Virtucon TAHS Project: Charter, Scope, WBS, and Quality Plan
VerifiedAdded on  2023/05/30
|32
|5433
|146
Project
AI Summary
This document presents a comprehensive project charter for the Virtucon case study, focusing on the Training and Apprenticeship Program for High School students (TAHS). It details the measurable organizational value (MOV) by identifying desired impact areas such as operational, strategy, customer, social, and financial aspects, ranking their importance and defining value types like better, faster, cheaper, and do more. The charter outlines a scope management plan, including project requirements, deliverables, and scope verification processes, along with a list of resources. A work breakdown structure (WBS) provides a detailed breakdown of tasks, phases, milestones, and deliverables, visualized through a Gantt chart. Furthermore, the document addresses project assumptions, risk identification, analysis, and mitigation strategies. The quality management plan ensures quality through activity validation and verification. Finally, it includes a project closure checklist and evaluation, supported by an annotated bibliography. This complete project charter provides a structured approach to managing and executing the Virtucon TAHS project.

0CHARTER DEVELOPMENT OF THE VIRTUCON CASE STUDY PROJECT
Charter Development of the Virtucon Case Study Project
Name of the Student
Name of the University
Author’s note
Charter Development of the Virtucon Case Study Project
Name of the Student
Name of the University
Author’s note
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1CHARTER DEVELOPMENT OF THE VIRTUCON CASE STUDY PROJECT
Table of Contents
Part 1: Measurable Organisational Value........................................................................................3
1.1 Project Description and Overview.........................................................................................3
1.2 Identification of Desired Area of Impact...............................................................................3
1.3 Identified Value of Project.....................................................................................................4
1.4 Expectation and Target for Stakeholders within the Project.................................................4
1.5 Timeline based on Measurable Organisational Value...........................................................5
1.6 Summarisation of Measurable Organisational Value............................................................6
Part 2: Scope Management Plan......................................................................................................6
2.1 Scope Management Plan........................................................................................................6
2.1.1 Requirements of Project.................................................................................................6
2.1.2 In scope and Out of Scope of the Concerned Project.....................................................6
2.1.3 Project Deliverables........................................................................................................7
2.1.4 Process of Scope Verification.........................................................................................7
2.2 List of Resources...................................................................................................................8
Part 3: Work Breakdown Structure (WBS).....................................................................................9
3.1 WBS for TAHS......................................................................................................................9
3.2 Phase Milestone and Deliverables.......................................................................................18
3.3 Gantt Chart...........................................................................................................................21
Part 4: Project Assumption............................................................................................................22
Table of Contents
Part 1: Measurable Organisational Value........................................................................................3
1.1 Project Description and Overview.........................................................................................3
1.2 Identification of Desired Area of Impact...............................................................................3
1.3 Identified Value of Project.....................................................................................................4
1.4 Expectation and Target for Stakeholders within the Project.................................................4
1.5 Timeline based on Measurable Organisational Value...........................................................5
1.6 Summarisation of Measurable Organisational Value............................................................6
Part 2: Scope Management Plan......................................................................................................6
2.1 Scope Management Plan........................................................................................................6
2.1.1 Requirements of Project.................................................................................................6
2.1.2 In scope and Out of Scope of the Concerned Project.....................................................6
2.1.3 Project Deliverables........................................................................................................7
2.1.4 Process of Scope Verification.........................................................................................7
2.2 List of Resources...................................................................................................................8
Part 3: Work Breakdown Structure (WBS).....................................................................................9
3.1 WBS for TAHS......................................................................................................................9
3.2 Phase Milestone and Deliverables.......................................................................................18
3.3 Gantt Chart...........................................................................................................................21
Part 4: Project Assumption............................................................................................................22

2CHARTER DEVELOPMENT OF THE VIRTUCON CASE STUDY PROJECT
4.1 Project Assumption..............................................................................................................22
4.2 Risk Identification Framework............................................................................................22
4.3 Risk Analysis and Mitigation Plan......................................................................................24
Part 5: Quality Management Plan of Project.................................................................................26
5.1 Philosophy of Project Team.................................................................................................26
5.2 Ensuring of Quality..............................................................................................................26
5.2.1 Validation of Activity...................................................................................................26
5.2.2 Verification of Activity.................................................................................................26
Part 6: Closure and Evaluation......................................................................................................27
6.1 Annotated Bibliography.......................................................................................................27
6.2 Project Closure Checklist....................................................................................................29
6.3 Project Evaluation................................................................................................................29
Bibliography..................................................................................................................................30
4.1 Project Assumption..............................................................................................................22
4.2 Risk Identification Framework............................................................................................22
4.3 Risk Analysis and Mitigation Plan......................................................................................24
Part 5: Quality Management Plan of Project.................................................................................26
5.1 Philosophy of Project Team.................................................................................................26
5.2 Ensuring of Quality..............................................................................................................26
5.2.1 Validation of Activity...................................................................................................26
5.2.2 Verification of Activity.................................................................................................26
Part 6: Closure and Evaluation......................................................................................................27
6.1 Annotated Bibliography.......................................................................................................27
6.2 Project Closure Checklist....................................................................................................29
6.3 Project Evaluation................................................................................................................29
Bibliography..................................................................................................................................30
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3CHARTER DEVELOPMENT OF THE VIRTUCON CASE STUDY PROJECT
Part 1: Measurable Organisational Value
1.1 Project Description and Overview
The Globex Farm Equipment team has 30 years of collective experience in the
agricultural sector. They have been provided with the major responsibility of enhancing the
farming scenario. This would be highly essential for assisting farmers in each step of the
operational procedures. In order to serve the community in a better manner, the management
team of Globex have decided to implement a strategic decision on starting a Training and
Apprenticeship Program for High School students (TAHS). This program is mainly intended for
assisting the students in gaining work experience and thus increasing the opportunities of
employment within the farming sector. These opportunities would be highly needed for various
farming solution specialists.
1.2 Identification of Desired Area of Impact
Operational: The training solution provided to the students would help them in fostering
the skills based on serving different products based on providing farming solutions.
Strategy: The computer-based system of TAHS would efficiently help in delivering the
solution within proper estimated time. They would also help in mitigating the various issues
faced during collection of farming equipment based on the needs of farming solutions.
Customer: The high school students and farmers would be affected with the decisions
made by the management team.
Social: The computer-based system would be able to majorly assist in bringing efficiency
within the TAHS.
Part 1: Measurable Organisational Value
1.1 Project Description and Overview
The Globex Farm Equipment team has 30 years of collective experience in the
agricultural sector. They have been provided with the major responsibility of enhancing the
farming scenario. This would be highly essential for assisting farmers in each step of the
operational procedures. In order to serve the community in a better manner, the management
team of Globex have decided to implement a strategic decision on starting a Training and
Apprenticeship Program for High School students (TAHS). This program is mainly intended for
assisting the students in gaining work experience and thus increasing the opportunities of
employment within the farming sector. These opportunities would be highly needed for various
farming solution specialists.
1.2 Identification of Desired Area of Impact
Operational: The training solution provided to the students would help them in fostering
the skills based on serving different products based on providing farming solutions.
Strategy: The computer-based system of TAHS would efficiently help in delivering the
solution within proper estimated time. They would also help in mitigating the various issues
faced during collection of farming equipment based on the needs of farming solutions.
Customer: The high school students and farmers would be affected with the decisions
made by the management team.
Social: The computer-based system would be able to majorly assist in bringing efficiency
within the TAHS.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4CHARTER DEVELOPMENT OF THE VIRTUCON CASE STUDY PROJECT
Financial: The computer-based system would be helpful for increasing the efficiency
and profits of Globex systems of business.
1.3 Identified Value of Project
Val
ue
Area
of Impact
Cheaper (On a scale
of 1 to 3)
Better (On a
scale of 1 to 3)
Do More(On a
scale of 1 to 3)
Faster (On a scale
of 1 to 3)
Operational 3 1 1 1
Strategy 3 2 3 3
Customer 3 2 3 3
Social 2 1 2 3
Financial 3 2 2 3
1.4 Expectation and Target for Stakeholders within the Project
Stakeholders Expectations Target
Virtucon Managing the development of the computer based
system and deliver solution within the expected
delivery time.
Medium
Globex Corporation Imparting of training to students based on their skills
for working in different sectors.
High
Development Team Developing the computer based system as per the High
Financial: The computer-based system would be helpful for increasing the efficiency
and profits of Globex systems of business.
1.3 Identified Value of Project
Val
ue
Area
of Impact
Cheaper (On a scale
of 1 to 3)
Better (On a
scale of 1 to 3)
Do More(On a
scale of 1 to 3)
Faster (On a scale
of 1 to 3)
Operational 3 1 1 1
Strategy 3 2 3 3
Customer 3 2 3 3
Social 2 1 2 3
Financial 3 2 2 3
1.4 Expectation and Target for Stakeholders within the Project
Stakeholders Expectations Target
Virtucon Managing the development of the computer based
system and deliver solution within the expected
delivery time.
Medium
Globex Corporation Imparting of training to students based on their skills
for working in different sectors.
High
Development Team Developing the computer based system as per the High

5CHARTER DEVELOPMENT OF THE VIRTUCON CASE STUDY PROJECT
needed outcomes of Globex
Farmers and High
School Students
Gain proper form of training provided by Globex.
This would help in assisting with the needs of
farming
High
1.5 Timeline based on Measurable Organisational Value
Task Name Duration Start Finish
Charter Development for Virtucon
Systems 296 days Tue 22-01-19 Tue 10-03-20
Start of Project 0 days Tue 22-01-19 Tue 22-01-19
Phase of Project Planning 42 days Tue 22-01-19 Wed 20-03-19
Evaluation of Business Requirements 8 days Thu 21-03-19 Mon 01-04-19
Documentation of User Requirement
of New System 21 days Tue 02-04-19 Tue 30-04-19
Phase of Designing of Computer-based
training system 16 days Wed 01-05-19 Wed 22-05-19
Development of Specification of
Functional Systems 35 days Thu 23-05-19 Wed 10-07-19
Implementation Phase 69 days Thu 11-07-19 Tue 15-10-19
Phase of Testing 58 days Wed 16-10-19 Fri 03-01-20
Deployment Phase 26 days Mon 06-01-20 Mon 10-02-20
Closing phase of project 15 days Tue 11-02-20 Mon 02-03-20
Ending of Project 6 days Tue 03-03-20 Tue 10-03-20
needed outcomes of Globex
Farmers and High
School Students
Gain proper form of training provided by Globex.
This would help in assisting with the needs of
farming
High
1.5 Timeline based on Measurable Organisational Value
Task Name Duration Start Finish
Charter Development for Virtucon
Systems 296 days Tue 22-01-19 Tue 10-03-20
Start of Project 0 days Tue 22-01-19 Tue 22-01-19
Phase of Project Planning 42 days Tue 22-01-19 Wed 20-03-19
Evaluation of Business Requirements 8 days Thu 21-03-19 Mon 01-04-19
Documentation of User Requirement
of New System 21 days Tue 02-04-19 Tue 30-04-19
Phase of Designing of Computer-based
training system 16 days Wed 01-05-19 Wed 22-05-19
Development of Specification of
Functional Systems 35 days Thu 23-05-19 Wed 10-07-19
Implementation Phase 69 days Thu 11-07-19 Tue 15-10-19
Phase of Testing 58 days Wed 16-10-19 Fri 03-01-20
Deployment Phase 26 days Mon 06-01-20 Mon 10-02-20
Closing phase of project 15 days Tue 11-02-20 Mon 02-03-20
Ending of Project 6 days Tue 03-03-20 Tue 10-03-20
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6CHARTER DEVELOPMENT OF THE VIRTUCON CASE STUDY PROJECT
1.6 Summarisation of Measurable Organisational Value
Serial
No
MOV Description
1 Project Description Providing a definition of aims and deliverables
2 Desired Impact Area Identification of the impact of Strategy,
Operational, Social, Customer and Financial
impacts made on project
3 Value of Project Low budget and higher performance based on
computer-based system
4 Stakeholders’ Expectation and
Target
Development of proper form of target
stakeholders, which would increase the system
efficiency
Part 2: Scope Management Plan
2.1 Scope Management Plan
2.1.1 Requirements of Project
The requirements of the concerned project could be defined as:
ï‚· Higher performance of work
ï‚· Proper coordination of work
ï‚· Efficient functionality of work
ï‚· Cost efficiency
1.6 Summarisation of Measurable Organisational Value
Serial
No
MOV Description
1 Project Description Providing a definition of aims and deliverables
2 Desired Impact Area Identification of the impact of Strategy,
Operational, Social, Customer and Financial
impacts made on project
3 Value of Project Low budget and higher performance based on
computer-based system
4 Stakeholders’ Expectation and
Target
Development of proper form of target
stakeholders, which would increase the system
efficiency
Part 2: Scope Management Plan
2.1 Scope Management Plan
2.1.1 Requirements of Project
The requirements of the concerned project could be defined as:
ï‚· Higher performance of work
ï‚· Proper coordination of work
ï‚· Efficient functionality of work
ï‚· Cost efficiency
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7CHARTER DEVELOPMENT OF THE VIRTUCON CASE STUDY PROJECT
2.1.2 In scope and Out of Scope of the Concerned Project
Project Scope
ï‚· Development of system within the allocated time, deliverables and budget
ï‚· Effective managing of agricultural products and assistance of farmers based on TAHS
ï‚· Effective management of project based on developing of farming solutions
Out of Scope
ï‚· Saving of details of students
ï‚· Imparting training to Globex employees
ï‚· Providing installation of computer based application
2.1.3 Project Deliverables
2.1.4 Process of Scope Verification
In the concerned project, the employees would primarily follow and adhere to the WBS
that would be developed within the project charter.
2.1.2 In scope and Out of Scope of the Concerned Project
Project Scope
ï‚· Development of system within the allocated time, deliverables and budget
ï‚· Effective managing of agricultural products and assistance of farmers based on TAHS
ï‚· Effective management of project based on developing of farming solutions
Out of Scope
ï‚· Saving of details of students
ï‚· Imparting training to Globex employees
ï‚· Providing installation of computer based application
2.1.3 Project Deliverables
2.1.4 Process of Scope Verification
In the concerned project, the employees would primarily follow and adhere to the WBS
that would be developed within the project charter.

8CHARTER DEVELOPMENT OF THE VIRTUCON CASE STUDY PROJECT
2.2 List of Resources
Resource Name Type Max. Units Std. Rate
Project Manager Work 100% $1,000.00/hr
Business Analyst Work 100% $150.00/hr
Coder Work 100% $110.00/hr
Design Team Work 100% $120.00/hr
Development Manager Work 100% $180.00/hr
Risk Analyzer Work 100% $190.00/hr
Globex Employees Work 100% $140.00/hr
Hardware Work 100% $0.00/hr
Project Sponsor Work 100% $90.00/hr
Development Team Work 100% $70.00/hr
System Designer Work 100% $115.00/hr
System Developer Work 100% $110.00/hr
System Analyst Work 100% $60.00/hr
System Tester Work 100% $70.00/hr
Testing Manager Work 100% $145.00/hr
Hardware Material $0.00
Software Material $0.00
Project Accounting Manager Work 100% $100.00/hr
Investment Manager Work 100% $60.00/hr
Software Engineer Work 100% $150.00/hr
2.2 List of Resources
Resource Name Type Max. Units Std. Rate
Project Manager Work 100% $1,000.00/hr
Business Analyst Work 100% $150.00/hr
Coder Work 100% $110.00/hr
Design Team Work 100% $120.00/hr
Development Manager Work 100% $180.00/hr
Risk Analyzer Work 100% $190.00/hr
Globex Employees Work 100% $140.00/hr
Hardware Work 100% $0.00/hr
Project Sponsor Work 100% $90.00/hr
Development Team Work 100% $70.00/hr
System Designer Work 100% $115.00/hr
System Developer Work 100% $110.00/hr
System Analyst Work 100% $60.00/hr
System Tester Work 100% $70.00/hr
Testing Manager Work 100% $145.00/hr
Hardware Material $0.00
Software Material $0.00
Project Accounting Manager Work 100% $100.00/hr
Investment Manager Work 100% $60.00/hr
Software Engineer Work 100% $150.00/hr
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9CHARTER DEVELOPMENT OF THE VIRTUCON CASE STUDY PROJECT
Part 3: Work Breakdown Structure (WBS)
3.1 WBS for TAHS
Outline
Number Task Name Duration Start Finish Predecessors Resource Names Cost
0
Charter
Development for
Virtucon Systems
296 days Tue 22-
01-19
Tue 10-
03-20 $1,924,240.00
1 Start of Project 0 days Tue 22-
01-19
Tue 22-
01-19 $0.00
2 Phase of
Project Planning 42 days Tue 22-
01-19
Wed
20-03-
19
$443,360.00
2.1
Meeting with
Globex
Management
Team
3 days Tue 22-
01-19
Thu 24-
01-19
Business Analyst,
Project Manager $27,600.00
2.2
Conduction and
development of
feasibility study
2 days Fri 25-
01-19
Mon
28-01-
19
3
Business Analyst,
Project Manager $18,400.00
2.3 Development of
Project Charter 6 days Tue 29-
01-19
Tue 05-
02-19 4
Business Analyst,
Project Manager $55,200.00
2.4 Verification of
Project Charter 7 days
Wed
06-02-
19
Thu 14-
02-19 5
Business Analyst,
Project Manager $64,400.00
2.5
Development
of a plan of
communication
2 days Fri 15-
02-19
Mon
18-02-
19
6
Business Analyst,
Project Manager $18,400.00
2.6 Development
of a plan of
Resource
2 days Tue 19-
02-19
Wed
20-02-
19
7 Business Analyst, $18,400.00
Part 3: Work Breakdown Structure (WBS)
3.1 WBS for TAHS
Outline
Number Task Name Duration Start Finish Predecessors Resource Names Cost
0
Charter
Development for
Virtucon Systems
296 days Tue 22-
01-19
Tue 10-
03-20 $1,924,240.00
1 Start of Project 0 days Tue 22-
01-19
Tue 22-
01-19 $0.00
2 Phase of
Project Planning 42 days Tue 22-
01-19
Wed
20-03-
19
$443,360.00
2.1
Meeting with
Globex
Management
Team
3 days Tue 22-
01-19
Thu 24-
01-19
Business Analyst,
Project Manager $27,600.00
2.2
Conduction and
development of
feasibility study
2 days Fri 25-
01-19
Mon
28-01-
19
3
Business Analyst,
Project Manager $18,400.00
2.3 Development of
Project Charter 6 days Tue 29-
01-19
Tue 05-
02-19 4
Business Analyst,
Project Manager $55,200.00
2.4 Verification of
Project Charter 7 days
Wed
06-02-
19
Thu 14-
02-19 5
Business Analyst,
Project Manager $64,400.00
2.5
Development
of a plan of
communication
2 days Fri 15-
02-19
Mon
18-02-
19
6
Business Analyst,
Project Manager $18,400.00
2.6 Development
of a plan of
Resource
2 days Tue 19-
02-19
Wed
20-02-
19
7 Business Analyst, $18,400.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10CHARTER DEVELOPMENT OF THE VIRTUCON CASE STUDY PROJECT
management Project Manager
2.7 Developing
Project Scope 1 day Thu 21-
02-19
Thu 21-
02-19 8 Project Manager $8,000.00
2.8
Developing
Risk Management
Plan
6 days Fri 22-
02-19
Fri 01-
03-19 9
Globex Employees,
Project Manager,
Risk Analyzer,
Project Accounting
Manager
$68,640.00
2.9
Developing
Quality
Management Plan
6 days
Mon
04-03-
19
Mon
11-03-
19
10
Business Analyst,
Project Accounting
Manager, Globex
Employees, Risk
Analyzer, Project
Manager
$75,840.00
2.10 Planning of
Budget 2 days Tue 12-
03-19
Wed
13-03-
19
11
Business Analyst,
Project Accounting
Manager, Globex
Employees, Risk
Analyzer, Project
Manager
$25,280.00
2.11 Scheduling of
Project Activities 3 days Thu 14-
03-19
Mon
18-03-
19
12
Business Analyst,
Project Accounting
Manager, Globex
Employees, Risk
Analyzer, Project
Manager
$37,920.00
2.12
Process for
Control of
document change
2 days Tue 19-
03-19
Wed
20-03-
19
13
Business Analyst,
Project Accounting
Manager, Globex
Employees, Risk
Analyzer, Project
Manager
$25,280.00
3
Evaluation of
Business
Requirements
8 days Thu 21-
03-19
Mon
01-04-
19
$64,000.00
management Project Manager
2.7 Developing
Project Scope 1 day Thu 21-
02-19
Thu 21-
02-19 8 Project Manager $8,000.00
2.8
Developing
Risk Management
Plan
6 days Fri 22-
02-19
Fri 01-
03-19 9
Globex Employees,
Project Manager,
Risk Analyzer,
Project Accounting
Manager
$68,640.00
2.9
Developing
Quality
Management Plan
6 days
Mon
04-03-
19
Mon
11-03-
19
10
Business Analyst,
Project Accounting
Manager, Globex
Employees, Risk
Analyzer, Project
Manager
$75,840.00
2.10 Planning of
Budget 2 days Tue 12-
03-19
Wed
13-03-
19
11
Business Analyst,
Project Accounting
Manager, Globex
Employees, Risk
Analyzer, Project
Manager
$25,280.00
2.11 Scheduling of
Project Activities 3 days Thu 14-
03-19
Mon
18-03-
19
12
Business Analyst,
Project Accounting
Manager, Globex
Employees, Risk
Analyzer, Project
Manager
$37,920.00
2.12
Process for
Control of
document change
2 days Tue 19-
03-19
Wed
20-03-
19
13
Business Analyst,
Project Accounting
Manager, Globex
Employees, Risk
Analyzer, Project
Manager
$25,280.00
3
Evaluation of
Business
Requirements
8 days Thu 21-
03-19
Mon
01-04-
19
$64,000.00

11CHARTER DEVELOPMENT OF THE VIRTUCON CASE STUDY PROJECT
3.1
Evaluation of
process required
for computer-
based system
8 days Thu 21-
03-19
Mon
01-04-
19
14 Project Manager $64,000.00
4
Documentation
of User
Requirement of
New System
21 days Tue 02-
04-19
Tue 30-
04-19 $168,000.00
4.1 Control of
Audit 4 days Tue 02-
04-19
Fri 05-
04-19 16
Business Analyst,
Project Accounting
Manager,
Investment
Manager, Project
Manager, Project
Sponsor
$44,800.00
4.2 Regulatory
Compliance 6 days
Mon
08-04-
19
Mon
15-04-
19
18 $0.00
4.3
Reporting to
Senior
management
3 days Tue 16-
04-19
Thu 18-
04-19 19
Business Analyst,
Investment
Manager, Project
Sponsor, Project
Manager, Project
Accounting
Manager
$33,600.00
4.4 Developing of
Management Plan 8 days Fri 19-
04-19
Tue 30-
04-19 20
Business Analyst,
Project Accounting
Manager, Project
Manager, Project
Sponsor,
Investment
Manager
$89,600.00
5
Phase of
Designing of
Computer-based
training system
16 days
Wed
01-05-
19
Wed
22-05-
19
$204,160.00
3.1
Evaluation of
process required
for computer-
based system
8 days Thu 21-
03-19
Mon
01-04-
19
14 Project Manager $64,000.00
4
Documentation
of User
Requirement of
New System
21 days Tue 02-
04-19
Tue 30-
04-19 $168,000.00
4.1 Control of
Audit 4 days Tue 02-
04-19
Fri 05-
04-19 16
Business Analyst,
Project Accounting
Manager,
Investment
Manager, Project
Manager, Project
Sponsor
$44,800.00
4.2 Regulatory
Compliance 6 days
Mon
08-04-
19
Mon
15-04-
19
18 $0.00
4.3
Reporting to
Senior
management
3 days Tue 16-
04-19
Thu 18-
04-19 19
Business Analyst,
Investment
Manager, Project
Sponsor, Project
Manager, Project
Accounting
Manager
$33,600.00
4.4 Developing of
Management Plan 8 days Fri 19-
04-19
Tue 30-
04-19 20
Business Analyst,
Project Accounting
Manager, Project
Manager, Project
Sponsor,
Investment
Manager
$89,600.00
5
Phase of
Designing of
Computer-based
training system
16 days
Wed
01-05-
19
Wed
22-05-
19
$204,160.00
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 32
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.