SCOPE MANAGEMENT
A CASE STUDY OF NEW M5 WESTCONNEX, AUSTRALIA
1 | P a g e
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Table of Contents
Introduction......................................................................................................................................3
About the project.............................................................................................................................4
Scope Statement of New M5 WestConnex.....................................................................................4
Work Breakdown structure..............................................................................................................5
Additional information relevant to the project scope management.................................................6
Conclusion.......................................................................................................................................7
References........................................................................................................................................8
2 | P a g e
Document Page
Introduction
Scope management helps in maintaining the progression of pre-determined project activities. The
main aim of this report is to highlight the scope statement of a large and complex project named
WestConnex New M5 in Australia. The report will mention the work breakdown structure and
other significant information related to the project scope.
3 | P a g e
Document Page
About the project
The New M5 project of Westconnex is currently running and aims at constructing a new twin
underground tunnel for a motorway from Kingsgrove to St Peter's. This is the twice of M5 East
Corridor capacity and will be of nine kilometres (Westconnex, 2015). This project involves the
transformation of a waste facility into a new interchange at the city of St Peters.
Scope Statement of New M5 WestConnex
The scope statement of the project is developed for detailing the project deliverables and project
objectives. The scope statement of New M5 WestConnex is as follows:
Project name New M5 WestConnex
Project initiation July 2016
Project closure (estimated) Early 2020
Project objectives To construct a twin-underground tunnel for motorways
To reduce the interchange time of travelling up to half
To widening the current M5 East to three lanes
Project requirements Meeting with the requirements as provided in the
Environment Impact Statement
Meeting with the requirements of the Land Acquisition
(Just Terms Compensation) Act of 1991
Designing and operating cost structure as per the design
specifications
Project scope or activities Upgrading the interchange of King Georges Road
Construction of St Peter Interchange
Construction of twin underground tunnels
Project constraints Environmental constraints
Time constraints (Westconnex, 2019)
Legal constraints
Project assumptions The project will incur the total cost of $4.335 billion
Project completion by early 2020
4 | P a g e
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4,400 employment opportunities to be developed (double
than M5 corridor capacity)
Work Breakdown structure
Work Breakdown structure is a significant project management tool for managers for time and
task management. It shows what tasks are necessary for the project and when will these tasks be
completed. The WBS of New M5 WestConnex has been identified as the following:
(Figure: Work breakdown structure of the New M5 project of WestConnex)
(Source: By
https://www.westconnex.com.au/sites/default/files/newm5_commupdate_aug2015.pdf )
5 | P a g e
Document Page
Additional information relevant to the project scope management
The project of New M5 WestConnex has been aimed for facilitating relief to the millions of
roads users who deal with the huge time consumed traffics. The project will not place any impact
on the current clearways on King Street, Newtown. The tunnels will be constructed with the
facilities such as ventilation facility, water treatment and access point for an emergency. It has
been identified that the chances of delay in project completion have been minimized since all the
activities have been running as per the schedule (Mirza, et. al., 2013).
6 | P a g e
Document Page
Conclusion
Scope management is vital for the project success and it has been evident from the project of
New M5 WestConnex, Australia. The project has been experiencing scheduled working since it
clearly defined the project objectives, project deliverables, activities and constraints and other
aspects in the scope statement. Therefore, the project managers need to understand the fact that
support of the scope statement should never be underestimated.
7 | P a g e
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
References
Mirza, M. N., Pourzolfaghar, Z., & Shahnazari, M. (2013). Significance of scope in
project success. Procedia Technology, 9, 722-729.
Westconnex (2015). New M5 overview. Retrieved from:
https://www.westconnex.com.au/sites/default/files/newm5_commupdate_aug2015.pdf
Westconnex (2019). New M5. Retrieved from:
https://www.westconnex.com.au/projects/new-m5
8 | P a g e
chevron_up_icon
1 out of 8
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]