for
Uber. By means of this process throughout empowered teams, involvement of the customer as
PROJECT MANAGEMENT
is gainful. Using this measurement method, it is found that for Uber, there were losses of $4.5
billion in the year 2017 and $2.8 billion in the year 2018.
Payback period is one of the method is referred to the times which are taken to recover
the expenses locked in this new project. The project is provided returnable value which has lower
payback period. Uber has made changes in their current process by reviewing the websites of
drivers and forums which indicated that the drivers should remain unsatisfied (Todorović et al.,
2015). The drive friendly measurement is to allow for greater flexibility to pick which directions
the rides are taken them. Other is to pack back for the tolls which are incurred while taking to the
riders. The time value of the money is not to be taken in this case. In implementation of Uber
app, the payback period is a tool which is easier to apply as well as easier to understand for the
drivers (Fleming & Koppelman, 2016). The measures of return are conducted throughout net
present value and internal rate of the return.
Project management processes used to conduct the methods
Following are the project management approaches and processes which are used to
conduct the methods such as:
A business case document on implementation of Uber app project is formal and written
arguments which are intended to approve the project plan. The business case is explored feasible
approaches to the problems and enables the business owners to select the options that can best
serve the organization, Uber.
The feasibility study tests viability of the idea of implementation of the new Uber app for
the customers so that it is used to manage the implementation and building of application for
Uber. By means of this process throughout empowered teams, involvement of the customer as
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4
PROJECT MANAGEMENT
well as capability to control changes to project scope (Kerzner, 2018). The aim of feasibility
study is to emphasize the potential issues which can occur to measure the financial factors of the
project. It will help to reduce the waste and improve over quality of the products and services
that Uber drivers provide to their customers. It also helps to improve over the customer and
employee satisfaction. Uber is serious regarding treating the drivers better. Acquiring as well as
keeping Uber drivers on the platform is main expense of the new project (Fritz et al., 2017). Uber
maintains the driver’s satisfaction level.
A project charter is to be developed based on implementation of Uber app project. It is
the process to develop the document that can authorize existence of the project work and provide
the project manager with an authority to pply the resources to the project related activities. The
charter document consists of the total time required and finishes time of the project so that the
project team members should process the project activities based on it.
The project work is assigned to the project team members so that the implementation
work is to be carried out properly. This project process helps to define involvement of project
stakeholders and team input to smaller project groups (Serrador & Pinto, 2015). Uber project is
required effective monitoring of the project so that the passengers and drivers both are satisfied
with implementation of this app. This app is started to roll out the smaller portions of the drivers
with selected cities. It is required for clients to understand that it can seek work in progress into
progress of the benefit of implementation of Uber app.
The project work is to be arranged in a proper way so that the project team members can
perform the work based on it. It is done and applied with aspects of planning processes, and then
it can create rigidity for creating delays and creativity (Sharp, Peters & Howard, 2017). The
PROJECT MANAGEMENT
well as capability to control changes to project scope (Kerzner, 2018). The aim of feasibility
study is to emphasize the potential issues which can occur to measure the financial factors of the
project. It will help to reduce the waste and improve over quality of the products and services
that Uber drivers provide to their customers. It also helps to improve over the customer and
employee satisfaction. Uber is serious regarding treating the drivers better. Acquiring as well as
keeping Uber drivers on the platform is main expense of the new project (Fritz et al., 2017). Uber
maintains the driver’s satisfaction level.
A project charter is to be developed based on implementation of Uber app project. It is
the process to develop the document that can authorize existence of the project work and provide
the project manager with an authority to pply the resources to the project related activities. The
charter document consists of the total time required and finishes time of the project so that the
project team members should process the project activities based on it.
The project work is assigned to the project team members so that the implementation
work is to be carried out properly. This project process helps to define involvement of project
stakeholders and team input to smaller project groups (Serrador & Pinto, 2015). Uber project is
required effective monitoring of the project so that the passengers and drivers both are satisfied
with implementation of this app. This app is started to roll out the smaller portions of the drivers
with selected cities. It is required for clients to understand that it can seek work in progress into
progress of the benefit of implementation of Uber app.
The project work is to be arranged in a proper way so that the project team members can
perform the work based on it. It is done and applied with aspects of planning processes, and then
it can create rigidity for creating delays and creativity (Sharp, Peters & Howard, 2017). The

5
PROJECT MANAGEMENT
satisfaction level of the customers is taken at highest priority where the internal quality is
measured to achieve the organizational goals.
The entire project phases are to be reviewed. When the company optimizes the driver
partners, then there is longer term winner for Uber. The entire project work is reviewed so that
there is possibility of project success at the end (Todorović et al., 2015). It is concern that creates
precession of goods where quality is based on priority of the customers and also customer’s
expectations. Therefore, entire project documents are to be reviewed by the project manager.
Project management tools and techniques based on risk management
There are a number of tools and techniques of project management based on the risk
management in this particular project are:Documentation review is one of the standard is used to
identify the project risks by reviewing the project related documents like lessons learned,
organizational processes and project related assets (Bathallath, Smedberg, & Kjellin,
2016).Brainstorming is performed with group of people those are focused on identification of the
risks in Uber application development project for the drivers (Kerzner, 2018). Mainly, the target
group is the drivers to analyze if the Uber app provides benefits to them in picking up the
passengers from its pick up location as well as reaches them to its designation.
Root-cause analysisis determined to identify the causes of identified project risks in the
project work. The causes of each project risks are based on identification of the risks in new
project such as customers and driver’s satisfaction level (Yet et al., 2016). The IT system failure
is also maintained properly so that there are no causes of system failures in building of app.
PROJECT MANAGEMENT
satisfaction level of the customers is taken at highest priority where the internal quality is
measured to achieve the organizational goals.
The entire project phases are to be reviewed. When the company optimizes the driver
partners, then there is longer term winner for Uber. The entire project work is reviewed so that
there is possibility of project success at the end (Todorović et al., 2015). It is concern that creates
precession of goods where quality is based on priority of the customers and also customer’s
expectations. Therefore, entire project documents are to be reviewed by the project manager.
Project management tools and techniques based on risk management
There are a number of tools and techniques of project management based on the risk
management in this particular project are:Documentation review is one of the standard is used to
identify the project risks by reviewing the project related documents like lessons learned,
organizational processes and project related assets (Bathallath, Smedberg, & Kjellin,
2016).Brainstorming is performed with group of people those are focused on identification of the
risks in Uber application development project for the drivers (Kerzner, 2018). Mainly, the target
group is the drivers to analyze if the Uber app provides benefits to them in picking up the
passengers from its pick up location as well as reaches them to its designation.
Root-cause analysisis determined to identify the causes of identified project risks in the
project work. The causes of each project risks are based on identification of the risks in new
project such as customers and driver’s satisfaction level (Yet et al., 2016). The IT system failure
is also maintained properly so that there are no causes of system failures in building of app.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6
PROJECT MANAGEMENT
3. Conclusion
It can be concluded from the entire paper that utilization of proper PMBOK knowledge
areas as well as processes are utilized in order to reflect on the project management best practices
as well as PMI’s code of ethics in order to properly execute the redevelopment of the app
effectively. In addition to this, the paper use different project management approaches and
successfully reflect the importance of the project management approach that is generally used
within the project. Furthermore, the paper also elaborates the techniques as well as tools that are
helpful in managing the risks that are associated with the project.
PROJECT MANAGEMENT
3. Conclusion
It can be concluded from the entire paper that utilization of proper PMBOK knowledge
areas as well as processes are utilized in order to reflect on the project management best practices
as well as PMI’s code of ethics in order to properly execute the redevelopment of the app
effectively. In addition to this, the paper use different project management approaches and
successfully reflect the importance of the project management approach that is generally used
within the project. Furthermore, the paper also elaborates the techniques as well as tools that are
helpful in managing the risks that are associated with the project.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7
PROJECT MANAGEMENT
References
Bathallath, S., Smedberg, Å., &Kjellin, H. (2016). Managing project interdependencies in IT/IS
project portfolios: a review of managerial issues. International journal of information
systems and project management, 4(1), 67-82.
Fleming, Q. W., &Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Fritz, J., Miller, C. M., Cavanaugh, A., &Ebramsyah, A. (2017). Practical Application of Six
Sigma in Team Environments.
Harrison, F., & Lock, D. (2017). Advanced project management: a structured approach.
Routledge.
Kerzner, H. (2018). Project management best practices: Achieving global excellence. John
Wiley & Sons.
Kerzner, H., &Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Serrador, P., & Pinto, J. K. (2015). Does Agile work?—A quantitative analysis of agile project
success. International Journal of Project Management, 33(5), 1040-1051.
Sharp, J. A., Peters, J., & Howard, K. (2017). The management of a student research project.
Routledge.
PROJECT MANAGEMENT
References
Bathallath, S., Smedberg, Å., &Kjellin, H. (2016). Managing project interdependencies in IT/IS
project portfolios: a review of managerial issues. International journal of information
systems and project management, 4(1), 67-82.
Fleming, Q. W., &Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Fritz, J., Miller, C. M., Cavanaugh, A., &Ebramsyah, A. (2017). Practical Application of Six
Sigma in Team Environments.
Harrison, F., & Lock, D. (2017). Advanced project management: a structured approach.
Routledge.
Kerzner, H. (2018). Project management best practices: Achieving global excellence. John
Wiley & Sons.
Kerzner, H., &Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Serrador, P., & Pinto, J. K. (2015). Does Agile work?—A quantitative analysis of agile project
success. International Journal of Project Management, 33(5), 1040-1051.
Sharp, J. A., Peters, J., & Howard, K. (2017). The management of a student research project.
Routledge.

8
PROJECT MANAGEMENT
Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., &Bushuyev, S. D. (2015).
Project success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), 772-783.
Turner, R. (2016). Gower handbook of project management. Routledge.
Verzuh, E. (2015). The fast forward MBA in project management. John Wiley & Sons.
Yet, B., Constantinou, A., Fenton, N., Neil, M., Luedeling, E., & Shepherd, K. (2016). A
Bayesian network framework for project cost, benefit and risk analysis with an
agricultural development case study. Expert Systems with Applications, 60, 141-155.
PROJECT MANAGEMENT
Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., &Bushuyev, S. D. (2015).
Project success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), 772-783.
Turner, R. (2016). Gower handbook of project management. Routledge.
Verzuh, E. (2015). The fast forward MBA in project management. John Wiley & Sons.
Yet, B., Constantinou, A., Fenton, N., Neil, M., Luedeling, E., & Shepherd, K. (2016). A
Bayesian network framework for project cost, benefit and risk analysis with an
agricultural development case study. Expert Systems with Applications, 60, 141-155.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 9
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.