This report provides a comprehensive analysis of the WestConnex project, focusing on construction project management principles. It begins by investigating the criteria that define project success, emphasizing the role of the cost manager or Quantity Surveyor (QS) in achieving project goals. The report then delves into the importance of cost planning for building projects, highlighting its role in ensuring financial success. The discussion includes how cost planning can improve a project's financial outcomes, and how the project team can implement corrective and preventive measures to positively impact the project's trajectory. The report covers topics such as technological integration, business strategy, data tracking, and the importance of a strong team. The study also covers the benefits of cost planning, including feasibility, cost certainty, and supply chain savings. Moreover, the report examines how cost planning helps in accurate estimation, contract flexibility, and the generation of project quotes. Finally, the report investigates how the project team can affect the project's success through preventive and corrective actions, emphasizing the importance of performance measurement, and the ability to identify and mitigate risks. The conclusion summarizes the key aspects of the WestConnex project and the factors that contribute to its success.
Document Page
Running head: CONSTRUCTION PROJECT MANAGEMENT
Construction project management
(WestConnex project)
Name of the student:
Name of the university:
Author Note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1CONSTRUCTION PROJECT MANAGEMENT
Executive summary
The WestConnex is the part of prolonged integrated transport of Australian government. For
understanding the Construction project management, the WestConnex Road, the interchange and
tunnel project that has the duration from 2015 to 2024 is chosen. It is meant for Parramatta Road
having the M5 and north-south corridors. The discussion and investigation for the project success
along with the role of the cost manager and QS is discussed. Apart from this, the importance of cost
plan to develop the project is discussed here. Next, the cause why cost planning can be developed
with the finical success of the project is demonstrated here. Ultimately, the method in which the
project team is able to impact the success with preventive and corrective steps are investigated in the
study.
Document Page
2CONSTRUCTION PROJECT MANAGEMENT
Table of Contents
Introduction:..........................................................................................................................................3
Evaluating the criteria for the present project success and the role of cost manager or QS:.................3
Importance of the cost planning:...........................................................................................................4
Discussion on why cost planning develops the projects finical success:..............................................5
Analyzing the way how the project team affects success of project with corrective and preventive
measures:...............................................................................................................................................5
Conclusion:............................................................................................................................................6
References:............................................................................................................................................8
Document Page
3CONSTRUCTION PROJECT MANAGEMENT
Introduction:
Every definition of a project has been temporary. Virtually every project meets the budgets
and deadline. Nevertheless, few projects should be satisfying particular stakeholders. Again, other
people should be meeting regulatory criteria and others must gain particular return on investment.
The WestConnex is an element of long term integrated transport of Government with land use
planning solution. In this study, the WestConnex Road, tunnel and interchange projects of 2015-
2024 is chosen. This is for Parramatta Road, north-south and M5 corridors. Here, the investigating
and discussion criteria for the success project and role of QS or cost manager is demonstrated. Next,
the significance of cost planning to build projects is identified. Then, the reason why cost planning
developed the economic success of project is evaluated. Lastly, the ways the project team can affect
project success with corrective and preventive measures are analyzed.
Evaluating the criteria for the present project success and the role of cost
manager or QS:
Firstly, the technologies are to be incorporated. WestConnex’s project needs much
paperwork. Here, many agreements are there to be exchanged between the clients and the project. It
provides the permissions and ROIs to get filled. Here, the material checklists are to be retrieved.
Further, the planning is to be designed and documents of site readiness are to be filed. Besides, the
customer databases are to be maintained (Fewings and Henjewele 2019). From the construction
managers to the technical supervisor. There are communications to be done around the process.
Next, there is a solid strategy for business. The current project has been comprising of strong
business strategy for their business to rise. They consist of the method through which they are
completed or processed. The next criteria for success are tracking the data. At many times their
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4CONSTRUCTION PROJECT MANAGEMENT
information can be lost and left unattended. The miscommunications that take place between the
departments and unsuitable data tracking and processes lead to messy type of project completion
(Walker 2015). Then, it has a USP or Unique Selling Propositions. Maintaining this for the project is
the ultimate doorway for success. It is performed in many ways and attracts new clients. Investment
in these projects implies the getting of the task done with ease and less time. Ultimately, its good
team is an effective success criterion. Providing constant and quality service to customers for the
current project relies on a committed them.
Importance of the cost planning:
The first benefit is the feasibility and definition of project. This must be developed before
any development of outline designs with in-depth plans of costs to be vital. Next, there is cost
certainty. As fund authorization is granted with cost certainty is important for suitable management
of budget and risk mitigation. Next, there is accelerated process of tendering. This in detailed plans
of costs of MPL gives rise to the stage of feasibility turning as the man tool for the project. Then the
cost planning is important for supply chain savings. Next, there is cost database (Demirkesen and
Ozorhon 2017). Here, accurate and realistic budgets are to be produced. Further, the benchmarks
around the projects and developed and compared with other business. Then, it is useful to provide
auditable tendering of out-turn costs that can be monitored by performance. Next, the basis of
standardization of details and design are matched to the price. Here, better controlling of future
budgetary is spent through profiling project portfolios across the completion under one database.
Further, there is the overall life costing through modelling the data from the assets of clients that
decreases the overall expenditure of clients. Besides, time is money and cost planning can same both
money and time. Next, it involves a better project definition with client sign off (Owusu, Chan and
Shan 2019). Moreover, this has the stringer budgetary control from the feasibility of out-turn. Next,
Document Page
5CONSTRUCTION PROJECT MANAGEMENT
it consists of significant savings of programing and a decrease in the overall lifetime cost. Lastly
there is reduced administration and time of management.
Discussion on why cost planning develops the projects finical success:
Retrieving suitable estimation of a budget is complicated. It is useful for experimenting
various scenarios of projects. This lets the evaluation against articular budget and goal of
profitability. Numerous reasons are there behind cost planning to develop the financial success of the
project (Chin and Hamid 2015). This includes accurate estimation at record time. There is no
necessity of carefully planning and developing complicated schedules to receive the figure of draft
budget. Further, there are numerous types of contracts supported. Numerous projects need various
distinct kind of contracts (Siew 2016). This is the cause why cost and price provide total flexibility
to bill the kind of every project. WestConnex’s project has been supporting materials and time,
capped materials and time and fixed price and retainer projects. It also assures that the calculations
are done properly. Next, multiple scenarios are estimated and compared. The estimations are able to
evolve are the project details are gained. As the project manager of WestConnex’s project ascertains
that every requirement is accounted for, one can try various scenarios and options of resourcing. It
helps in comparing the versions easily. WestConnex’s project must go for that one which can work
best and develop the baseline (Nicholas and Steyn 2017). Lastly, project quotes are to be generated
with sharing with clients. As anyone arrives at a suitable estimation. One can simply export the
quote of the project under the breakdown of resources. Here, the statement of work or the contract
must be inserted.
Document Page
6CONSTRUCTION PROJECT MANAGEMENT
Analyzing the way how the project team affects success of project with corrective
and preventive measures:
For the project of WestConnex most of the liabilities of the team of project management and
the leaders have failed in that course. Here, the activities are there to find exactly the way how
project is falling in that course and the activities for finding how the project must proceed. Here, the
particular tasks to be done and the way they must occur is to be determined. This must involve the
working in forward-thinking way in affirmative way. Scopes are there that the project management
team and the reader must work in a case that can have negative and detrimental on the overall project
(Ferrada et al. 2016). At these cases, this can be found out by the team of project management and
the leader where preventive actions must be employed. This indicates to the activities where
documented directions are to be provided. This involves the reduction of possibility of adverse
outcomes related to project risk (Lock 2016).
On the other hand, the corrective actions are the tasks for bringing the intender further project
performance for WestConnex’s project in line with their plans. Here, the initial cause of the idea of
measurement. Here, one requires to make calculations for finding the expected and current future
performance. It is seen that not much of the individuals were found to have their performances
measured (Owusu et al. 2019). Hence, most of the project managers never tried and actually
understood how the project can be done and whether they are able to meet the requirements of the
projects. The ultimate outcome is that the project managers never have the scope and found to be
cutting the scope. They must force the group to perform overtime and consider the unethical
activities for finishing the project in due time. This should be under the project constraints and not
meet the constraints of the project. This calculation has many advantages. This permits the issues to
be caught prior they turn to be huge (Zuo et al. 2018). Apart from this, it develops the profitability
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7CONSTRUCTION PROJECT MANAGEMENT
of the success of the project lastly, it delivers the team with upgraded plan of project such that they
understand what is required for accomplishing project tasks.
Conclusion:
The above study highlights different scopes from the view of ease of construction, schedule
effects, economic benefits and standpoint of costs for WestConnex’s project. This involves the all-
essential matter of alignments having objectives of users and programme of the project. Next, the
design profession is the situation for recommending any option. As the suitable measures are
undertaken to process, the above report proposes the suitable stages for launching the design stage.
Moreover, all the facilities are custom designed and constructed. This requires long time of
completion. Here, the construction and designing of the facility should satisfy the conditions that are
peculiar to particular rate. As WestConnex’s project is site-specific, the execution must be affected
by social, natural and additional locational situations like labour building codes, labour supply and
weather and so on. As the service life of the facility is prolonged, the anticipation of further
requirements is difficult in inherent way. Due to technological complexities and demands in market,
the alterations of design plans during the phase of construction are ever common. During the
facilities of planning, it is vital to identify the core relationship between construction and design. The
measures should be seen as an integrated system for the project of WestConnex. For the project it
must be reminded that various operational activities must be done with various precedence and
relationships among distinct activities.
Document Page
8CONSTRUCTION PROJECT MANAGEMENT
References:
Chin, L.S. and Hamid, A.R.A., 2015. The practice of time management on construction project.
Procedia Engineering, 125, pp.32-39.
Demirkesen, S. and Ozorhon, B., 2017. Impact of integration management on construction project
management performance. International Journal of Project Management, 35(8), pp.1639-1654.
Ferrada, X., Núñez, D., Neyem, A., Serpell, A. and Sepúlveda, M., 2016. A lessons-learned system
for construction project management: a preliminary application. Procedia-Social and Behavioral
Sciences, 226, pp.302-309.
Fewings, P. and Henjewele, C., 2019. Construction project management: an integrated approach.
Routledge.
Harrison, F. and Lock, D., 2017. Advanced project management: a structured approach. Routledge.
Lock, D., 2016. Project Management in Construction. Routledge.
Nicholas, J.M. and Steyn, H., 2017. Project management for engineering, business and technology.
Routledge.
Owusu, E.K., Chan, A.P. and Shan, M., 2019. Causal factors of corruption in construction project
management: An overview. Science and engineering ethics, 25(1), pp.1-31.
Owusu, E.K., Chan, A.P., DeGraft, O.M., Ameyaw, E.E. and Robert, O.K., 2019. Contemporary
review of anti-corruption measures in construction project management. Project Management
Journal, 50(1), pp.40-56.
Document Page
9CONSTRUCTION PROJECT MANAGEMENT
Siew, R.Y.J., 2016. Integrating sustainability into construction project portfolio management. KSCE
Journal of Civil Engineering, 20(1), pp.101-108.
Walker, A., 2015. Project management in construction. John Wiley & Sons.
Zuo, J., Zhao, X., Nguyen, Q.B.M., Ma, T. and Gao, S., 2018. Soft skills of construction project
management professionals and project success factors: A structural equation model. Engineering,
Construction and Architectural Management, 25(3), pp.425-442.