This project proposal outlines the development of an AI-driven education management system tailored for maths education, specifically targeting students up to class 8. The proposal addresses the challenges students face in maths, including enrolment difficulties and understanding complex concepts. The system aims to provide a user-friendly online platform with features such as animation videos, assessment tools, worksheets, and adaptive testing modules to enhance the learning experience. It includes a detailed use case description, analysis of existing solutions, advantages of the proposed system, project scope, requirement analysis, market partnership strategies, key project dates, resource management plans, and a financial analysis including the payback period. The proposal emphasizes the system's potential to improve student learning, address communication gaps, and provide support for both students and their guardians. The project's success depends on the collaboration of internal and external stakeholders. The software is designed to be easily accessible, addressing the limitations of existing systems, and offering features that promote student engagement and understanding of mathematical concepts.

Running head: EDUCATION MANAGEMENT SYSTEM FOR MATHS CLASSES
Education management system for Maths classes
Name of the Student
Name of the University
Author Note
Education management system for Maths classes
Name of the Student
Name of the University
Author Note
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1EDUCATION MANAGEMENT SYSTEM FOR MATHS CLASSES
Table of Contents
1. Executive Summary...............................................................................................................3
2. Project background.................................................................................................................4
3. Project Definition...................................................................................................................4
3.1 Objectives of the project..................................................................................................4
3.2 Proposed system use case.................................................................................................4
3.3 Existing solutions and competition..................................................................................6
3.4 Advantages of the proposed solution...............................................................................6
3.5 Project scope....................................................................................................................7
3.6 Requirement analysis.......................................................................................................7
3.7 Market Partnership...........................................................................................................8
3.8 Project key dates and milestones......................................................................................8
3.9 Project operating mechanisms..........................................................................................8
3.10 Project Timeline and schedule.......................................................................................9
3.10.1 Work Breakdown structure.......................................................................................10
3.11 Knowledge database and machine learning algorithm.................................................10
3.12 Delivery of the product and product development.......................................................15
3.13 Customer Retention......................................................................................................16
3.14 Resource management plan..........................................................................................16
3.15 Cost of the equipment..................................................................................................18
3.17 Payback period.............................................................................................................19
3.8 Assumptions and risks of the project.............................................................................20
3.9 Risk mitigation strategy.................................................................................................20
4. Conclusion............................................................................................................................21
5. References............................................................................................................................22
Table of Contents
1. Executive Summary...............................................................................................................3
2. Project background.................................................................................................................4
3. Project Definition...................................................................................................................4
3.1 Objectives of the project..................................................................................................4
3.2 Proposed system use case.................................................................................................4
3.3 Existing solutions and competition..................................................................................6
3.4 Advantages of the proposed solution...............................................................................6
3.5 Project scope....................................................................................................................7
3.6 Requirement analysis.......................................................................................................7
3.7 Market Partnership...........................................................................................................8
3.8 Project key dates and milestones......................................................................................8
3.9 Project operating mechanisms..........................................................................................8
3.10 Project Timeline and schedule.......................................................................................9
3.10.1 Work Breakdown structure.......................................................................................10
3.11 Knowledge database and machine learning algorithm.................................................10
3.12 Delivery of the product and product development.......................................................15
3.13 Customer Retention......................................................................................................16
3.14 Resource management plan..........................................................................................16
3.15 Cost of the equipment..................................................................................................18
3.17 Payback period.............................................................................................................19
3.8 Assumptions and risks of the project.............................................................................20
3.9 Risk mitigation strategy.................................................................................................20
4. Conclusion............................................................................................................................21
5. References............................................................................................................................22

2EDUCATION MANAGEMENT SYSTEM FOR MATHS CLASSES
1. Executive Summary
Business proposals can be defined as the written document which are sent to
prospective client in order to obtain a specific job. The content of the business proposals must
be very much well defined and must be having limited activities. The content of business
proposals must include detailed description of the project, along with the time and cost
required for each of the activities of this project. The detailed discussion of the return of
investment is discussed in the business proposals so that the investors can decide about their
investment prospects in the project. The communication plan for each of the stakeholders
involved in the project as well as the risk mitigation strategies are the prime aspects of the
business proposals. Scheduling of each of the activities in the project is generally illustrated
in the business proposals. Thus, every minute details of the project can be understood by a
potential investor from a business proposal.
The prime objective of this project is the development of a user friendly online
education management system from where students up to class 8 can get their maths lessons.
This project shall require the support from both the internal and external stakeholders, the
internal stakeholders shall be making the entire plan of this project in the documentation and
the external stakeholders like designers and developers will be working to develop the
system.
One of the most essential segment of this project is the detailed discussion of the
contractual agreements required for each of the external stakeholders, description of the
entire procedure using the use case description, advantages of using the new software, scope
of the software, significance of the knowledge and machine learning algorithm, payback
period of the project. It is very much essential to say that the payback period of this project
will be very much low as compared with the other projects and also from the social
1. Executive Summary
Business proposals can be defined as the written document which are sent to
prospective client in order to obtain a specific job. The content of the business proposals must
be very much well defined and must be having limited activities. The content of business
proposals must include detailed description of the project, along with the time and cost
required for each of the activities of this project. The detailed discussion of the return of
investment is discussed in the business proposals so that the investors can decide about their
investment prospects in the project. The communication plan for each of the stakeholders
involved in the project as well as the risk mitigation strategies are the prime aspects of the
business proposals. Scheduling of each of the activities in the project is generally illustrated
in the business proposals. Thus, every minute details of the project can be understood by a
potential investor from a business proposal.
The prime objective of this project is the development of a user friendly online
education management system from where students up to class 8 can get their maths lessons.
This project shall require the support from both the internal and external stakeholders, the
internal stakeholders shall be making the entire plan of this project in the documentation and
the external stakeholders like designers and developers will be working to develop the
system.
One of the most essential segment of this project is the detailed discussion of the
contractual agreements required for each of the external stakeholders, description of the
entire procedure using the use case description, advantages of using the new software, scope
of the software, significance of the knowledge and machine learning algorithm, payback
period of the project. It is very much essential to say that the payback period of this project
will be very much low as compared with the other projects and also from the social
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3EDUCATION MANAGEMENT SYSTEM FOR MATHS CLASSES
perspective it can be said that this software can be very much useful for the younger child to
understand the concepts of mathematics in a more detailed manner. Thus, this user friendly
education management system will be very much useful for both the guardians as well as the
students to understand the enrolment procedure and get access to the learning material for this
particular subject.
2. Project background
There are different categories of challenges which are faced by the younger students
especially in the subject of maths in terms of the difficulties of the enrolment procedure and
getting the quick updates. Some of the students faces huge difficulties to understand their
maths lessons in the classes, thus this education management system will be very much
useful for them to study their maths lessons from their home. It can be said that most of the
wrong assumptions of the students mostly about the complexity of this subject can be
addressed using this education management system. Expressing individual concerns to the
lecturers is one of the most challenges faced by young maths students [35]. The learning
abilities of the younger students are sometimes restricted due to the protocols and the
regulations which are practised in schools [2]. Apart from that, huge pressure are felt by the
school students in order to complete their maths assignments and the maths projects. There
are huge communication gaps between the younger maths students and maths teachers [1].
Thus, this business proposal will be very much significant for the investors of this project to
understand that this project has a lot of social value as it can help the younger students to
understand maths from different perspectives which are not discussed in the classrooms.
Most of the challenges faced by the guardians of the younger students as they cannot
understand the maths modules which are taught in the classrooms. The difficulties of the
perspective it can be said that this software can be very much useful for the younger child to
understand the concepts of mathematics in a more detailed manner. Thus, this user friendly
education management system will be very much useful for both the guardians as well as the
students to understand the enrolment procedure and get access to the learning material for this
particular subject.
2. Project background
There are different categories of challenges which are faced by the younger students
especially in the subject of maths in terms of the difficulties of the enrolment procedure and
getting the quick updates. Some of the students faces huge difficulties to understand their
maths lessons in the classes, thus this education management system will be very much
useful for them to study their maths lessons from their home. It can be said that most of the
wrong assumptions of the students mostly about the complexity of this subject can be
addressed using this education management system. Expressing individual concerns to the
lecturers is one of the most challenges faced by young maths students [35]. The learning
abilities of the younger students are sometimes restricted due to the protocols and the
regulations which are practised in schools [2]. Apart from that, huge pressure are felt by the
school students in order to complete their maths assignments and the maths projects. There
are huge communication gaps between the younger maths students and maths teachers [1].
Thus, this business proposal will be very much significant for the investors of this project to
understand that this project has a lot of social value as it can help the younger students to
understand maths from different perspectives which are not discussed in the classrooms.
Most of the challenges faced by the guardians of the younger students as they cannot
understand the maths modules which are taught in the classrooms. The difficulties of the
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4EDUCATION MANAGEMENT SYSTEM FOR MATHS CLASSES
other education management system in terms of the navigation issues can also be addressed
in this education management system.
3. Project Definition
3.1 Objectives of the project
The objectives of the project are listed as followings:
The prime objectives of this project to create a user friendly education management
system for the students up to class 8.
To help the guardian of the younger students in the enrolment procedure for the online
maths courses.
To help the students of class 8 to solve the complexities of maths.
3.2 Proposed system use case
The responsibilities of each of the actors associated with this education management
system can be identified from the below use case diagram. This is one of the most significant
segment of this business proposal as the investors can get a detailed understanding about the
functionalities of this education management system from this use case description [34]. The
three different internal stakeholders which is associated with this system are student, course
coordinator and admin [3]. It can be said that the functionalities of each of the three actors
are very much depended from each other and the success of this system will depend upon the
effort put by each of the three actors.
other education management system in terms of the navigation issues can also be addressed
in this education management system.
3. Project Definition
3.1 Objectives of the project
The objectives of the project are listed as followings:
The prime objectives of this project to create a user friendly education management
system for the students up to class 8.
To help the guardian of the younger students in the enrolment procedure for the online
maths courses.
To help the students of class 8 to solve the complexities of maths.
3.2 Proposed system use case
The responsibilities of each of the actors associated with this education management
system can be identified from the below use case diagram. This is one of the most significant
segment of this business proposal as the investors can get a detailed understanding about the
functionalities of this education management system from this use case description [34]. The
three different internal stakeholders which is associated with this system are student, course
coordinator and admin [3]. It can be said that the functionalities of each of the three actors
are very much depended from each other and the success of this system will depend upon the
effort put by each of the three actors.

5EDUCATION MANAGEMENT SYSTEM FOR MATHS CLASSES
Figure 1: Use case description of the education management system
(Source: Created by the author)
3.3 Existing solutions and competition
There are very less maths-related educational software which is readily available for
the junior classes, thus the development of this education management system can be very
much useful in our society [33]. The needs and concerns of each of students can be addressed
from the online resources which will be provided from this education management system.
Most of the education management system for the juniors which exists in the market
is not very much user friendly in nature thus this software has to be designed in such a way so
Figure 1: Use case description of the education management system
(Source: Created by the author)
3.3 Existing solutions and competition
There are very less maths-related educational software which is readily available for
the junior classes, thus the development of this education management system can be very
much useful in our society [33]. The needs and concerns of each of students can be addressed
from the online resources which will be provided from this education management system.
Most of the education management system for the juniors which exists in the market
is not very much user friendly in nature thus this software has to be designed in such a way so
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6EDUCATION MANAGEMENT SYSTEM FOR MATHS CLASSES
that both the parents as well as the young students can access their personal account in the
education management system and get the solutions of their mathematical problems.
This software shall be providing a wide range of services in terms of the animation
videos, different categories of assessment tools and different types of assignments.
Worksheets will be provided to the young students so that can develop their learning skills
[4]. The other feature of this software which can provide a competitive advantage to this
business are the charts, models, flash cards, bulletins and PowerPoint presentations.
The other important feature of this software is the adaptive testing modules which can
be very much useful to engage the younger students of the society [32]. The difficulties as
well as the complexities faced by the younger students in maths shall be addressed if this
software is used [31]. Chapter wise test and detailed feedback of the tests is very much
beneficial for the students to understand the areas which they lack for this particular subject.
3.4 Advantages of the proposed solution
The learning procedure for younger students can be enhanced in the first place using
this education management system [3]. The system thinking procedure regarding this subject
can be much easier after the incorporation of the education management system. At the same
time, it can be said that existing career opportunities in the field of maths can also be
identified in the first place if this software is exposed to the students. The entire learning
procedure for the younger students enhanced in the first place after the introduction of this
education management system. Accessibility to the learning materials shall be improved after
the introduction of this system. The progress of the learners and tracking the performance of
the younger students are the other advantages associated with this system.
that both the parents as well as the young students can access their personal account in the
education management system and get the solutions of their mathematical problems.
This software shall be providing a wide range of services in terms of the animation
videos, different categories of assessment tools and different types of assignments.
Worksheets will be provided to the young students so that can develop their learning skills
[4]. The other feature of this software which can provide a competitive advantage to this
business are the charts, models, flash cards, bulletins and PowerPoint presentations.
The other important feature of this software is the adaptive testing modules which can
be very much useful to engage the younger students of the society [32]. The difficulties as
well as the complexities faced by the younger students in maths shall be addressed if this
software is used [31]. Chapter wise test and detailed feedback of the tests is very much
beneficial for the students to understand the areas which they lack for this particular subject.
3.4 Advantages of the proposed solution
The learning procedure for younger students can be enhanced in the first place using
this education management system [3]. The system thinking procedure regarding this subject
can be much easier after the incorporation of the education management system. At the same
time, it can be said that existing career opportunities in the field of maths can also be
identified in the first place if this software is exposed to the students. The entire learning
procedure for the younger students enhanced in the first place after the introduction of this
education management system. Accessibility to the learning materials shall be improved after
the introduction of this system. The progress of the learners and tracking the performance of
the younger students are the other advantages associated with this system.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7EDUCATION MANAGEMENT SYSTEM FOR MATHS CLASSES
3.5 Project scope
Designing of the backend database is one of the most significant in scope activity of
this project. The entire costing plan, identification of the risks, scheduling of the project,
resources management plan, and identification of the payback period are the other in scope of
this project [5]. Designing of a communication plan which can be very much useful for each
of the stakeholders involved in this project to communicate during the project. The designing
and the development of this IT system is one of the most significant in scope of this software
development project [6]. The users of the end product of this project must be able to access to
the system from any browser or computer systems [30]. This software must be readily
available for the consumers of this business. The other in scope of this project is the
modification of the knowledge database according to the needs and expectation of the
consumers of this business. Providing customer support is the other significant out scope of
this software development project [29]. Ideas and concepts from other similar business can be
considered as the other in scope of this project. Providing live training sessions is the out
scope of this project.
3.6 Requirement analysis
Reference Detailed requirement
1 This online system must be available 24 hours without any sort of downtime
issues.
2 The enrolment procedure of this IT system must be very much user friendly
in nature.
3 This online application must be running in each of the browsers and mobile
devices.
4 This IT system should not be having any sort of compatibility issues with
each of the versions of operating systems.
5 The new system should not have any security and privacy issues.
Table 1: Requirement Analysis
(Source: Created by the author)
3.5 Project scope
Designing of the backend database is one of the most significant in scope activity of
this project. The entire costing plan, identification of the risks, scheduling of the project,
resources management plan, and identification of the payback period are the other in scope of
this project [5]. Designing of a communication plan which can be very much useful for each
of the stakeholders involved in this project to communicate during the project. The designing
and the development of this IT system is one of the most significant in scope of this software
development project [6]. The users of the end product of this project must be able to access to
the system from any browser or computer systems [30]. This software must be readily
available for the consumers of this business. The other in scope of this project is the
modification of the knowledge database according to the needs and expectation of the
consumers of this business. Providing customer support is the other significant out scope of
this software development project [29]. Ideas and concepts from other similar business can be
considered as the other in scope of this project. Providing live training sessions is the out
scope of this project.
3.6 Requirement analysis
Reference Detailed requirement
1 This online system must be available 24 hours without any sort of downtime
issues.
2 The enrolment procedure of this IT system must be very much user friendly
in nature.
3 This online application must be running in each of the browsers and mobile
devices.
4 This IT system should not be having any sort of compatibility issues with
each of the versions of operating systems.
5 The new system should not have any security and privacy issues.
Table 1: Requirement Analysis
(Source: Created by the author)

8EDUCATION MANAGEMENT SYSTEM FOR MATHS CLASSES
3.7 Market Partnership
Stronger relationship is required for each of the stakeholders involved in this software
development project. Partnering with other similar business organizations can be very much
useful in order to create a strong relationship between the consumers [28]. The reputation of
this business among the potential consumers can be one of the most significant contribution
of market partnership [7]. Promotion of online services can also be enhanced in the first place
using the concept of market partnership.
3.8 Project key dates and milestones
Maintaining the estimated schedule is very much important in this project as any sort
of changes in schedules might have a direct impact on the costs involved in this project. The
starting date of this project is 15th October 2019 and the end date of this project is 2nd March
2020. This project is expected to be completed in 100 day time and there will be 5 milestones
involved in this project. The first milestone is on 23rd October, the second milestone is on 6th
of November, the third milestone is on 19th October, the fourth milestone is on 7th of January,
the 5th and final milestone is on 13th of February.
3.9 Project operating mechanisms
Each of the activities of this project has to be monitored in the first place so that the
project completes within the estimated time period [27]. The progress of this project can be
tracked by both the investors as well as the project managers using a well-documented report
where the schedule of each of the stakeholders involved in the project will be highlighted.
Deliverable Responsibility Date of delivery
Weekly status report plan Project manager must be
playing a key role in the
weekly status reports.
28.11.2019
Project milestone reviews The role of the facility
manager and the project
manager is very much
At the end of each milestone
(Illustrated in the Gantt
chart)
3.7 Market Partnership
Stronger relationship is required for each of the stakeholders involved in this software
development project. Partnering with other similar business organizations can be very much
useful in order to create a strong relationship between the consumers [28]. The reputation of
this business among the potential consumers can be one of the most significant contribution
of market partnership [7]. Promotion of online services can also be enhanced in the first place
using the concept of market partnership.
3.8 Project key dates and milestones
Maintaining the estimated schedule is very much important in this project as any sort
of changes in schedules might have a direct impact on the costs involved in this project. The
starting date of this project is 15th October 2019 and the end date of this project is 2nd March
2020. This project is expected to be completed in 100 day time and there will be 5 milestones
involved in this project. The first milestone is on 23rd October, the second milestone is on 6th
of November, the third milestone is on 19th October, the fourth milestone is on 7th of January,
the 5th and final milestone is on 13th of February.
3.9 Project operating mechanisms
Each of the activities of this project has to be monitored in the first place so that the
project completes within the estimated time period [27]. The progress of this project can be
tracked by both the investors as well as the project managers using a well-documented report
where the schedule of each of the stakeholders involved in the project will be highlighted.
Deliverable Responsibility Date of delivery
Weekly status report plan Project manager must be
playing a key role in the
weekly status reports.
28.11.2019
Project milestone reviews The role of the facility
manager and the project
manager is very much
At the end of each milestone
(Illustrated in the Gantt
chart)
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9EDUCATION MANAGEMENT SYSTEM FOR MATHS CLASSES
important for reviewing the
project milestones.
Table 2: Delivery date of the deliverable
(Source: Created by the author)
3.10 Project Timeline and schedule
ID Outline
Number
Task
Mode
Task Name Duration Start Finish PredecessorsResource Names Cost
0 0 Development of
an education
management
system
100 days Tue
15-10-19
Mon
02-03-20
$116,200.00
1 1 Providing bank
loans
7 days Tue
15-10-19
Wed
23-10-19
$6,320.00
2 1.1 Identification
of the costs in
volved in the
project
6 days Tue
15-10-19
Tue
22-10-19
Project
manager
$4,800.00
3 1.2 Initiate the
funding
procedure
1 day Wed
23-10-19
Wed
23-10-19
2 Financial
analyst,Project
manager
$1,520.00
4 1.3 Milestone 1:
Approval of
the fund
requests
0 days Wed
23-10-19
Wed
23-10-19
3 Facility
manager,Financial
analyst,Project
manager
$0.00
5 2 Project Initiation 21 days Thu 24-10-19Thu 21-11-19 $26,280.00
6 2.1 Stakeholder
identification
9 days Thu
24-10-19
Tue
05-11-19
4 Facility
manager,Financial
analyst
$12,960.00
7 2.2 Making the
plan of the
project
8 days Wed
06-11-19
Fri
15-11-19
6 Project
manager
$6,400.00
8 2.3 Reviewing the
plan
1 day Wed
06-11-19
Wed
06-11-19
6 Strategic
planner,Tester
$760.00
9 2.4 Change
management
procedure
2 days Mon
18-11-19
Tue
19-11-19
7 Project
manager,Sale
and
marketting
$2,400.00
10 2.5 Forming the
risk
management
plan
3 days Mon
18-11-19
Wed
20-11-19
7 Facility
manager
$2,160.00
11 2.6 Making the
communication
plan
2 days Wed
20-11-19
Thu
21-11-19
7 Project
manager
$1,600.00
12 2.7 End of
milestone 2
0 days Wed
06-11-19
Wed
06-11-19
8 Project
manager
$0.00
13 3 Requirement
Documentation
20 days Fri
22-11-19
Thu
19-12-19
$28,440.00
14 3.1 Requirement
gathering
2 days Fri
22-11-19
Mon
25-11-19
9,11,10 $0.00
15 3.2 Analyzing
Requirement
2 days Tue
26-11-19
Wed
27-11-19
12,14 Designer,Developer $560.00
16 3.3 Documentation
of the entire
system
1 day Thu
28-11-19
Thu
28-11-19
15 Facility
manager,Developer
$880.00
17 3.4 Prepare
developemnt
plan
15 days Fri
29-11-19
Thu
19-12-19
16 Facility
manager,Project
manager,Designer,Developer
$27,000.00
18 3.5 End of
milestone 3
0 days Thu
19-12-19
Thu
19-12-19
17 Facility
manager,Financial
analyst
$0.00
19 4 Designing phase 13 days Fri 20-12-19Tue 07-01-20 $10,360.00
20 4.1 Requirement
gathering
1 day Fri
20-12-19
Fri
20-12-19
18 Designer,Developer,Facility
manager,Project
manager
$1,800.00
21 4.2 Design
approvals
1 day Mon
23-12-19
Mon
23-12-19
18 Designer,Developer $280.00
22 4.3 Making the
use case
descriptions
1 day Tue
24-12-19
Tue
24-12-19
20,21 Designer,Developer $280.00
23 4.4 Mockup of the
entire system
10 days Wed
25-12-19
Tue
07-01-20
22 Project
manager
$8,000.00
24 4.5 End of
milestone 4
0 days Tue
07-01-20
Tue
07-01-20
23 $0.00
25 5 Development
phase
27 days Wed
08-01-20
Thu
13-02-20
$34,720.00
26 5.1 Developing
the online
website
8 days Wed
08-01-20
Fri
17-01-20
24 Designer,Developer,Project
manager,Recruitment
team
$11,840.00
27 5.2 Database
development
10 days Mon
20-01-20
Fri
31-01-20
26 Server
team,Strategic
planner,Designer,Developer
$10,400.00
28 5.3 Identification
of the
teachers and
classes
5 days Mon
03-02-20
Fri
07-02-20
27 Developer,Facility
manager,Financial
analyst
$8,000.00
29 5.4 Development
of the
registration
process
2 days Mon
10-02-20
Tue
11-02-20
28 Designer,Project
manager,Developer
$2,160.00
30 5.5 Assigning
students in
specific
classes
2 days Wed
12-02-20
Thu
13-02-20
29 Sale and
marketting
,Server
team,Strategic
$2,320.00
31 5.6 End of
milestone 5
0 days Thu
13-02-20
Thu
13-02-20
30 Sale and
marketting
,Server
$0.00
32 6 Deployment and
service
12 days Fri
14-02-20
Mon
02-03-20
$10,080.00
33 6.1 Launching the
new system
4 days Fri
14-02-20
Wed
19-02-20
31 Project
manager,Developer,Designer
$4,320.00
34 6.2 White box
testing
5 days Fri
14-02-20
Thu
20-02-20
31 Tester $400.00
35 6.3 User
acceptance
Test
2 days Fri
21-02-20
Mon
24-02-20
33,34 Tester $160.00
36 6.4 Documentation2 days Tue 25-02-20Wed 26-02-2035 Project manager,Recruitment team$2,400.00
37 6.5 Delivery of
service
1 day Thu
27-02-20
Thu
27-02-20
36 Sale and
marketting
,Project
$1,200.00
38 6.6 Delivery of
documentation
2 days Fri
28-02-20
Mon
02-03-20
37 Project
manager
$1,600.00
39 6.7 Project sign Off0 days Mon 02-03-20Mon 02-03-2038 $0.00
Project manager
Financial analyst,Project manager
23-10
Facility manager,Financial analyst
Project manager
Strategic planner,Tester
Project manager,Sale and marketting
Facility manager
Project manager
06-11
Designer,Developer
Facility manager,Developer
Facility manager,Project manager,Designer,Develope
19-12
Designer,Developer,Facility manager,Project manag
Designer,Developer
Designer,Developer
Project manager
07-01
Designer,Developer,Project manager,Recrui
Server team,Strategic planner,Designer
Developer,Facility manager,Financial
Designer,Project manager,Develope
Sale and marketting ,Server team,S
13-02
Project manager,Developer,Desig
Tester
Tester
Project manager,Recruitment te
Sale and marketting ,Project m
Project manager
02-03
06-10 27-10 17-11 08-12 29-12 19-01 09-02 01-03 22-03 12-04
11 September 01 November 21 December 11 February 01 April
Figure 2: Scheduling of each of the activities involved in this project
(Source: Created by the author)
important for reviewing the
project milestones.
Table 2: Delivery date of the deliverable
(Source: Created by the author)
3.10 Project Timeline and schedule
ID Outline
Number
Task
Mode
Task Name Duration Start Finish PredecessorsResource Names Cost
0 0 Development of
an education
management
system
100 days Tue
15-10-19
Mon
02-03-20
$116,200.00
1 1 Providing bank
loans
7 days Tue
15-10-19
Wed
23-10-19
$6,320.00
2 1.1 Identification
of the costs in
volved in the
project
6 days Tue
15-10-19
Tue
22-10-19
Project
manager
$4,800.00
3 1.2 Initiate the
funding
procedure
1 day Wed
23-10-19
Wed
23-10-19
2 Financial
analyst,Project
manager
$1,520.00
4 1.3 Milestone 1:
Approval of
the fund
requests
0 days Wed
23-10-19
Wed
23-10-19
3 Facility
manager,Financial
analyst,Project
manager
$0.00
5 2 Project Initiation 21 days Thu 24-10-19Thu 21-11-19 $26,280.00
6 2.1 Stakeholder
identification
9 days Thu
24-10-19
Tue
05-11-19
4 Facility
manager,Financial
analyst
$12,960.00
7 2.2 Making the
plan of the
project
8 days Wed
06-11-19
Fri
15-11-19
6 Project
manager
$6,400.00
8 2.3 Reviewing the
plan
1 day Wed
06-11-19
Wed
06-11-19
6 Strategic
planner,Tester
$760.00
9 2.4 Change
management
procedure
2 days Mon
18-11-19
Tue
19-11-19
7 Project
manager,Sale
and
marketting
$2,400.00
10 2.5 Forming the
risk
management
plan
3 days Mon
18-11-19
Wed
20-11-19
7 Facility
manager
$2,160.00
11 2.6 Making the
communication
plan
2 days Wed
20-11-19
Thu
21-11-19
7 Project
manager
$1,600.00
12 2.7 End of
milestone 2
0 days Wed
06-11-19
Wed
06-11-19
8 Project
manager
$0.00
13 3 Requirement
Documentation
20 days Fri
22-11-19
Thu
19-12-19
$28,440.00
14 3.1 Requirement
gathering
2 days Fri
22-11-19
Mon
25-11-19
9,11,10 $0.00
15 3.2 Analyzing
Requirement
2 days Tue
26-11-19
Wed
27-11-19
12,14 Designer,Developer $560.00
16 3.3 Documentation
of the entire
system
1 day Thu
28-11-19
Thu
28-11-19
15 Facility
manager,Developer
$880.00
17 3.4 Prepare
developemnt
plan
15 days Fri
29-11-19
Thu
19-12-19
16 Facility
manager,Project
manager,Designer,Developer
$27,000.00
18 3.5 End of
milestone 3
0 days Thu
19-12-19
Thu
19-12-19
17 Facility
manager,Financial
analyst
$0.00
19 4 Designing phase 13 days Fri 20-12-19Tue 07-01-20 $10,360.00
20 4.1 Requirement
gathering
1 day Fri
20-12-19
Fri
20-12-19
18 Designer,Developer,Facility
manager,Project
manager
$1,800.00
21 4.2 Design
approvals
1 day Mon
23-12-19
Mon
23-12-19
18 Designer,Developer $280.00
22 4.3 Making the
use case
descriptions
1 day Tue
24-12-19
Tue
24-12-19
20,21 Designer,Developer $280.00
23 4.4 Mockup of the
entire system
10 days Wed
25-12-19
Tue
07-01-20
22 Project
manager
$8,000.00
24 4.5 End of
milestone 4
0 days Tue
07-01-20
Tue
07-01-20
23 $0.00
25 5 Development
phase
27 days Wed
08-01-20
Thu
13-02-20
$34,720.00
26 5.1 Developing
the online
website
8 days Wed
08-01-20
Fri
17-01-20
24 Designer,Developer,Project
manager,Recruitment
team
$11,840.00
27 5.2 Database
development
10 days Mon
20-01-20
Fri
31-01-20
26 Server
team,Strategic
planner,Designer,Developer
$10,400.00
28 5.3 Identification
of the
teachers and
classes
5 days Mon
03-02-20
Fri
07-02-20
27 Developer,Facility
manager,Financial
analyst
$8,000.00
29 5.4 Development
of the
registration
process
2 days Mon
10-02-20
Tue
11-02-20
28 Designer,Project
manager,Developer
$2,160.00
30 5.5 Assigning
students in
specific
classes
2 days Wed
12-02-20
Thu
13-02-20
29 Sale and
marketting
,Server
team,Strategic
$2,320.00
31 5.6 End of
milestone 5
0 days Thu
13-02-20
Thu
13-02-20
30 Sale and
marketting
,Server
$0.00
32 6 Deployment and
service
12 days Fri
14-02-20
Mon
02-03-20
$10,080.00
33 6.1 Launching the
new system
4 days Fri
14-02-20
Wed
19-02-20
31 Project
manager,Developer,Designer
$4,320.00
34 6.2 White box
testing
5 days Fri
14-02-20
Thu
20-02-20
31 Tester $400.00
35 6.3 User
acceptance
Test
2 days Fri
21-02-20
Mon
24-02-20
33,34 Tester $160.00
36 6.4 Documentation2 days Tue 25-02-20Wed 26-02-2035 Project manager,Recruitment team$2,400.00
37 6.5 Delivery of
service
1 day Thu
27-02-20
Thu
27-02-20
36 Sale and
marketting
,Project
$1,200.00
38 6.6 Delivery of
documentation
2 days Fri
28-02-20
Mon
02-03-20
37 Project
manager
$1,600.00
39 6.7 Project sign Off0 days Mon 02-03-20Mon 02-03-2038 $0.00
Project manager
Financial analyst,Project manager
23-10
Facility manager,Financial analyst
Project manager
Strategic planner,Tester
Project manager,Sale and marketting
Facility manager
Project manager
06-11
Designer,Developer
Facility manager,Developer
Facility manager,Project manager,Designer,Develope
19-12
Designer,Developer,Facility manager,Project manag
Designer,Developer
Designer,Developer
Project manager
07-01
Designer,Developer,Project manager,Recrui
Server team,Strategic planner,Designer
Developer,Facility manager,Financial
Designer,Project manager,Develope
Sale and marketting ,Server team,S
13-02
Project manager,Developer,Desig
Tester
Tester
Project manager,Recruitment te
Sale and marketting ,Project m
Project manager
02-03
06-10 27-10 17-11 08-12 29-12 19-01 09-02 01-03 22-03 12-04
11 September 01 November 21 December 11 February 01 April
Figure 2: Scheduling of each of the activities involved in this project
(Source: Created by the author)
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10EDUCATION MANAGEMENT SYSTEM FOR MATHS CLASSES
3.10.1 Work Breakdown structure
Figure 3: WBS of the project
(Source: Created by the author)
3.11 Knowledge database and machine learning algorithm
Step 1: Knowledge database design
The role of the designers are very much important regarding the creation of the
knowledge database for this online business [8]. The database which can be very much useful
for this online maths tuition classes is a relational database. One of the prime advantage of
this database is that it eliminated any data duplication procedure [26]. The flexibility offered
by this database in terms of the queries can be very much useful for this online business. The
other advantage of this database in this online business is that multiple admins can access this
database at the same time [9]. The prototype of the admin panel of this education
management system is described in the following table.
Admin panel of the proposed education management system
3.10.1 Work Breakdown structure
Figure 3: WBS of the project
(Source: Created by the author)
3.11 Knowledge database and machine learning algorithm
Step 1: Knowledge database design
The role of the designers are very much important regarding the creation of the
knowledge database for this online business [8]. The database which can be very much useful
for this online maths tuition classes is a relational database. One of the prime advantage of
this database is that it eliminated any data duplication procedure [26]. The flexibility offered
by this database in terms of the queries can be very much useful for this online business. The
other advantage of this database in this online business is that multiple admins can access this
database at the same time [9]. The prototype of the admin panel of this education
management system is described in the following table.
Admin panel of the proposed education management system

11EDUCATION MANAGEMENT SYSTEM FOR MATHS CLASSES
Teacher panel Student/ parent
panel
Fees category Administration
Routine Allotment of class/
exam notifications
Due date reminder Approval of each of
the enrolment and
registration requests.
Table 3: Prototype of admin panel
(Source: Created by the author)
Education management system admin applications
Name of the class (Class name)
Time of the class (Time of the classes)
Timings 10am-1pm
1pm-4pm
5pm-8pm
Save the changes
Cancel
Table 4: Admin panel
(Source: Created by the author)
Step 2: Initial knowledge repository
The online database of this education management system must be considering
knowledge based information so that the issues of the knowledge repositories is maintained.
The documents, reports and the databases must be aligned in such a manner so that the
Teacher panel Student/ parent
panel
Fees category Administration
Routine Allotment of class/
exam notifications
Due date reminder Approval of each of
the enrolment and
registration requests.
Table 3: Prototype of admin panel
(Source: Created by the author)
Education management system admin applications
Name of the class (Class name)
Time of the class (Time of the classes)
Timings 10am-1pm
1pm-4pm
5pm-8pm
Save the changes
Cancel
Table 4: Admin panel
(Source: Created by the author)
Step 2: Initial knowledge repository
The online database of this education management system must be considering
knowledge based information so that the issues of the knowledge repositories is maintained.
The documents, reports and the databases must be aligned in such a manner so that the
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 28
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2026 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.