Project Report: Campus Network System Implementation for University

Verified

Added on  2020/03/28

|22
|2857
|48
Project
AI Summary
This project report outlines the implementation of a campus network system for Melbourne Institute of Technology. The project aims to provide students and staff with wireless network access across the campus, enhancing teaching and research capabilities. The report details the project's goals, objectives, and requirements, including functional and non-functional specifications. It includes a comprehensive project plan with a work breakdown structure, estimated timeline, Gantt chart, network diagram, and cost analysis. The plan also covers quality assurance, stakeholder analysis, communication strategies, and risk management. Ethical considerations and a project deployment plan are also included. The report concludes with a plan to expedite the project duration and a post-project review. The project's total duration is estimated to be 340 days with a total cost of $170,800.00.
Document Page
Running head: IMPLEMENTATION OF CAMPUS NETWORK SYSTEM FOR UNIVERSITY
Implementation of campus network system for university
Name of the Student:
Name of the University:
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1IMPLEMENTATION OF CAMPUS NETWORK SYSTEM FOR UNIVERSITY
Executive Summary
The report is based on implementation of a wireless networking system into the university which
provides the students and staffs with central computing facilities with the network server. The network
system provides the staffs with wireless access to the network is needed. The authorized person can
able to access to the wireless network system. The total duration of the project plan is 340 days with
cost of $170,800.00.
Document Page
2IMPLEMENTATION OF CAMPUS NETWORK SYSTEM FOR UNIVERSITY
Table of Contents
1.0 Project Outline.......................................................................................................................................4
1.1 Project Title.......................................................................................................................................4
1.2 Start and end date.............................................................................................................................4
1.3 Goals..................................................................................................................................................4
1.4 Objectives..........................................................................................................................................4
2.0 Project requirements.............................................................................................................................4
3.0 Project Team Members.........................................................................................................................5
4.0 Project Plan............................................................................................................................................5
4.1 Project Scope.....................................................................................................................................5
4.2 Work breakdown structure...............................................................................................................6
4.3 Estimated timeline.............................................................................................................................7
4.4 Gantt chart and network diagram.....................................................................................................9
4.4.1 Gantt chart..................................................................................................................................9
4.4.2 Network diagram......................................................................................................................10
4.5 Estimated cost.................................................................................................................................11
4.6 Quality plan.....................................................................................................................................12
4.7 Stakeholder analysis........................................................................................................................12
4.8 Communications plan......................................................................................................................14
4.9 Risk management plan....................................................................................................................15
4.10 Ethical issues analysis....................................................................................................................15
4.11 Project deployment plan...............................................................................................................16
5.0 Crash the total project duration by 2 weeks........................................................................................17
6.0 Project signoff......................................................................................................................................19
Document Page
3IMPLEMENTATION OF CAMPUS NETWORK SYSTEM FOR UNIVERSITY
7.0 Post project review and recommendations.........................................................................................19
Bibliography...............................................................................................................................................20
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4IMPLEMENTATION OF CAMPUS NETWORK SYSTEM FOR UNIVERSITY
1.0 Project Outline
1.1 Project Title
Implementation of campus network system for university
1.2 Start and end date
Start date: 9/25/2017 and End date: 1/11/2019
1.3 Goals
The goal is to implement a campus network system for Melbourne Institute of Technology with
wireless network for the computing facilities. In the University, the wireless network system develops
teaching and research.
1.4 Objectives
Following are the objectives of this project plan:
ï‚· To provide wireless network system to students and staffs within 18 months
ï‚· To increased productivity by 30 percent with implementation of network system
ï‚· To attach new students and expand of the university network
2.0 Project requirements
Functional requirements Descriptions
Applications The wireless network supports of user applications like web browsing,
email and transferring of file.
Coverage areas The users require to access to wireless network from the campus premises.
It requires wireless connectivity into the administrative office, conferences
rooms, and computer labs.
Client devices The users should use of laptop which is running into Microsoft Vista
operating system.
Non-functional requirements
Security The wireless network is kept secured with strong password.
Usability The network system allows the users to access to the system from use of
Document Page
5IMPLEMENTATION OF CAMPUS NETWORK SYSTEM FOR UNIVERSITY
internet. The system uses of web browser as interface.
Accuracy The wireless network system provides with real time information to the
internet users.
3.0 Project Team Members
Project Team Member Skills
Project Manager Technical and Project management
Project Sponsor Financial
Project Group Leader Technical and Project management
4.0 Project Plan
4.1 Project Scope
Melbourne Institute of Technology does not consist of sufficient network infrastructure to
support the learning initiatives of 21st century. The wireless networking system project for the university
will consist of implement a wireless network infrastructure to meet with the current standards of the
university. It provides with networking foundations for the future of the university. This will provide with
robust wired as well as wireless network at the campus. This project plan will provide the staffs as well
as student with the devices which will support them with use of wireless technology within the
classroom.
Document Page
6IMPLEMENTATION OF CAMPUS NETWORK SYSTEM FOR UNIVERSITY
4.2 Work breakdown structure
Figure 1: Work breakdown structure
(Source: Created by author)
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7IMPLEMENTATION OF CAMPUS NETWORK SYSTEM FOR UNIVERSITY
4.3 Estimated timeline
Task Name Duration Start Finish
Implementation of campus network system for
university 340 days Mon 9/25/17 Fri 1/11/19
Planning and purchasing of the network
infrastructure 28 days Mon 9/25/17 Wed 11/1/17
Purchasing of hardware components 20 days Mon 9/25/17 Wed 11/1/17
Purchasing of software components 18 days Mon 9/25/17 Wed 10/18/17
Planning of network infrastructure 204 days Thu 10/19/17 Tue 7/31/18
Physical infrastructure 19 days Thu 10/19/17 Tue 11/14/17
Logical infrastructure 15 days Wed 11/15/17 Tue 12/5/17
Analysis on server information 20 days Wed 12/6/17 Tue 1/2/18
Start network implementation 15 days Wed 1/3/18 Tue 1/23/18
Verification of business need 17 days Wed 1/24/18 Thu 2/15/18
Determination of coverage area 12 days Fri 2/16/18 Mon 3/5/18
Planning the utilization of bandwidth 24 days Tue 3/6/18 Fri 4/6/18
Performing of site survey 19 days Mon 4/9/18 Thu 5/3/18
Implementation of security 20 days Fri 5/4/18 Thu 5/31/18
Deploy and train 21 days Fri 6/1/18 Fri 6/29/18
End of the network implementation phase 22 days Mon 7/2/18 Tue 7/31/18
Start end user planning phase 118 days Wed 8/1/18 Fri 1/11/19
Document Page
8IMPLEMENTATION OF CAMPUS NETWORK SYSTEM FOR UNIVERSITY
Implementation of the device drivers 19 days Wed 8/1/18 Mon 8/27/18
Gathering of requirements on the operating
system configuration 34 days Tue 8/28/18 Fri 10/12/18
Modification of the server environments 22 days Mon 10/15/18 Tue 11/13/18
Deployment of the operating systems 25 days Wed 11/14/18 Tue 12/18/18
Deployment of installation 18 days Wed 12/19/18 Fri 1/11/19
Document Page
9IMPLEMENTATION OF CAMPUS NETWORK SYSTEM FOR UNIVERSITY
4.4 Gantt chart and network diagram
4.4.1 Gantt chart
Figure 2: Gantt chart
(Source: Created by author)
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10IMPLEMENTATION OF CAMPUS NETWORK SYSTEM FOR UNIVERSITY
4.4.2 Network diagram
Figure 3: Network diagram
(Source: Created by author)
Document Page
11IMPLEMENTATION OF CAMPUS NETWORK SYSTEM FOR UNIVERSITY
4.5 Estimated cost
Task Name Cost
Implementation of campus network system for university $170,800.00
Planning and purchasing of the network infrastructure $20,160.00
Purchasing of hardware components $7,200.00
Purchasing of software components $12,960.00
Planning of network infrastructure $93,440.00
Physical infrastructure $7,600.00
Logical infrastructure $9,600.00
Analysis on server information $4,800.00
Start network implementation $6,000.00
Verification of business need $4,080.00
Determination of coverage area $7,680.00
Planning the utilization of bandwidth $9,600.00
Performing of site survey $9,120.00
Implementation of security $12,800.00
Deploy and train $15,120.00
End of the network implementation phase $7,040.00
Start end user planning phase $57,200.00
Implementation of the device drivers $12,160.00
Gathering of requirements on the operating system configuration $13,600.00
Modification of the server environments $8,800.00
Deployment of the operating systems $14,000.00