Vehicle Maintenance Facility Project Planning and Budgeting Assignment

Verified

Added on  2022/08/27

|15
|1981
|14
Project
AI Summary
This project planning and budgeting assignment focuses on the development of a vehicle maintenance facility. It outlines project goals, objectives, constraints, and assumptions. The assignment details project deliverables, including a project scope statement, Gantt chart, network chart with a critical path, and work breakdown structure. It also presents a project schedule and concludes with a discussion of project management concepts. The project aims to design a vehicle maintenance system with features typical of small-scale commercial buildings, ensuring efficient vehicle servicing within a fixed budget and timeframe. The document includes an introduction, project background, goals, objectives, constraints, assumptions, deliverables, scope statement, Gantt chart, network chart, work breakdown structure, project schedule, and conclusion, along with a bibliography. The assignment emphasizes the importance of effective project management, scheduling, and budgeting for successful project execution.
Document Page
Running head: PROJECT PLANNING AND BUDGETING
PROJECT PLANNING AND BUDGETING- Vehicle Maintenance Facility
Case Study
Name of the Student
Name of the University
Author Note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1
PROJECT PLANNING AND BUDGETING
Table of Contents
Introduction......................................................................................................................................2
Project background..........................................................................................................................2
Project goals and objective..............................................................................................................3
Project constraints and assumptions................................................................................................3
Assumptions................................................................................................................................4
Constraints...................................................................................................................................4
Project deliverables..........................................................................................................................5
Project scope statement....................................................................................................................5
Project Gantt chart...........................................................................................................................6
Network chart with critical path......................................................................................................8
Work breakdown structure..............................................................................................................9
Project schedule.............................................................................................................................10
Conclusion.....................................................................................................................................11
Bibliography..................................................................................................................................13
Document Page
2
PROJECT PLANNING AND BUDGETING
Introduction
The main goal of the assessment is to provide an effective way of managing the project
schedule and budget. It becomes very important to ensure that the main constituents associated
with the project are successfully meet. The aim of the project is to develop a vehicle maintenance
facility project that will be designed with all the essential features that are present within a small
scale commercial building. The report will be developed for the purpose of providing the project
goals and objectives. Along with this the project schedule will also be prepared so that it
becomes easy to understand the different project phases. In order to understand the project
phases effectively work breakdown structure is also going to be developed.
Project background
The project mainly aims at describing the schedule and the scope that is essential for
providing a proper vehicles service. There is a need to ensure that every phase of schedule
management has been implemented successfully within the project. Scheduling is the basic
components into while organizing a project as this ensures that all the essential data in order to
successfully meet at the time of execution. Vehicle maintenance facility project is one of a
hypothetical corporate vehicle maintenance facility. This is designed with the purpose of offering
proper services to commercial buildings. In order to successfully execute the project all the
essential approvals are already made. This site for the project is located on city Street in an
industrial park. The site plan is prepared with the large parking lot that will allow vehicles to
park and will ensure that the services provided at a station. The main reason behind planning the
vehicle maintenance facility is to ensure that every vehicle is provided with proper services.
Document Page
3
PROJECT PLANNING AND BUDGETING
Project goals and objective
The aim of the project is to develop an efficient project that will be capable of providing
better maintenance towards the vehicles. The project is designed with the aim of providing better
support towards vehicle maintenance facility. The project will be executed within a fixed price,
and fixed scopes that are decided before executing the project. According to the budget and the
time estimated it has been decided that the project will be executed within 185 days.. The main
goal that is associated with the project is to ensure that all the exterior and interior components
are developed within the project successfully so that it can offer a better service towards the
customer. All the essential facilities will be provided to words the users and by the end of the
project. The key project objectives are listed below:
To offer proper services and maintenance towards the vehicles
Executing the project within the estimated budget and time
The project will be executed as per the requirements provided by the users.
Ensuring that all resources are managed successfully
Project constraints and assumptions
The assumptions that were made before executing the project are that the project will be
executed within the estimated budget. The main deliverables that are associated with the project
implementation includes identifying the resources, locating proper work to property individuals
and ensuring that all components are fulfilled while executing the project.
Project assumptions is referred to the condition that is made based on the project
requirements. On the other hand project constraints are referred to the limitations that are
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4
PROJECT PLANNING AND BUDGETING
associated with the project. While executing a project it is important to make proper assumptions
so that it becomes easy to manage all the key objectives.
Assumptions
The project will be developed with the help of proper project team members and will
ensure that all the project objectives are fulfilled. It has also been decided that the project budget
will be around $1,162,366. Every project faces will be evaluated by the project managers so that
the chances of errors can be reduced effectively.
Constraints
The project constraint that has the potential to hamper the overall performance of the
project includes the time constraints, the budget constraints and resource constraints. It becomes
essential to ensure that the entire objective is fulfilled with the development of the project.
However it becomes very difficult to ensure that the project is executed by mitigating all the
risks. The constraints are discussed below:
A time constraint occurs when the project team member fails to execute the project
within the estimated time.
Budget constraint is also one such issue that has the potential to hamper the overall
development of the project. There is a need to maintain the overall budget so that the chances of
budget overrun can be minimized. Budget overrun takes place due to human errors and
sometimes due to inappropriate management of resources. Thus there is a need to ensure that
proper resource management has been integrated within the project.
Resource constraint is referred to the issues that is mainly faced due to lack of resources.
Before starting execution of the project it is important to ensure that all the resources are
Document Page
5
PROJECT PLANNING AND BUDGETING
managed successfully. Vehicle maintenance facility project is one such project that requires use
amount of resources there is there is a need to ensure that all the resources I had organized from
the first.
Project deliverables
Project deliverables are referred to the elements that are needed for successfully
developing a project. The maintenance of vehicles will be executed efficiently with in the
project. For this purpose the car parking bays is being developed so that it can offer all the
essential functionalities towards the vehicles. For the purpose of receiving the desired output it is
important to provide all the essential imports effectively. The resources and manpower needs to
be managed effectively so that all the project deliverables can be meet. Project managers need to
highlight all the deliverables to words the team members so that they can work accordingly. The
key factors those are essential for the vehicle maintenance facility project includes the overall
time, cost and quality of the project. It is important to ensure that the project has been developed
with proper quality so that it becomes easy to offer better service towards the customer.
Project scope statement
Vehicle maintenance facility project aims at designing a vehicle maintenance system that
will have all the features that are present within small scale commercial building. The plan
includes the following feature:
Large parking lot
Runoff developed that will be handled properly catch basins and 18 inch corrugated
metal pipe storm drains
Document Page
6
PROJECT PLANNING AND BUDGETING
Building divided into two main areas
Structure designed with CMU walls that contains steel roof structure
Vehicle service area will be designed
Service area with vehicle lifts
Project Gantt chart
Gantt chart is used for the purpose of illustrating the project schedule. It becomes easy to
understand the flow of project phases.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7
PROJECT PLANNING AND BUDGETING
Document Page
8
PROJECT PLANNING AND BUDGETING
Network chart with critical path
Network diagram with in project management is referred to the visual representation of
the schedule. With the help of a network diagram it becomes easy to plan the project and also it
becomes easy to determine the start and the finish of the project. There are several tasks that are
associated with the Vehicle maintenance facility project. The red highlighted tasks are known as
the critical path of the project. Critical path is referred to the minimum time that will be needed
for executing a project. The below diagram represents the network diagram for the vehicle
maintenance facility project.
Document Page
9
PROJECT PLANNING AND BUDGETING
Work breakdown structure
Work breakdown structure is used for the purpose of dividing the different deliverables
efficiently. With the help of a work breakdown structure it becomes quite easy to establish the
basic factors that are related to the project. It is important to use work breakdown structure for
understanding the different components related to the project.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10
PROJECT PLANNING AND BUDGETING
Project schedule
Project scheduling plays a crucial role as this helps in ensuring that the project has been
implemented within the predictable time, budget and with appropriate quality. With the help of
project scheduling it becomes easy to track the project execution. The important factors that are
included for successfully managing a project schedule includes documentation, quality assurance
and managing the resources financially.
Document Page
11
PROJECT PLANNING AND BUDGETING
Conclusion
Project management concepts are crucial for executing a project successfully. The project
has been developed with all the essential requirements. Thus after evaluating the project
components it can be specified that with the help of proper project assumptions and constraints
chevron_up_icon
1 out of 15
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]