This report documents Work Package 1 of a project titled 'Our Language is Important,' which aims to integrate indigenous languages into university signage. The report includes a signature block with project team details, project descriptions outlining the revision of sign boards with indigenous language, and joint agreements specifying costs, start and end dates, and key milestones. It outlines tolerances for cost and time, reporting arrangements including report frequency and content, and problem-handling procedures. References to the project charter are provided, and the approval methods are detailed. The report also includes a bibliography of related works. The project involves collaboration with fluent speakers of the indigenous language to accurately translate and replace existing signage information. The maintenance and operation of the project involve collaboration with the NAIDOC committee. The project is managed within a budget of $150 and a timeframe of 5 days, with weekly reports detailing progress and any changes to the plan. Problems encountered, particularly regarding the limited use of some indigenous languages, are addressed through escalation to the team leader and documentation in a risk register.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: WORK PACKAGE
Project Name: Our language is important
Name of the Student:
Name of the University:
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1
WORK PACKAGE
Table of Contents
1. Work Package..............................................................................................................................2
1.1. Signature Block....................................................................................................................2
1.2. Descriptions..........................................................................................................................2
1.3. Joint Agreements..................................................................................................................3
1.4. Tolerances.............................................................................................................................4
1.5. Reporting Arrangements.......................................................................................................4
1.6. Problem Handling and Escalation........................................................................................4
1.7. Extracts or References..........................................................................................................4
1.8. Approval Methods................................................................................................................5
Bibliography....................................................................................................................................6
Document Page
2
WORK PACKAGE
1. Work Package
1.1. Signature Block
Project Manager Name Role Organization
Ethan Dods Project Manager NAIDOC Committee
Signature: Ethan Dods Date: 06/09/2017
Work Package Team
Leader
Name Role Organization
Emma Rubensohn Team Leader University
Signature: Emma Rubensohn Date: 06/09/2017
1.2. Descriptions
Project Name: Our Language is Important
Work package ID: 2.2.1.
Work package name: Revise the sign boards with indigenous language
Work package
description:
The project for “our language is important is aimed at including the
indigenous language in the university sign board. In this particular work
package, the existing sign boards are revised with additional description
of the message written in indigenous language.
Person authorized: The team members associated with the project are authorised for making
the change in an efficient and accurate manner.
Techniques, Processes For this work package the workers collaborate with the fluent speakers of
Document Page
3
WORK PACKAGE
and Procedures the indigenous language. Based on the dialect and information obtained
from the fluent speakers, the existing information of the sign boards are
replaced with the indigenous language.
Development Interfaces Sign Boards
Operations and
Maintenance Interfaces
For the maintenance and operations of the undertaken project the
university authorities have collaborated with the NAIDOC committee.
Configuration
Management
Requirements
Revision of the exiting sign boards and campus signs are revised with the
different indigenous languages for the undertaken project.
1.3. Joint Agreements
Cost $ 150
Start Date 1st October 2017
End Date 5th October 2017
Key Milestone For the completion of this particular work packages, all the sign boards and
campus signs that are present at the university campus are replaced by with
the indigenous language.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4
WORK PACKAGE
1.4. Tolerances
Cost Tolerance The replace of the campus sign and revision of the board writings are
completed within the allocated budget of $150.
Time Tolerance The replace of the campus sign and revision of the board writings are
completed within the allocated time of 5 days.
1.5. Reporting Arrangements
Frequency of reports The reports for completion and planning of this particular work
package are provided in a weekly basis.
Content of checkpoint report The checkpoint report includes the changes and modification made
in the plan for replacing the existing campus signs with the
indigenous language. Further, the report also includes the plan,
schedule, cost allocated, persons responsible for completion of the
campus signs.
1.6. Problem Handling and Escalation
Problems are faced while changing the campus signs to indigenous language. Most of the
indigenous language languages are very less used. Therefore, while translating the sign boards to
indigenous language the team members have faced significant issues. For handing the escalation
and problem, the team members escalate the issue to the team leader. Furthermore, the issue
would be recorded in the risk register for mitigation.
Document Page
5
WORK PACKAGE
1.7. Extracts or References
The project charter is used for references.
1.8. Approval Methods
Work Package Name Replace the campus sign boards with indigenous signs at university
Modification Made Changes in the plan and sign board language
Changes Cause Very few language are used and followed in the university
Authorized Persons Project Manager
Date 16/09/2017
Signature Ethan Dods
Document Page
6
WORK PACKAGE
Bibliography
Kenter, J., Reed, M. S., Irvine, K., O'Brien, L., Brady, E., Bryce, R., ... & Fazey, I. (2014). UK
National Ecosystem Assessment Follow-on. Work Package 6: Shared, plural and cultural
values of ecosystems.
Olsen, S. H., Nilsen, H., Larssen, K., Svalheim, R. A., & Midling, K. Ø. (2016). CRISP Work
Package 5-Top quality trawl captured fish.
Van Der Zee, S., Strak, M., Smallbone, K., Benson, S., Wyche, K., Staelens, J., & Stranger, M.
(2015). JOAQUIN-Joint Air Quality Initiative Work Package 2-Action 8 Reducing public
exposure to indoor air pollution: Assessing the effectiveness of air filtration systems on
health-relevant pollutants in schools. Final Report.
Wittchen, H. U., Knappe, S., & Schumann, G. (2014). The psychological perspective on mental
health and mental disorder research: introduction to the ROAMER work package 5
consensus document. International journal of methods in psychiatric research, 23(S1),
15-27.
chevron_up_icon
1 out of 7
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]