Designing Android and IOS Application Project for US Bank
VerifiedAdded on 2023/01/18
|11
|1378
|74
Project
AI Summary
This project management assignment focuses on the design and development of a mobile application for a US bank, aiming to enhance customer service and retention. The project outlines the scope, which includes developing both Android and iOS applications, along with the project's goals, which is to provide 24/7 service and increase customer satisfaction. The document includes a detailed project charter, defining the problem statement, project goals, performance metrics, and team members. It also presents product acceptance criteria, including security, backup systems, and user acceptance testing. Furthermore, the project incorporates a Gantt chart detailing the project schedule, task durations, and dependencies, and a milestone schedule for tracking key deliverables. The project also addresses constraints and assumptions related to resources and budget, and concludes with a bibliography of referenced sources. The project aims to increase customer satisfaction and retention and establish a competitive edge in the financial sector. The project also contains a detailed project schedule for developing the application and all the milestones that are involved in the developing the application.

Running head: PROJECT MANAGEMENT
Operation Management
Name of student-
Name of University
Author’s Note-
Operation Management
Name of student-
Name of University
Author’s Note-
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1OPERATION MANAGEMENT
Table of Contents
Project Title:....................................................................................................................................1
1. Scope of the Project.....................................................................................................................1
Product Acceptance Criteria............................................................................................................2
Project Constraints and Assumptions..............................................................................................3
2. Gantt Chart...................................................................................................................................4
3. Milestone Schedule......................................................................................................................6
Bibliography....................................................................................................................................9
Table of Contents
Project Title:....................................................................................................................................1
1. Scope of the Project.....................................................................................................................1
Product Acceptance Criteria............................................................................................................2
Project Constraints and Assumptions..............................................................................................3
2. Gantt Chart...................................................................................................................................4
3. Milestone Schedule......................................................................................................................6
Bibliography....................................................................................................................................9

2OPERATION MANAGEMENT
Project Title: Designing a new android and IOS application for bank in US.
1. Scope of the Project
The scope of the project is to design a mobile android and IOS application for the
customer of a bank in US. The project goal is to develop a application that would help the
customers of the bank as well as the employees and administration of the bank to have an user
friendly transaction and delivers a service of 24 * 7. The main goal of the project is to increase
their customer retention and establish a competition in the financial sector. The project will
deliver the requirements that will be needed for developing the mobile application. The
assumptions that are taken for documenting this project are also stated in this project. This
project also contains a detailed project schedule for developing the application and all the
milestones that are involved in the developing the application.
The project is aiming to develop an android application for a bank in US. This project
will help to increase the customer satisfaction within the bank and increase the profit of the bank.
Project Charter:
Project name: Development of Mobile
application
Problem Statement:
The problem that this project will address is
making the customer service smooth in the
bank.
Project Goal:
The goal of the project is to develop an
application for the bank that will increase
their customer retention and provide service
to their customer all 24 * 7.
Project Performance: Scope:
Project Title: Designing a new android and IOS application for bank in US.
1. Scope of the Project
The scope of the project is to design a mobile android and IOS application for the
customer of a bank in US. The project goal is to develop a application that would help the
customers of the bank as well as the employees and administration of the bank to have an user
friendly transaction and delivers a service of 24 * 7. The main goal of the project is to increase
their customer retention and establish a competition in the financial sector. The project will
deliver the requirements that will be needed for developing the mobile application. The
assumptions that are taken for documenting this project are also stated in this project. This
project also contains a detailed project schedule for developing the application and all the
milestones that are involved in the developing the application.
The project is aiming to develop an android application for a bank in US. This project
will help to increase the customer satisfaction within the bank and increase the profit of the bank.
Project Charter:
Project name: Development of Mobile
application
Problem Statement:
The problem that this project will address is
making the customer service smooth in the
bank.
Project Goal:
The goal of the project is to develop an
application for the bank that will increase
their customer retention and provide service
to their customer all 24 * 7.
Project Performance: Scope:
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3OPERATION MANAGEMENT
This project will provide a schedule for
developing the mobile application for the
bank.
The scope of the project is to design a mobile
android and IOS application for the customer
of a bank in US.
Team Members:
The team that will be required for developing
this project is project manager, procurement
manager, financial manager, designer, Quality
analyst, system developer, and programmer.
Benefits:
The benefits of the project will be completing
the project in time and maintaining a schedule
and budget for project completion.
Timeline:
The quantifiable criteria that are to be fulfilled while accomplishing this project are
maintaining the project schedule, the cost of the project that is being developed as well as the
quality of the application should meet the requirements of the customers.
Product Acceptance Criteria
The project acceptance criteria denotes the performance requirement of the project as
well as all the conditions that are required to complete this project successfully (Badewi, 2016).
The acceptance criteria for this application is that the mobile application should be secured as it
will deal with the bank account details of the customer and will have all other personal details of
the customer. The system should have a backup as well as restore testing before successful
completion of the project. The application also go through user acceptance testing before
This project will provide a schedule for
developing the mobile application for the
bank.
The scope of the project is to design a mobile
android and IOS application for the customer
of a bank in US.
Team Members:
The team that will be required for developing
this project is project manager, procurement
manager, financial manager, designer, Quality
analyst, system developer, and programmer.
Benefits:
The benefits of the project will be completing
the project in time and maintaining a schedule
and budget for project completion.
Timeline:
The quantifiable criteria that are to be fulfilled while accomplishing this project are
maintaining the project schedule, the cost of the project that is being developed as well as the
quality of the application should meet the requirements of the customers.
Product Acceptance Criteria
The project acceptance criteria denotes the performance requirement of the project as
well as all the conditions that are required to complete this project successfully (Badewi, 2016).
The acceptance criteria for this application is that the mobile application should be secured as it
will deal with the bank account details of the customer and will have all other personal details of
the customer. The system should have a backup as well as restore testing before successful
completion of the project. The application also go through user acceptance testing before
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4OPERATION MANAGEMENT
launching the application. The scope of the project is also rechecked before delivering the project
to the bank.
The checklist that will be used by the bank owner before getting the project delivered are
stated below:
Criteria YES NO
Checking the user interface
Check the security of
application
Checking page links in the
application
Checking all the links in the
application
Checking the objective of the
project
Validation check
Backup Plan
Project Constraints and Assumptions
The project constraints and assumptions that are to be maintained in a project are
maintaining the project schedule and project cost that are defined for developing the application
(Carstens, Richardson & Smith, 2016).
launching the application. The scope of the project is also rechecked before delivering the project
to the bank.
The checklist that will be used by the bank owner before getting the project delivered are
stated below:
Criteria YES NO
Checking the user interface
Check the security of
application
Checking page links in the
application
Checking all the links in the
application
Checking the objective of the
project
Validation check
Backup Plan
Project Constraints and Assumptions
The project constraints and assumptions that are to be maintained in a project are
maintaining the project schedule and project cost that are defined for developing the application
(Carstens, Richardson & Smith, 2016).

5OPERATION MANAGEMENT
Project assumption that are taken for this project is assuming human resources to be
involved in the project and the constraints satisfies the project budget and schedule.
2. Gantt Chart
Descriptions Duration Start Finish Predecessors
Mobile application 130 days Mon 6/05/19 Fri 1/11/19
Project management 5 days Mon 6/05/19 Fri 10/05/19
Planning the project 1 day Mon 6/05/19 Mon 6/05/19
Preparing cost and schedule 2 days Tue 7/05/19 Wed 8/05/19 2
Scope management 2 days Thu 9/05/19 Fri 10/05/19 3
Task management 0 days Fri 10/05/19 Fri 10/05/19 4
Project Communications 0 days Fri 10/05/19 Fri 10/05/19 5
Risk management 0 days Fri 10/05/19 Fri 10/05/19 6
Procurement Management 0 days Fri 10/05/19 Fri 10/05/19 7
Quality Management 0 days Fri 10/05/19 Fri 10/05/19 8
System Engineering 18 days Mon 13/05/19 Wed 5/06/19
Technical Planning 4 days Mon 13/05/19 Thu 16/05/19 9
Project assumption that are taken for this project is assuming human resources to be
involved in the project and the constraints satisfies the project budget and schedule.
2. Gantt Chart
Descriptions Duration Start Finish Predecessors
Mobile application 130 days Mon 6/05/19 Fri 1/11/19
Project management 5 days Mon 6/05/19 Fri 10/05/19
Planning the project 1 day Mon 6/05/19 Mon 6/05/19
Preparing cost and schedule 2 days Tue 7/05/19 Wed 8/05/19 2
Scope management 2 days Thu 9/05/19 Fri 10/05/19 3
Task management 0 days Fri 10/05/19 Fri 10/05/19 4
Project Communications 0 days Fri 10/05/19 Fri 10/05/19 5
Risk management 0 days Fri 10/05/19 Fri 10/05/19 6
Procurement Management 0 days Fri 10/05/19 Fri 10/05/19 7
Quality Management 0 days Fri 10/05/19 Fri 10/05/19 8
System Engineering 18 days Mon 13/05/19 Wed 5/06/19
Technical Planning 4 days Mon 13/05/19 Thu 16/05/19 9
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6OPERATION MANAGEMENT
Defining the Business
requirements
5 days Fri 17/05/19 Thu 23/05/19 11
Designing system architecture 9 days Fri 24/05/19 Wed 5/06/19 12
Software 70 days Thu 6/06/19 Wed 11/09/19
Software Design 11 days Thu 6/06/19 Thu 20/06/19
Requirement of software 2 days Thu 6/06/19 Fri 7/06/19 13
Software Prototyping 9 days Mon 10/06/19 Thu 20/06/19 16
Software Build 35 days Fri 21/06/19 Thu 8/08/19
Coding for each unit 15 days Fri 21/06/19 Thu 11/07/19 17
Unit debugging of software 20 days Fri 12/07/19 Thu 8/08/19 19
Unit Testing 24 days Fri 9/08/19 Wed 11/09/19
Planning the Unit Testing 12 days Fri 9/08/19 Mon 26/08/19 20
Recording the unit Testing 12 days Tue 27/08/19 Wed 11/09/19 22
System testing 25 days Thu 12/09/19 Wed 16/10/19
Testing the module subsystem 15 days Thu 12/09/19 Wed 2/10/19 23
Testing the integration testing 10 days Thu 3/10/19 Wed 16/10/19 25
Acceptance testing 0 days Wed 16/10/19 Wed 16/10/19 26
Defining the Business
requirements
5 days Fri 17/05/19 Thu 23/05/19 11
Designing system architecture 9 days Fri 24/05/19 Wed 5/06/19 12
Software 70 days Thu 6/06/19 Wed 11/09/19
Software Design 11 days Thu 6/06/19 Thu 20/06/19
Requirement of software 2 days Thu 6/06/19 Fri 7/06/19 13
Software Prototyping 9 days Mon 10/06/19 Thu 20/06/19 16
Software Build 35 days Fri 21/06/19 Thu 8/08/19
Coding for each unit 15 days Fri 21/06/19 Thu 11/07/19 17
Unit debugging of software 20 days Fri 12/07/19 Thu 8/08/19 19
Unit Testing 24 days Fri 9/08/19 Wed 11/09/19
Planning the Unit Testing 12 days Fri 9/08/19 Mon 26/08/19 20
Recording the unit Testing 12 days Tue 27/08/19 Wed 11/09/19 22
System testing 25 days Thu 12/09/19 Wed 16/10/19
Testing the module subsystem 15 days Thu 12/09/19 Wed 2/10/19 23
Testing the integration testing 10 days Thu 3/10/19 Wed 16/10/19 25
Acceptance testing 0 days Wed 16/10/19 Wed 16/10/19 26
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7OPERATION MANAGEMENT
Installation 11 days Thu 17/10/19 Thu 31/10/19
Planning the Installation 5 days Thu 17/10/19 Wed 23/10/19 27
Use Comunication and training 4 days Thu 24/10/19 Tue 29/10/19 29
Managing the installation 0 days Tue 29/10/19 Tue 29/10/19 30
Performance Monitoring 2 days Wed 30/10/19 Thu 31/10/19 31
Project Closure 1 day Fri 1/11/19 Fri 1/11/19
Checklist the project deliverables 1 day Fri 1/11/19 Fri 1/11/19 32
Project Delivery 0 days Fri 1/11/19 Fri 1/11/19 34
Project Sign off 0 days Fri 1/11/19 Fri 1/11/19 35
3. Milestone Schedule
Task Name Duration Start Finish
Task management 0 days Fri 10/05/19 Fri 10/05/19
Project Communications 0 days Fri 10/05/19 Fri 10/05/19
Risk management 0 days Fri 10/05/19 Fri 10/05/19
Procurement Management 0 days Fri 10/05/19 Fri 10/05/19
Installation 11 days Thu 17/10/19 Thu 31/10/19
Planning the Installation 5 days Thu 17/10/19 Wed 23/10/19 27
Use Comunication and training 4 days Thu 24/10/19 Tue 29/10/19 29
Managing the installation 0 days Tue 29/10/19 Tue 29/10/19 30
Performance Monitoring 2 days Wed 30/10/19 Thu 31/10/19 31
Project Closure 1 day Fri 1/11/19 Fri 1/11/19
Checklist the project deliverables 1 day Fri 1/11/19 Fri 1/11/19 32
Project Delivery 0 days Fri 1/11/19 Fri 1/11/19 34
Project Sign off 0 days Fri 1/11/19 Fri 1/11/19 35
3. Milestone Schedule
Task Name Duration Start Finish
Task management 0 days Fri 10/05/19 Fri 10/05/19
Project Communications 0 days Fri 10/05/19 Fri 10/05/19
Risk management 0 days Fri 10/05/19 Fri 10/05/19
Procurement Management 0 days Fri 10/05/19 Fri 10/05/19

8OPERATION MANAGEMENT
Quality Management 0 days Fri 10/05/19 Fri 10/05/19
Acceptance testing 0 days Wed 16/10/19 Wed 16/10/19
Managing the installation 0 days Tue 29/10/19 Tue 29/10/19
Project Delivery 0 days Fri 1/11/19 Fri 1/11/19
Project Sign off 0 days Fri 1/11/19 Fri 1/11/19
Quality Management 0 days Fri 10/05/19 Fri 10/05/19
Acceptance testing 0 days Wed 16/10/19 Wed 16/10/19
Managing the installation 0 days Tue 29/10/19 Tue 29/10/19
Project Delivery 0 days Fri 1/11/19 Fri 1/11/19
Project Sign off 0 days Fri 1/11/19 Fri 1/11/19
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9OPERATION MANAGEMENT
Project Critical Path
Project Critical Path
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10OPERATION MANAGEMENT
Bibliography
Badewi, A. (2016). The impact of project management (PM) and benefits management (BM)
practices on project success: Towards developing a project benefits governance
framework. International Journal of Project Management, 34(4), 761-778.
Carstens, D. S., Richardson, G. L., & Smith, R. B. (2016). Project management tools and
techniques: A practical guide. CRC Press.
Kumaraswamy, M., Mahesh, G., Mahalingam, A., Loganathan, S., & Kalidindi, S. N. (2017).
Developing a clients’ charter and construction project KPIs to direct and drive industry
improvements. Built Environment Project and Asset Management, 7(3), 253-270.
Salmon, M. W., Kosbab, B. D., Coleman, J., & Trujillo, I. E. (2019). PF-4 Seismic Performance
Reassessment, Los Alamos National Laboratory, Project Charter and Integrated Project
Team (No. LA-UR-19-20688). Los Alamos National Lab.(LANL), Los Alamos, NM
(United States).
Bibliography
Badewi, A. (2016). The impact of project management (PM) and benefits management (BM)
practices on project success: Towards developing a project benefits governance
framework. International Journal of Project Management, 34(4), 761-778.
Carstens, D. S., Richardson, G. L., & Smith, R. B. (2016). Project management tools and
techniques: A practical guide. CRC Press.
Kumaraswamy, M., Mahesh, G., Mahalingam, A., Loganathan, S., & Kalidindi, S. N. (2017).
Developing a clients’ charter and construction project KPIs to direct and drive industry
improvements. Built Environment Project and Asset Management, 7(3), 253-270.
Salmon, M. W., Kosbab, B. D., Coleman, J., & Trujillo, I. E. (2019). PF-4 Seismic Performance
Reassessment, Los Alamos National Laboratory, Project Charter and Integrated Project
Team (No. LA-UR-19-20688). Los Alamos National Lab.(LANL), Los Alamos, NM
(United States).
1 out of 11
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2026 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.