This report, focusing on procurement and contract management within the context of the English National Stadium Project at Wembley, examines the specific roles and responsibilities of project managers and procurement managers throughout the project lifecycle, including supplier development. It highlights the project manager's role in ensuring IT security and information assurance, as well as the procurement manager's role in project scope determination and document management. The report also addresses the complexity of the project, particularly concerning IT security and outplacement, and the challenges of contract and procurement management. It emphasizes the need for a comprehensive procurement plan that considers internal and external sources, price setting, contract negotiation, and inspection processes. The document references key literature on procurement and project management.

Running head: PROCUREMENT AND CONTRACTS: ASSESSMENT 3
Procurement and Contracts: Assessment 3
Name of the Student
Name of the University
Author Note
Procurement and Contracts: Assessment 3
Name of the Student
Name of the University
Author Note
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1PROCUREMENT AND CONTRACTS: ASSESSMENT 3
Table of Contents
Assessment 3:.............................................................................................................................2
Specific roles and responsibilities of project manager and procurement manager including
in supplier development as part of completions effort or throughout the project life cycle. .2
The complexity of the project and the challenges faced in terms of contracts and
procurement management over the full life-cycle of the project...........................................2
References..................................................................................................................................4
Table of Contents
Assessment 3:.............................................................................................................................2
Specific roles and responsibilities of project manager and procurement manager including
in supplier development as part of completions effort or throughout the project life cycle. .2
The complexity of the project and the challenges faced in terms of contracts and
procurement management over the full life-cycle of the project...........................................2
References..................................................................................................................................4

2PROCUREMENT AND CONTRACTS: ASSESSMENT 3
Assessment 3:
Specific roles and responsibilities of project manager and procurement manager
including in supplier development as part of completions effort or throughout the
project life cycle
The role of the project manager in this case for developing the English National
Stadium Project at Wembley would be the necessary handling of the project according to the
requirements of the organisation for certifying the IT security system along with the
information assurance discipline (Panda & Sahu, 2015). All the parts and parcel of the
privacy laws and regulations, accounting systems, detection of fraud and insider threats and
acceptor needs to be analysed by the project manager after the project completion to
understand if there are any kind of requirement for further supply of services or products
required from the vendors or the suppliers.
The management of integration for the development and detection of the project also
needs to be done by the procurement manager which includes the determination of the scope
of the project which has been done before and the association of the endurance of all the
proper documents as described in the above sections (Sanghera, 2019). The project manager
should be able to complete all the works about the documents from the side of the vendor and
the organisation with proper evaluation of the documents with proper techniques for selecting
the vendors and also evaluating the deliverables as per the contract made.
The complexity of the project and the challenges faced in terms of contracts and
procurement management over the full life-cycle of the project
Understanding the IT security and the outplacement of the firm is a complex process.
Most importantly, find in out the certification of the positions of the people in the
organisation and also certifying the information security manager to clarify the information
Assessment 3:
Specific roles and responsibilities of project manager and procurement manager
including in supplier development as part of completions effort or throughout the
project life cycle
The role of the project manager in this case for developing the English National
Stadium Project at Wembley would be the necessary handling of the project according to the
requirements of the organisation for certifying the IT security system along with the
information assurance discipline (Panda & Sahu, 2015). All the parts and parcel of the
privacy laws and regulations, accounting systems, detection of fraud and insider threats and
acceptor needs to be analysed by the project manager after the project completion to
understand if there are any kind of requirement for further supply of services or products
required from the vendors or the suppliers.
The management of integration for the development and detection of the project also
needs to be done by the procurement manager which includes the determination of the scope
of the project which has been done before and the association of the endurance of all the
proper documents as described in the above sections (Sanghera, 2019). The project manager
should be able to complete all the works about the documents from the side of the vendor and
the organisation with proper evaluation of the documents with proper techniques for selecting
the vendors and also evaluating the deliverables as per the contract made.
The complexity of the project and the challenges faced in terms of contracts and
procurement management over the full life-cycle of the project
Understanding the IT security and the outplacement of the firm is a complex process.
Most importantly, find in out the certification of the positions of the people in the
organisation and also certifying the information security manager to clarify the information
ā This is a preview!ā
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3PROCUREMENT AND CONTRACTS: ASSESSMENT 3
assurance for the entire organisation, which is related to sporting events needs to be done in
such a way that the procurement management program mitigates all the potential risks that
might occur (Pheng, 2018). The full life cycle of the project procurement plan firstly needs
recognition so that the business understands how the information security management is
required within the organisation and all the employees need to understand its internal and
external sources. next the business procurement plan would identify the specific means that
the organisation would require along with the rules and regulation as per the legislative
measures of the country in which the organisation is settled in, that is Australia. The options
for the sources also need to be required in this manner in the next stage since the single
source cannot be used and drained out for the procurement management, therefore it is
required that more vendors are contracted to find out what the probability of the resources
can be provided (Peltier, 2016). After the sources are determined, the price and contract need
to be set with the people associated with the supply chain management and organisation after
which the purchase order need to be made next. The delivery, expecting and documentation
off the inspection of purchase is need to be done as the last leg of the procedure along with
the inspection of the receipts that has been exchanged throughout the supply chain
management for the development of the English National Stadium Project at Wembley.
assurance for the entire organisation, which is related to sporting events needs to be done in
such a way that the procurement management program mitigates all the potential risks that
might occur (Pheng, 2018). The full life cycle of the project procurement plan firstly needs
recognition so that the business understands how the information security management is
required within the organisation and all the employees need to understand its internal and
external sources. next the business procurement plan would identify the specific means that
the organisation would require along with the rules and regulation as per the legislative
measures of the country in which the organisation is settled in, that is Australia. The options
for the sources also need to be required in this manner in the next stage since the single
source cannot be used and drained out for the procurement management, therefore it is
required that more vendors are contracted to find out what the probability of the resources
can be provided (Peltier, 2016). After the sources are determined, the price and contract need
to be set with the people associated with the supply chain management and organisation after
which the purchase order need to be made next. The delivery, expecting and documentation
off the inspection of purchase is need to be done as the last leg of the procedure along with
the inspection of the receipts that has been exchanged throughout the supply chain
management for the development of the English National Stadium Project at Wembley.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4PROCUREMENT AND CONTRACTS: ASSESSMENT 3
References
Panda, P., & Sahu, G. P. (2015). Electronic government procurement implementation in
India: a cross sectional study. IJBIS, 18(1), 1-25.
Peltier, T. R. (2016). Information Security Policies, Procedures, and Standards: guidelines
for effective information security management. Auerbach Publications.
Pheng, L. S. (2018). Project Procurement Management. In Project Management for the Built
Environment (pp. 177-193). Springer, Singapore.
Sanghera, P. (2019). Project Procurement Management. In CAPMĀ® in Depth (pp. 469-500).
Apress, Berkeley, CA.
References
Panda, P., & Sahu, G. P. (2015). Electronic government procurement implementation in
India: a cross sectional study. IJBIS, 18(1), 1-25.
Peltier, T. R. (2016). Information Security Policies, Procedures, and Standards: guidelines
for effective information security management. Auerbach Publications.
Pheng, L. S. (2018). Project Procurement Management. In Project Management for the Built
Environment (pp. 177-193). Springer, Singapore.
Sanghera, P. (2019). Project Procurement Management. In CAPMĀ® in Depth (pp. 469-500).
Apress, Berkeley, CA.
1 out of 5
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
Ā +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright Ā© 2020ā2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.