This document presents a system analysis and design assignment. The first part focuses on a library management system, including a context diagram, a level 0 DFD, and a diagram for the late penalty process. The second part covers project management techniques, with a work breakdown structure (WBS) outlining tasks, durations, and dependencies. A PERT chart is included, and the critical path for the project is identified. The assignment also includes a bibliography citing relevant sources. The assignment also covers the university enrollment process with diagrams and the critical path for successful enrollment is calculated.

Running head: SYSTEM ANALYSIS AND DESIGNING
SYSTEM ANALYSIS AND DESIGNING
Day: Thursday
Date: 12/09/2019
Student name: Jagbir Singh gill
Student id: 180079
SYSTEM ANALYSIS AND DESIGNING
Day: Thursday
Date: 12/09/2019
Student name: Jagbir Singh gill
Student id: 180079
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1SYSTEM ANALYSIS AND DESIGNING
Table of Contents
Question 1:.......................................................................................................................................2
A context diagram for the library system....................................................................................2
A diagram level 0 DFD................................................................................................................2
For late penalty process diagram.................................................................................................3
Question 2: work breakdown structure............................................................................................3
PERT chart...................................................................................................................................4
Critical path for the project..........................................................................................................4
Bibliography....................................................................................................................................5
Table of Contents
Question 1:.......................................................................................................................................2
A context diagram for the library system....................................................................................2
A diagram level 0 DFD................................................................................................................2
For late penalty process diagram.................................................................................................3
Question 2: work breakdown structure............................................................................................3
PERT chart...................................................................................................................................4
Critical path for the project..........................................................................................................4
Bibliography....................................................................................................................................5

2SYSTEM ANALYSIS AND DESIGNING
Question 1:
A context diagram for the library system
The above diagram is developed for designing the library management system and the
basic activities that are carried out within the system. The main activities that can be performed
by the customer includes enrolling into the system, getting access over the products and issuing
books/dvd/toys. The user can return the books on time and if they delay than the amount will get
deducted.
Question 1:
A context diagram for the library system
The above diagram is developed for designing the library management system and the
basic activities that are carried out within the system. The main activities that can be performed
by the customer includes enrolling into the system, getting access over the products and issuing
books/dvd/toys. The user can return the books on time and if they delay than the amount will get
deducted.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3SYSTEM ANALYSIS AND DESIGNING
A diagram level 0 DFD
The above diagram is used for representing the dfd for the library management
system.
A diagram level 0 DFD
The above diagram is used for representing the dfd for the library management
system.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4SYSTEM ANALYSIS AND DESIGNING
For late penalty process diagram
above is the late process diagram
Question 2: work breakdown structure
Task Name Duration Start Finish Predecessors
Getting to college 1 day
Tue
9/10/19
Tue
9/10/19
Setting up alarm 0.1 days Tue 9/10/19 Tue 9/10/19
Perform ablutions 0.1 days Tue 9/10/19 Tue 9/10/19 1
prepare breakfast 0.1 days Tue 9/10/19 Tue 9/10/19 2
eat breakfast 0.1 days Tue 9/10/19 Tue 9/10/19 3
For late penalty process diagram
above is the late process diagram
Question 2: work breakdown structure
Task Name Duration Start Finish Predecessors
Getting to college 1 day
Tue
9/10/19
Tue
9/10/19
Setting up alarm 0.1 days Tue 9/10/19 Tue 9/10/19
Perform ablutions 0.1 days Tue 9/10/19 Tue 9/10/19 1
prepare breakfast 0.1 days Tue 9/10/19 Tue 9/10/19 2
eat breakfast 0.1 days Tue 9/10/19 Tue 9/10/19 3

5SYSTEM ANALYSIS AND DESIGNING
take shower 0.1 days Tue 9/10/19 Tue 9/10/19 4
dress up for going to
the college
0.1 days Tue 9/10/19 Tue 9/10/19 5
leave for college
from home
0.1 days Tue 9/10/19 Tue 9/10/19 6
take bus from bus
stop
0.1 days Tue 9/10/19 Tue 9/10/19 7
take tickets 0.1 days Tue 9/10/19 Tue 9/10/19 8
reach college 0.1 days Tue 9/10/19 Tue 9/10/19 9
PERT chart
Critical path for the project
The critical path for the project is = 0.1+0.1+0.1+0.1+0.1+0.1+0.1+0.1+0.1+0.1=1
take shower 0.1 days Tue 9/10/19 Tue 9/10/19 4
dress up for going to
the college
0.1 days Tue 9/10/19 Tue 9/10/19 5
leave for college
from home
0.1 days Tue 9/10/19 Tue 9/10/19 6
take bus from bus
stop
0.1 days Tue 9/10/19 Tue 9/10/19 7
take tickets 0.1 days Tue 9/10/19 Tue 9/10/19 8
reach college 0.1 days Tue 9/10/19 Tue 9/10/19 9
PERT chart
Critical path for the project
The critical path for the project is = 0.1+0.1+0.1+0.1+0.1+0.1+0.1+0.1+0.1+0.1=1
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6SYSTEM ANALYSIS AND DESIGNING
Bibliography
Dennis, A., Wixom, B.H. and Tegarden, D., 2015. Systems analysis and design: An object-
oriented approach with UML. John wiley & sons.
Petre, M., 2013, May. UML in practice. In 2013 35th International Conference on Software
Engineering (ICSE) (pp. 722-731). IEEE.
Wu, W. and Issa, R.R., 2014. BIM execution planning in green building projects: LEED as a use
case. Journal of Management in Engineering, 31(1), p.A4014007.
Yilmaz, O.N., Wang, Y.P.E., Johansson, N.A., Brahmi, N., Ashraf, S.A. and Sachs, J., 2015,
June. Analysis of ultra-reliable and low-latency 5G communication for a factory automation use
case. In 2015 IEEE international conference on communication workshop (ICCW) (pp. 1190-
1195). IEEE.
Yue, T., Briand, L.C. and Labiche, Y., 2013. Facilitating the transition from use case models to
analysis models: Approach and experiments. ACM Transactions on Software Engineering and
Methodology (TOSEM), 22(1), p.5.
Bibliography
Dennis, A., Wixom, B.H. and Tegarden, D., 2015. Systems analysis and design: An object-
oriented approach with UML. John wiley & sons.
Petre, M., 2013, May. UML in practice. In 2013 35th International Conference on Software
Engineering (ICSE) (pp. 722-731). IEEE.
Wu, W. and Issa, R.R., 2014. BIM execution planning in green building projects: LEED as a use
case. Journal of Management in Engineering, 31(1), p.A4014007.
Yilmaz, O.N., Wang, Y.P.E., Johansson, N.A., Brahmi, N., Ashraf, S.A. and Sachs, J., 2015,
June. Analysis of ultra-reliable and low-latency 5G communication for a factory automation use
case. In 2015 IEEE international conference on communication workshop (ICCW) (pp. 1190-
1195). IEEE.
Yue, T., Briand, L.C. and Labiche, Y., 2013. Facilitating the transition from use case models to
analysis models: Approach and experiments. ACM Transactions on Software Engineering and
Methodology (TOSEM), 22(1), p.5.
1 out of 7
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.