Detailed Project Plan Report: Wesfarmers Website Improvement Project
VerifiedAdded on 2022/12/26
|17
|3276
|49
Report
AI Summary
This report presents a project plan for Wesfarmers, a major Australian retail company, focusing on website updation to enhance customer experience and market share. The project plan includes an executive summary, introduction, work breakdown structure (WBS), project roles, cost analysis, risk assessment, and a software demonstration. The WBS outlines project charter, management plan, project work management, knowledge management, monitoring and control, and project integration and closure. The report details project roles such as project manager, web developer, requirements analyst, and user experience designer, along with schedule, cost, quality, management, and control measures. It also provides a detailed risk analysis, including potential risks like budget underestimation, technology changes, communication issues, resource constraints, and external environment changes, along with mitigation strategies. The total project cost is estimated at £6000. The report aims to provide a structured approach to the website development project, ensuring its successful implementation and achievement of the company's objectives.

PROJECT MANAGEMENT DEVELOP
A PROJECT PLAN
A PROJECT PLAN
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

EXECUTIVE SUMMARY
Project management is process that involves management of several various activities
related to the project so that goals can be achieved in the best possible manner. This report has
consists of new project that has been incorporated by Wesfarmers that is updatation in websites
so that more better experienced can be delivered to customer's. It has included various
information related to risk, schedule of activities and actual cost that company will make in order
to successful attained the end goals of the project.
Project management is process that involves management of several various activities
related to the project so that goals can be achieved in the best possible manner. This report has
consists of new project that has been incorporated by Wesfarmers that is updatation in websites
so that more better experienced can be delivered to customer's. It has included various
information related to risk, schedule of activities and actual cost that company will make in order
to successful attained the end goals of the project.

TABLE OF CONTENTS
EXECUTIVE SUMMARY.............................................................................................................2
INTRODUCTION...........................................................................................................................4
Introduction to project plan.........................................................................................................4
Work breakdown structure .........................................................................................................4
Project roles.................................................................................................................................6
Total cost need to be incurred related to implementation of the project.....................................7
Detailed risk analysis, control procedure and Backup plan........................................................8
Software demonstration..............................................................................................................9
CONCLUSION..............................................................................................................................10
REFERENCES..............................................................................................................................12
EXECUTIVE SUMMARY.............................................................................................................2
INTRODUCTION...........................................................................................................................4
Introduction to project plan.........................................................................................................4
Work breakdown structure .........................................................................................................4
Project roles.................................................................................................................................6
Total cost need to be incurred related to implementation of the project.....................................7
Detailed risk analysis, control procedure and Backup plan........................................................8
Software demonstration..............................................................................................................9
CONCLUSION..............................................................................................................................10
REFERENCES..............................................................................................................................12

INTRODUCTION
Project management is process of coordinating diverse range of people that have various
skills, capabilities and knowledge so that the objectives can be achieved in limited time frame.
The project manager is important individual that undertake all responsibilities to plan, organize
and direct the way particular project will be completed so that maximum outcome can be
enjoyed by company. Wesfarmers is one of the largest companies in retail industry of Australia
that has diverse business operation and products or services for satisfaction of needs of large
number of individual living in the society. The company has planned to start a new project of
website updation in order to delivered better services of customer's and enhance overall market
share of company. Therefore, this report has explained about necessary steps that are taken by
project manager in order to complete the project of website improvement for benefits of
enterprise.
Introduction to project plan
Project plan is a important document that contained complete detailed related to the way
project will be executed and controlled so that last objectives can be achieved. Thus, it
highlighted crucial detailed related to the way risk, resources will be manager and
communication will be followed for better outcome. Wesfarmers is public listed company having
number of operation and supermarket stores that consist of essentials products or services which
can satisfied daily needs of customer's in better manner. Furthermore, there are around 107000
employees that are working for the company so that various operations can be completed in
limited time frame and cost (Frijns, Van Leeuwen and Bierwolf, 2017). The company have chain
of 378 trading in different location with products like outdoor living, home improvement and
other that are provided in order to satisfied wants of customer's. The company is planning to start
a project of development or updation of website so that more ease and comfort can be provided
to people so that they are motivated to be part of organization.
Project management is process of coordinating diverse range of people that have various
skills, capabilities and knowledge so that the objectives can be achieved in limited time frame.
The project manager is important individual that undertake all responsibilities to plan, organize
and direct the way particular project will be completed so that maximum outcome can be
enjoyed by company. Wesfarmers is one of the largest companies in retail industry of Australia
that has diverse business operation and products or services for satisfaction of needs of large
number of individual living in the society. The company has planned to start a new project of
website updation in order to delivered better services of customer's and enhance overall market
share of company. Therefore, this report has explained about necessary steps that are taken by
project manager in order to complete the project of website improvement for benefits of
enterprise.
Introduction to project plan
Project plan is a important document that contained complete detailed related to the way
project will be executed and controlled so that last objectives can be achieved. Thus, it
highlighted crucial detailed related to the way risk, resources will be manager and
communication will be followed for better outcome. Wesfarmers is public listed company having
number of operation and supermarket stores that consist of essentials products or services which
can satisfied daily needs of customer's in better manner. Furthermore, there are around 107000
employees that are working for the company so that various operations can be completed in
limited time frame and cost (Frijns, Van Leeuwen and Bierwolf, 2017). The company have chain
of 378 trading in different location with products like outdoor living, home improvement and
other that are provided in order to satisfied wants of customer's. The company is planning to start
a project of development or updation of website so that more ease and comfort can be provided
to people so that they are motivated to be part of organization.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Work breakdown structure
The work breakdown structure has been created with integration of different aspects of
project such as resources, stakeholders, time and better communication between several
individual for achievement of last objectives. Therefore, the manager has followed seven process
for successful project integration management such as:
The work breakdown structure has been created with integration of different aspects of
project such as resources, stakeholders, time and better communication between several
individual for achievement of last objectives. Therefore, the manager has followed seven process
for successful project integration management such as:

Project charter: It is document that clearly specific about the objectives of project, the way it
will proceed and respective stakeholders. The main objectives of website development is “ to
provide qualitative experienced to customer's by providing various facilities in the update
website.” The main stakeholders of company will be investors, customer's, employees and
management as they are more interested and affected by the project (Evdokimov, Domantsevich
and Konyhov, 2017).
Project management plan: The manager of Wesfarmers has prepared project management plan
in order to plan in advance about key activities that needs to be completed. It has specified the
way it will meet project stakeholders needs, time frame within which they need to complete for
better outcome.
Direct and manage project work: Wesfarmers project manager has clearly specified about
particular roles and responsibilities need to be completed by individual. On the basis of project
needs and capabilities of person it has delegate task need to be performed by specific team
member that results better management of project work. Furthermore, it has guide and direct
member about the way task can be completed related to development of websites for effective
project implementation (Koke and Moehler, 2019).
Manage project knowledge: In order to manage and retained crucial information related to the
project manager will make use of information technology. The technology has helped manager in
collecting, analysis and retaining information related to the project thereby will lead in more
outcome from the project.
Monitor and control project work: Project manager has continuously put its best efforts and
time to monitor each activity and function performed by individual. Thus , it has helped manager
i identify errors or mistake thereby finding alternative options that could be used for further
improvement. So, monitoring and control action will help in achieving standard objectives in
limited time and cost (Cerdeiral and Santos, 2019).
Integration: The project manager will try to integrate each and every activity, resources that are
arranged for development of websites for growth and success of project. Thus, all activities are
systematically organised so that there is no confusion and conflict regarding specific task need to
be completed by particular individual.
will proceed and respective stakeholders. The main objectives of website development is “ to
provide qualitative experienced to customer's by providing various facilities in the update
website.” The main stakeholders of company will be investors, customer's, employees and
management as they are more interested and affected by the project (Evdokimov, Domantsevich
and Konyhov, 2017).
Project management plan: The manager of Wesfarmers has prepared project management plan
in order to plan in advance about key activities that needs to be completed. It has specified the
way it will meet project stakeholders needs, time frame within which they need to complete for
better outcome.
Direct and manage project work: Wesfarmers project manager has clearly specified about
particular roles and responsibilities need to be completed by individual. On the basis of project
needs and capabilities of person it has delegate task need to be performed by specific team
member that results better management of project work. Furthermore, it has guide and direct
member about the way task can be completed related to development of websites for effective
project implementation (Koke and Moehler, 2019).
Manage project knowledge: In order to manage and retained crucial information related to the
project manager will make use of information technology. The technology has helped manager in
collecting, analysis and retaining information related to the project thereby will lead in more
outcome from the project.
Monitor and control project work: Project manager has continuously put its best efforts and
time to monitor each activity and function performed by individual. Thus , it has helped manager
i identify errors or mistake thereby finding alternative options that could be used for further
improvement. So, monitoring and control action will help in achieving standard objectives in
limited time and cost (Cerdeiral and Santos, 2019).
Integration: The project manager will try to integrate each and every activity, resources that are
arranged for development of websites for growth and success of project. Thus, all activities are
systematically organised so that there is no confusion and conflict regarding specific task need to
be completed by particular individual.

Close the project: At last necessary steps has been taken for closure of project such as
information will be provided to the stakeholders that website has been developed as per planned
for growth and expansion of business in retail sector.
Project roles
Wesfarmers is organization that has planned to start a project of website development in
order to fulfil needs of customer's beyond their expectancy level. Key roles and responsibilities
that needs to be performed by each individual in the project can be stated as follows:
Project manager: It plays important role in project as will plan, organise and decide specific
task need to be complete by particular individual so that best outcome can be achieved in limited
cost and time-frame. Furthermore, it will ensure arrangement and optimum utilization of
resources by delegating and guiding team member about specific task they need to complete so
that website can be updated (Nusari and et.al., 2018).
Web developer or designer: It is another individual in the project which will play role of design
innovative, more creative website that have more facilities and options so that customer's can
easily get information and take correct decision to make purchase. So, it will be responsibilities
for development or updation of website by adding better features, colour picture with necessary
detailed related to the company.
Requirements analysis: It is team member that is mainly responsible for analysis of
requirements of website development for Wesfarmers. It will perform several duties in order to
figure out needs such as resources that will be required for project completion. Moreover, it also
analysis overall time-frame that will be required to complete specific task for better results.
User experienced designer: Moreover, it can be stated that one of the role and responsibilities
related to the project of updation in website is of user experience designer. It will responsible for
analysing, understanding and improving overall experience of people so that they can be easily
converted into customer's of firm (Heldman, 2018).
Furthermore, it can be stated that all these individual are capable of performing all other
task so that resources can be optimum utilised and activities can be achieved as per set schedule.
Schedule, cost, quality identification, management and control
Schedule: It specifies about the schedule and activities that will be incorporated by project
manager in order to make necessary updation in the website. Therefore, Gantt chart is prepared
to schedule various activities. Likewise:
information will be provided to the stakeholders that website has been developed as per planned
for growth and expansion of business in retail sector.
Project roles
Wesfarmers is organization that has planned to start a project of website development in
order to fulfil needs of customer's beyond their expectancy level. Key roles and responsibilities
that needs to be performed by each individual in the project can be stated as follows:
Project manager: It plays important role in project as will plan, organise and decide specific
task need to be complete by particular individual so that best outcome can be achieved in limited
cost and time-frame. Furthermore, it will ensure arrangement and optimum utilization of
resources by delegating and guiding team member about specific task they need to complete so
that website can be updated (Nusari and et.al., 2018).
Web developer or designer: It is another individual in the project which will play role of design
innovative, more creative website that have more facilities and options so that customer's can
easily get information and take correct decision to make purchase. So, it will be responsibilities
for development or updation of website by adding better features, colour picture with necessary
detailed related to the company.
Requirements analysis: It is team member that is mainly responsible for analysis of
requirements of website development for Wesfarmers. It will perform several duties in order to
figure out needs such as resources that will be required for project completion. Moreover, it also
analysis overall time-frame that will be required to complete specific task for better results.
User experienced designer: Moreover, it can be stated that one of the role and responsibilities
related to the project of updation in website is of user experience designer. It will responsible for
analysing, understanding and improving overall experience of people so that they can be easily
converted into customer's of firm (Heldman, 2018).
Furthermore, it can be stated that all these individual are capable of performing all other
task so that resources can be optimum utilised and activities can be achieved as per set schedule.
Schedule, cost, quality identification, management and control
Schedule: It specifies about the schedule and activities that will be incorporated by project
manager in order to make necessary updation in the website. Therefore, Gantt chart is prepared
to schedule various activities. Likewise:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser



NETWORK DIAGRAM
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Total cost need to be incurred related to implementation of the project
Expenses Amount
Marketing cost £1000
Resources expenses £500
Electricity bills £700
Research and development £1500
Wages and salaries £2000
Miscellaneous expenses £300
Total £6000
Quality identification
Quality management is an process of ensuring that all activities related to the project are
effectively design, plan and management for achievement of end objectives. It is continuous
process undertaken by manager of company in order to ensure that better experience can be
given to customer's. The project manager of Wesfarmers in order to identified quality of the
project has make use of information technologies as it helps in storing and retaining all crucial
detailed related to the project. Thereby manager will able to identified key areas which needs to
be improved so that website updation project can be made successful and company can retained
its competitive positioning in external environment. Moreover, standard objectives has been set
in order to compare whether the plan has been implemented effectively or not (Ordoñez and
et.al., 2019). Thus, it helps project manager in identifying areas that need to be improved or
activities so that project can be great success in future circumstance.
Management: It is one of the most important function of project as it involves activities related
to planning, organising and coordinating several resources so that last goals of project can be
attained. Project the manager has make use of different techniques and method in order to make
Expenses Amount
Marketing cost £1000
Resources expenses £500
Electricity bills £700
Research and development £1500
Wages and salaries £2000
Miscellaneous expenses £300
Total £6000
Quality identification
Quality management is an process of ensuring that all activities related to the project are
effectively design, plan and management for achievement of end objectives. It is continuous
process undertaken by manager of company in order to ensure that better experience can be
given to customer's. The project manager of Wesfarmers in order to identified quality of the
project has make use of information technologies as it helps in storing and retaining all crucial
detailed related to the project. Thereby manager will able to identified key areas which needs to
be improved so that website updation project can be made successful and company can retained
its competitive positioning in external environment. Moreover, standard objectives has been set
in order to compare whether the plan has been implemented effectively or not (Ordoñez and
et.al., 2019). Thus, it helps project manager in identifying areas that need to be improved or
activities so that project can be great success in future circumstance.
Management: It is one of the most important function of project as it involves activities related
to planning, organising and coordinating several resources so that last goals of project can be
attained. Project the manager has make use of different techniques and method in order to make

optimum utilization of available resources and lead success of project. Manager has planned in
advance about necessary activities that need to be complete by particular individual, will provide
necessary support and assistances so that they can easily accomplish their respective task (Sońta-
Drączkowska and Mrożewski, 2020).
Control: This is another element of project in which manager has taken crucial measure to
control various activities so that website can be updated as per desired. In order to control project
activities, manager has continuous evaluate, analysis and measure the outcome thereby planned
better measure or steps to control the same. So, controlling has helped in removing unnecessary
activities or wastage of time, capital for effective achievement of project goals.
Detailed risk analysis, control procedure and Backup plan
Risk Analysis is process that helps in identifying and analysing potential risk and their
impact on specific project. In another words, it is study of uncertain event that can be happened
in future circumstance that can caused failure or barrier in implementation of project (Blomquist,
Farashah and Thomas, 2018). Therefore, various associated risk related to project, their impact
and the way they can be mitigated by manager of Wesfarmers can be explained as follows:
Risk Chance of
occurrence
Impact The way they can be
mitigate
Underestimation of
Budget
High The impact of
underestimation of budget
it that Wesfarmers would
have limited amount of
resources to complete the
project.
Manager of Wesfarmers in
order to overcome the risk
will devote high time to set
budget for project by
considering each expenses.
Technology risk Medium Change in technology
result in negative impact
on development of
website. As may be new
method will be used to
attract customer's
(Widianti, Harihayati and
It will analysis and
understand development in
technology to reduce the risk.
advance about necessary activities that need to be complete by particular individual, will provide
necessary support and assistances so that they can easily accomplish their respective task (Sońta-
Drączkowska and Mrożewski, 2020).
Control: This is another element of project in which manager has taken crucial measure to
control various activities so that website can be updated as per desired. In order to control project
activities, manager has continuous evaluate, analysis and measure the outcome thereby planned
better measure or steps to control the same. So, controlling has helped in removing unnecessary
activities or wastage of time, capital for effective achievement of project goals.
Detailed risk analysis, control procedure and Backup plan
Risk Analysis is process that helps in identifying and analysing potential risk and their
impact on specific project. In another words, it is study of uncertain event that can be happened
in future circumstance that can caused failure or barrier in implementation of project (Blomquist,
Farashah and Thomas, 2018). Therefore, various associated risk related to project, their impact
and the way they can be mitigated by manager of Wesfarmers can be explained as follows:
Risk Chance of
occurrence
Impact The way they can be
mitigate
Underestimation of
Budget
High The impact of
underestimation of budget
it that Wesfarmers would
have limited amount of
resources to complete the
project.
Manager of Wesfarmers in
order to overcome the risk
will devote high time to set
budget for project by
considering each expenses.
Technology risk Medium Change in technology
result in negative impact
on development of
website. As may be new
method will be used to
attract customer's
(Widianti, Harihayati and
It will analysis and
understand development in
technology to reduce the risk.

Sufaatin 2018).
Communication risk Medium Communication risk
results in lack of
coordination among
individual related to
particular task that they
needs to complete in order
to achieve end goals of
the project.
Project manager in order to
mitigate communication risk
will ensure that each
individual openly
communicate with others or
there is free flow of
information.
Resources risk High The impact of resources
risk is that company
would not have sufficient
resources to meet project
needs.
Manager will make ensure
that there are sufficient
resources available for better
implementation of project.
Changes in external
environment risk
Medium There are numerous
changes in external
environment such as
covid-19, change in
customer's preferences or
technologies that will
negative impact on project
completion.
It will continuously analysis
and evaluates changes that
are happening in external
environment to effectively
cope up with them and
promote growth and success
of project (Gray and Ulbrich,
2017).
So, overall all these were major risk associated with the project of development or
updatation of website that manager has planned to overcome for better results. It has tried to put
more and more efforts to identified associated risk such as limited availability of finance,
underestimation of budget and changes in external environment. That may cause hindrance in
effective implementation of the project so it has also find alternative solution to mitigate them
for more success of project. Therefore, it can be stated that in order to overcome the risk mitigate
will acts as an back up plan for successful implementation of project.
Communication risk Medium Communication risk
results in lack of
coordination among
individual related to
particular task that they
needs to complete in order
to achieve end goals of
the project.
Project manager in order to
mitigate communication risk
will ensure that each
individual openly
communicate with others or
there is free flow of
information.
Resources risk High The impact of resources
risk is that company
would not have sufficient
resources to meet project
needs.
Manager will make ensure
that there are sufficient
resources available for better
implementation of project.
Changes in external
environment risk
Medium There are numerous
changes in external
environment such as
covid-19, change in
customer's preferences or
technologies that will
negative impact on project
completion.
It will continuously analysis
and evaluates changes that
are happening in external
environment to effectively
cope up with them and
promote growth and success
of project (Gray and Ulbrich,
2017).
So, overall all these were major risk associated with the project of development or
updatation of website that manager has planned to overcome for better results. It has tried to put
more and more efforts to identified associated risk such as limited availability of finance,
underestimation of budget and changes in external environment. That may cause hindrance in
effective implementation of the project so it has also find alternative solution to mitigate them
for more success of project. Therefore, it can be stated that in order to overcome the risk mitigate
will acts as an back up plan for successful implementation of project.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Software demonstration
In order to effectively manage the project agile methodology has been used as it is
approach that helps in planning, improvement, team collaboration. Moreover, Agile is the
effective and most the simplest process that contribute in turning vision of business into software
solutions. So, it can be stated that this methodology is mainly used for software development as
in it both demand and solution are used through collaborative efforts so that needs of customer's
can be fulfilled.
Agile methodology is more effective as it can easily response to the changing business
needs by valuing principle of flexibility and adaptability. It focused on making teams that can
easily delivered working increment so that project can be implemented in more better manner
and yield maximum benefits. Furthermore, this methodology main purpose is to provide iterative
and incremental approach for software design (Bergmann and Karwowski, 2018). Thus
customer's have more opportunities to easily look into information related to products and
services in which company deals thereby take necessary decision to make purchase for
satisfaction of their respective requirements.
The software developed or new website developed will be demonstrated to people in
order to understand and estimate whether it is able to provide them better satisfaction or not. It
will help manager of Wesfarmers in testing the website that lead in attracting and inducing
potential customers in the firm.
Moreover, the project manager has decided to make use of different digital tools in order
to effectively design the website and delivered better services to large number of individual
living in society. Such as relay that is one of the digital tool software that is used by manager of
Wesfarmers in order to design or update the website. It is tool that helps in quick remix and
resize of brand assets with respect of colour, font and picture. Canva is another tool that is used
by manager for making graphics for website so that more number of customer's can be attracted
in the firm (Blomquist, Farashah and Thomas, 2018). The project manager of Wesfarmers has
also decided to make use of Pixpa digital software tool that is all – in -one platform that helps in
creating beautiful websites in minutes. Company can easily add number of image of products
and services with their detailed in order to inform customer's about the same so that they can take
right decision.
In order to effectively manage the project agile methodology has been used as it is
approach that helps in planning, improvement, team collaboration. Moreover, Agile is the
effective and most the simplest process that contribute in turning vision of business into software
solutions. So, it can be stated that this methodology is mainly used for software development as
in it both demand and solution are used through collaborative efforts so that needs of customer's
can be fulfilled.
Agile methodology is more effective as it can easily response to the changing business
needs by valuing principle of flexibility and adaptability. It focused on making teams that can
easily delivered working increment so that project can be implemented in more better manner
and yield maximum benefits. Furthermore, this methodology main purpose is to provide iterative
and incremental approach for software design (Bergmann and Karwowski, 2018). Thus
customer's have more opportunities to easily look into information related to products and
services in which company deals thereby take necessary decision to make purchase for
satisfaction of their respective requirements.
The software developed or new website developed will be demonstrated to people in
order to understand and estimate whether it is able to provide them better satisfaction or not. It
will help manager of Wesfarmers in testing the website that lead in attracting and inducing
potential customers in the firm.
Moreover, the project manager has decided to make use of different digital tools in order
to effectively design the website and delivered better services to large number of individual
living in society. Such as relay that is one of the digital tool software that is used by manager of
Wesfarmers in order to design or update the website. It is tool that helps in quick remix and
resize of brand assets with respect of colour, font and picture. Canva is another tool that is used
by manager for making graphics for website so that more number of customer's can be attracted
in the firm (Blomquist, Farashah and Thomas, 2018). The project manager of Wesfarmers has
also decided to make use of Pixpa digital software tool that is all – in -one platform that helps in
creating beautiful websites in minutes. Company can easily add number of image of products
and services with their detailed in order to inform customer's about the same so that they can take
right decision.

CONCLUSION
From the above report it can be concluded that project management is important process
undertaken by manager to enhance brand image and market share of firm. Wesfarmers has
planned to start a project of development of websites so that more ease and conveniences can be
provided to people in online purchasing. The project management is essentials as it helps in
making the best use of available resources, effective implementation of project plan and
achievement of end outcome. Manager through effectively managing the project is able to
identified associated risk, find method or strategy to mitigate them so that Wesfarmers can grow
and expand its business operations in retail industry of Australia. Therefore, at last it can be
summarized that the software or digital tool has helped in effectively management of project
through successful completion.
From the above report it can be concluded that project management is important process
undertaken by manager to enhance brand image and market share of firm. Wesfarmers has
planned to start a project of development of websites so that more ease and conveniences can be
provided to people in online purchasing. The project management is essentials as it helps in
making the best use of available resources, effective implementation of project plan and
achievement of end outcome. Manager through effectively managing the project is able to
identified associated risk, find method or strategy to mitigate them so that Wesfarmers can grow
and expand its business operations in retail industry of Australia. Therefore, at last it can be
summarized that the software or digital tool has helped in effectively management of project
through successful completion.

REFERENCES
Books and Journals
Bergmann, T. and Karwowski, W., 2018, July. Agile project management and project success: A
literature review. In International Conference on Applied Human Factors and
Ergonomics (pp. 405-414). Springer, Cham.
Blomquist, T., Farashah, A. D. and Thomas, J., 2018. Feeling good, being good and looking
good: Motivations for, and benefits from, project management
certification. International Journal of Project Management, 36(3). pp.498-511.
Cerdeiral, C. T. and Santos, G., 2019. Software project management in high maturity: A
systematic literature mapping. Journal of Systems and Software, 148. pp.56-87.
Evdokimov, I. V., Domantsevich, V. S. and Konyhov, V. A., 2017. The use of online
applications for project management for planning in IT-management. Современные
информационные технологии, (25). pp.44-47.
Frijns, P., Van Leeuwen, F. and Bierwolf, R., 2017, June. Project management-a more balanced
approach. In 2017 IEEE Technology & Engineering Management Conference
(TEMSCON) (pp. 234-238). IEEE.
Gray, K. and Ulbrich, F., 2017. Ambiguity acceptance and translation skills in the project
management literature. International Journal of Managing Projects in Business.
Heldman, K., 2018. Project management jumpstart. John Wiley & Sons.
Koke, B. and Moehler, R. C., 2019. Earned Green Value management for project management:
A systematic review. Journal of Cleaner Production, 230. pp.180-197.
Nusari, M. and et.al., 2018. The impact of project management assets and organizational culture
on employee performance. International Journal of Management and Human Science
(IJMHS), 2(3). pp.15-26.
Ordoñez, R. E. C and et.al., 2019. A study of the critical chain project management method
applied to a multiproject system. Project Management Journal, 50(3). pp.322-334.
Sońta-Drączkowska, E. and Mrożewski, M., 2020. Exploring the role of project management in
product development of new technology-based firms. Project Management
Journal, 51(3). pp.294-311.
Books and Journals
Bergmann, T. and Karwowski, W., 2018, July. Agile project management and project success: A
literature review. In International Conference on Applied Human Factors and
Ergonomics (pp. 405-414). Springer, Cham.
Blomquist, T., Farashah, A. D. and Thomas, J., 2018. Feeling good, being good and looking
good: Motivations for, and benefits from, project management
certification. International Journal of Project Management, 36(3). pp.498-511.
Cerdeiral, C. T. and Santos, G., 2019. Software project management in high maturity: A
systematic literature mapping. Journal of Systems and Software, 148. pp.56-87.
Evdokimov, I. V., Domantsevich, V. S. and Konyhov, V. A., 2017. The use of online
applications for project management for planning in IT-management. Современные
информационные технологии, (25). pp.44-47.
Frijns, P., Van Leeuwen, F. and Bierwolf, R., 2017, June. Project management-a more balanced
approach. In 2017 IEEE Technology & Engineering Management Conference
(TEMSCON) (pp. 234-238). IEEE.
Gray, K. and Ulbrich, F., 2017. Ambiguity acceptance and translation skills in the project
management literature. International Journal of Managing Projects in Business.
Heldman, K., 2018. Project management jumpstart. John Wiley & Sons.
Koke, B. and Moehler, R. C., 2019. Earned Green Value management for project management:
A systematic review. Journal of Cleaner Production, 230. pp.180-197.
Nusari, M. and et.al., 2018. The impact of project management assets and organizational culture
on employee performance. International Journal of Management and Human Science
(IJMHS), 2(3). pp.15-26.
Ordoñez, R. E. C and et.al., 2019. A study of the critical chain project management method
applied to a multiproject system. Project Management Journal, 50(3). pp.322-334.
Sońta-Drączkowska, E. and Mrożewski, M., 2020. Exploring the role of project management in
product development of new technology-based firms. Project Management
Journal, 51(3). pp.294-311.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Widianti, U. ., Harihayati, T. and Sufaatin, S., 2018, August. Risk project management analysis.
In IOP Conference Series: Materials Science and Engineering (Vol. 407, No. 1, p.
012087). IOP Publishing.
In IOP Conference Series: Materials Science and Engineering (Vol. 407, No. 1, p.
012087). IOP Publishing.
1 out of 17
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.