BSBWOR404: Workplace Task Planning, Implementation, Evaluation Report
VerifiedAdded on  2020/10/22
|14
|3911
|212
Report
AI Summary
This report presents a comprehensive analysis of workplace task planning, specifically focusing on the BSBWOR404 unit. The assignment begins with the selection of a workplace task, emphasizing the need for a detailed work plan, schedule, and the involvement of team members. It then delves into confirming the suitability of the chosen task, considering factors like resource availability and stakeholder participation. The report identifies key work objectives, culminating in the development of a comprehensive work plan, including project aims, goals, objectives, and performance indicators. It also addresses the assignment of job roles and responsibilities for each team member, ensuring effective task execution. The report explores the importance of strategic choices, assessing the suitability, feasibility, and acceptability of the chosen project. The work plan outlines actions, timeframes, and resource allocation for each objective, incorporating human, physical, and financial resources. Performance indicators are established to measure the success of each objective, and the report concludes with a detailed breakdown of job roles and responsibilities within the team. The overall aim is to construct a work plan and schedule for launching a new product into the market, ensuring high profitability and productivity through effective project management.

BSBWOR404
Assessment (1 part)
Assessment (1 part)
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
1. Selection of task from workplace and it requires work plan, schedule and participation to
complete. ....................................................................................................................................1
2. To confirm suitability of choice. If you do not have access to suitable workplace and
participation of others.................................................................................................................2
3. Identification of work objectives and completion of work plan. ...........................................3
4. Assignment of job roles and responsibilities for each team member. ....................................5
1. Selection of task from workplace and it requires work plan, schedule and participation to
complete. ....................................................................................................................................1
2. To confirm suitability of choice. If you do not have access to suitable workplace and
participation of others.................................................................................................................2
3. Identification of work objectives and completion of work plan. ...........................................3
4. Assignment of job roles and responsibilities for each team member. ....................................5

1. Selection of task from workplace and it requires work plan, schedule and participation
to complete.
The main aim is to constructs the work plan and scheduled activities of workplace
in term to launch new product in market. This is need to be prepared in order to meet the
proper expectation. To effective manner it is essential to draw project management plan
as are-
ï‚· Resources- To launching of new product in market as tanning removal oil with
lemon extracts, the ABC Ltd should have enough resources so that firm can be
capable to undertake its activities proficiently. Thus, resources as are man, labour
and capital must have so that things can be done without any interruption.
ï‚· Client need- It is essential to understand the need of customers so that product
can be successfully launched and profitability of an enterprise can be maximized.
ï‚· Work group targets- In order to carry out the process effectively, it is essential
to provide the work as capability of an individual so that completion can be done
during assigned deadline. For launching of product successfully it is crucial to
divide the segments as per ability of worker and work target must be prioritised.
The group will be divided as in production, reporting and sales etc.
ï‚· Responsibilities and priorities- In this, each team worker should assigned some
authority with some amount of responsibility. The activities must be prioritised
on the basis of responsibility.
ï‚· Time and scheduling- The each task or an activity should have particular
deadline so that things can be done properly. With perfect scheduling the each
activity can be done in effectively mode.
ï‚· Contingency planning- With help of launching some sampling of product and
by targeting the audience so that feedback of customer can be gathered. This
approach will help out to process the business activities systematically.
2. To confirm suitability of choice. If you do not have access to suitable workplace and
participation of others.
During the process of strategy formulation, the firm has to faced various choices.
1
to complete.
The main aim is to constructs the work plan and scheduled activities of workplace
in term to launch new product in market. This is need to be prepared in order to meet the
proper expectation. To effective manner it is essential to draw project management plan
as are-
ï‚· Resources- To launching of new product in market as tanning removal oil with
lemon extracts, the ABC Ltd should have enough resources so that firm can be
capable to undertake its activities proficiently. Thus, resources as are man, labour
and capital must have so that things can be done without any interruption.
ï‚· Client need- It is essential to understand the need of customers so that product
can be successfully launched and profitability of an enterprise can be maximized.
ï‚· Work group targets- In order to carry out the process effectively, it is essential
to provide the work as capability of an individual so that completion can be done
during assigned deadline. For launching of product successfully it is crucial to
divide the segments as per ability of worker and work target must be prioritised.
The group will be divided as in production, reporting and sales etc.
ï‚· Responsibilities and priorities- In this, each team worker should assigned some
authority with some amount of responsibility. The activities must be prioritised
on the basis of responsibility.
ï‚· Time and scheduling- The each task or an activity should have particular
deadline so that things can be done properly. With perfect scheduling the each
activity can be done in effectively mode.
ï‚· Contingency planning- With help of launching some sampling of product and
by targeting the audience so that feedback of customer can be gathered. This
approach will help out to process the business activities systematically.
2. To confirm suitability of choice. If you do not have access to suitable workplace and
participation of others.
During the process of strategy formulation, the firm has to faced various choices.
1
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

The suitability of project can be done on basis of Suitability, Feasibility and
Acceptability. The one of the main motive is to how to choose among the several
strategic choices as are-
Suitability- At this stage, it is essential to analyse position of an enterprise and its
changes in environment. Thus, it evaluated the strategic option so that several factors and
growth opportunities in firm can be considered. In addition to this, PESTLE and 5 forces
porter will be useful to analyse core competencies, value networks, suitability and
capability (Katana and et.al., 2017).
Acceptability- In this, performance strategies is need to be measured in return, risk and
reactions of stakeholders. Returns should be calculated on the basis of benefits to
stakeholders. The effective return will determine that how workplace is able to launch
new product in market.
Feasibility- In this term it is need to recognize that firm has required resources,
capabilities and various competencies in terms to implement strategies. It is need to be
done in order to forecast and analyse the break even analyse among others. The financial
capacity of firm is need to be determined so that entity can able to undertake its activities
effectively.
Thus, the quality of choice can be determine with this three effective tool as are
suitability, acceptability and feasibility. With help of this overall things can be determine
in specific mode.
3. Identification of work objectives and completion of work plan.
Appendix 1: Work plan
Project title Launching new product as Tanning removal oil with lemon extracts.
Project aim The main aim is to constructs the work plan and scheduled activities
of my own workplace as ABC cosmetic Ltd. in term to launch new
product in market.
Goal 1 To generate high volume of profitability and productivity.
Objective 1.1 To identify the target audience so that approach can be made
properly.
2
Acceptability. The one of the main motive is to how to choose among the several
strategic choices as are-
Suitability- At this stage, it is essential to analyse position of an enterprise and its
changes in environment. Thus, it evaluated the strategic option so that several factors and
growth opportunities in firm can be considered. In addition to this, PESTLE and 5 forces
porter will be useful to analyse core competencies, value networks, suitability and
capability (Katana and et.al., 2017).
Acceptability- In this, performance strategies is need to be measured in return, risk and
reactions of stakeholders. Returns should be calculated on the basis of benefits to
stakeholders. The effective return will determine that how workplace is able to launch
new product in market.
Feasibility- In this term it is need to recognize that firm has required resources,
capabilities and various competencies in terms to implement strategies. It is need to be
done in order to forecast and analyse the break even analyse among others. The financial
capacity of firm is need to be determined so that entity can able to undertake its activities
effectively.
Thus, the quality of choice can be determine with this three effective tool as are
suitability, acceptability and feasibility. With help of this overall things can be determine
in specific mode.
3. Identification of work objectives and completion of work plan.
Appendix 1: Work plan
Project title Launching new product as Tanning removal oil with lemon extracts.
Project aim The main aim is to constructs the work plan and scheduled activities
of my own workplace as ABC cosmetic Ltd. in term to launch new
product in market.
Goal 1 To generate high volume of profitability and productivity.
Objective 1.1 To identify the target audience so that approach can be made
properly.
2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Action Action
1.1.1
In the first step, firm need to take action as to clearly
and effectively establish name of product and its brand
position in market.
Action
1.1.2
To build the awareness and creditability in terms to
new product and company. The key target audience as
youth are needed to be selected so that firm can able to
make approach towards it.
Action
1.1.3
To maintain execution as benefits oriented approach
and to address it as learn, try to buy phase of purchase.
Time frame Within the period months.
Human
resources
The one of the most core part of an enterprise are human
resource personal. They are responsible to carry out the
activities of an enterprise in effective mode so that product can
be launched successfully in market.
Physical
resources
The physical resources to an enterprise will be inclusive of
Labour, equipment and material etc. This all will be helpful in
terms to carry the process of an enterprise. In addition to this,
physical resources will be helpful to satisfy target audience in
market (Sousa-Zomer and et.al., 2018).
Performance
Indicators
Action
1.1.1
In this, firm need to analyse the both gross and net
profit margin to understands the success of an
enterprise.
Action
1.1.2
By targetting audience, the cost of product are needed
to be decided.
Action
1.1.3
I will measure it with the likings of set target audience
in market. With help of it success of product can be
easily measured.
Objective 1.2 To deliver quality products to customer on timely manner.
Action Action
1.2.1
In this, with help of taking regular feedback from
customer's, they able to enrich the growth of an
enterprise in efficient mode.
3
1.1.1
In the first step, firm need to take action as to clearly
and effectively establish name of product and its brand
position in market.
Action
1.1.2
To build the awareness and creditability in terms to
new product and company. The key target audience as
youth are needed to be selected so that firm can able to
make approach towards it.
Action
1.1.3
To maintain execution as benefits oriented approach
and to address it as learn, try to buy phase of purchase.
Time frame Within the period months.
Human
resources
The one of the most core part of an enterprise are human
resource personal. They are responsible to carry out the
activities of an enterprise in effective mode so that product can
be launched successfully in market.
Physical
resources
The physical resources to an enterprise will be inclusive of
Labour, equipment and material etc. This all will be helpful in
terms to carry the process of an enterprise. In addition to this,
physical resources will be helpful to satisfy target audience in
market (Sousa-Zomer and et.al., 2018).
Performance
Indicators
Action
1.1.1
In this, firm need to analyse the both gross and net
profit margin to understands the success of an
enterprise.
Action
1.1.2
By targetting audience, the cost of product are needed
to be decided.
Action
1.1.3
I will measure it with the likings of set target audience
in market. With help of it success of product can be
easily measured.
Objective 1.2 To deliver quality products to customer on timely manner.
Action Action
1.2.1
In this, with help of taking regular feedback from
customer's, they able to enrich the growth of an
enterprise in efficient mode.
3

Goal 2 To have use of effective machineries and equipments so it can
design properly.
Objective 1.1 To use innovative methods in terms to produce product
and services.
Action Action
1.1.1
At initial phase, it is essential to make
investment in machineries and equipments.
Action
1.1.2
To manufacture innovative products to
customer so that they get attract towards
commodities.
Action
1.1.3
With help of measuring profitability graph it
can be easily analysed that the innovation has
been done in proper manner or not.
Time-frame Within the period of 6 months.
Human
resources
In order to meet with these objectives it is essential to
have selection of right machineries and equipments.
Thus, human resource plays efficient role in term to meet
with it. This will be helpful in terms to target customer's
in market.
Physical
resources
In this, workers plays essential role in terms to carry the
whole process. The machineries and efficient labour are
required so that an enterprise can generate long term,
profitability and productivity.
Financial
resources
To purchase the machineries and heavy equipments the
need to have long termed profitability and enterprise
productivity. In this way, enterprise need to have
adequate amount of funds.
4
design properly.
Objective 1.1 To use innovative methods in terms to produce product
and services.
Action Action
1.1.1
At initial phase, it is essential to make
investment in machineries and equipments.
Action
1.1.2
To manufacture innovative products to
customer so that they get attract towards
commodities.
Action
1.1.3
With help of measuring profitability graph it
can be easily analysed that the innovation has
been done in proper manner or not.
Time-frame Within the period of 6 months.
Human
resources
In order to meet with these objectives it is essential to
have selection of right machineries and equipments.
Thus, human resource plays efficient role in term to meet
with it. This will be helpful in terms to target customer's
in market.
Physical
resources
In this, workers plays essential role in terms to carry the
whole process. The machineries and efficient labour are
required so that an enterprise can generate long term,
profitability and productivity.
Financial
resources
To purchase the machineries and heavy equipments the
need to have long termed profitability and enterprise
productivity. In this way, enterprise need to have
adequate amount of funds.
4
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Performance
Indicators
Action
1.1.1
With help of measuring gap between the
current and future innovation performance
the whole entity can undertake its activities
effectively (Sousa-Zomer and et.al., 2018). It
is one of key performance indicators which
will be helpful to measure success of an
enterprise and it helps to achieve business
objective.
Action
1.1.2
At this level if firm is maximising its
profitability than it is need to be evaluated
that what factor attract them a lot.
Action
1.1.3
I am measuring successful launching with
help of customer feedback so that if any
deviation than corrective actions can be taken
immediately.
4. Assignment of job roles and responsibilities for each team member.
In this, an enterprise need to provide roles and responsibilities as per the
capabilities of an individual so that each individual carry out the process of an entity
effectively. This is defined in below contexts.
5
Indicators
Action
1.1.1
With help of measuring gap between the
current and future innovation performance
the whole entity can undertake its activities
effectively (Sousa-Zomer and et.al., 2018). It
is one of key performance indicators which
will be helpful to measure success of an
enterprise and it helps to achieve business
objective.
Action
1.1.2
At this level if firm is maximising its
profitability than it is need to be evaluated
that what factor attract them a lot.
Action
1.1.3
I am measuring successful launching with
help of customer feedback so that if any
deviation than corrective actions can be taken
immediately.
4. Assignment of job roles and responsibilities for each team member.
In this, an enterprise need to provide roles and responsibilities as per the
capabilities of an individual so that each individual carry out the process of an entity
effectively. This is defined in below contexts.
5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Title Name Role Responsibilities
Human
resource
manager
Peter
To recruit and
select the workers
who are able to
carry out the
process of an
enterprise in
effective manner.
Without
performing
effective role by
human resource
personal the
enterprise is not
able to carry the
process the
efficiently.
In this, the responsibility of
Human resource is to
maintaining and enhancing the
organisation performance with
help of effective planning,
implementation and evaluating
the relationship among the
employees.
Finance
manager
carney The main role is
to financing the
health of an
enterprise. With
help of financial
reports, direct
investment
activities and
developing the
strategies the long
term goals of an
enterprise can be
achieved.
In this, finance manager works
as to develop budgeting,
financial reporting and
management practices so that
each things can be carried
effectively and efficiently
manner. The effective
budgeting and staffing will be
helpful to have enhancement in
long term profitability of an
enterprise.
6
Human
resource
manager
Peter
To recruit and
select the workers
who are able to
carry out the
process of an
enterprise in
effective manner.
Without
performing
effective role by
human resource
personal the
enterprise is not
able to carry the
process the
efficiently.
In this, the responsibility of
Human resource is to
maintaining and enhancing the
organisation performance with
help of effective planning,
implementation and evaluating
the relationship among the
employees.
Finance
manager
carney The main role is
to financing the
health of an
enterprise. With
help of financial
reports, direct
investment
activities and
developing the
strategies the long
term goals of an
enterprise can be
achieved.
In this, finance manager works
as to develop budgeting,
financial reporting and
management practices so that
each things can be carried
effectively and efficiently
manner. The effective
budgeting and staffing will be
helpful to have enhancement in
long term profitability of an
enterprise.
6

Title Name Role Responsibilities
Project
manager
jack In this, it can be
said that project
manager is the
person who has
responsibility in
terms to
conducting
successful,
initiation,
planning, design,
execution and
monitoring so that
targets can be
achieved.
The main responsibility of
project manager is to conduct
the meeting so that each thing
can be undertaken effectively.
Product
manager
Wales In this, it can be
determined that
product manager
is responsible in
terms to make
effective strategy,
road map and
features so that
product can
successful. This
kind of strategy
will be helpful in
terms to make
smooth working
in market.
It is the responsibility of
product manager to include
the things as are marketing,
forecasting and profitability
so that each thing can be
undertaken effectively.
7
Project
manager
jack In this, it can be
said that project
manager is the
person who has
responsibility in
terms to
conducting
successful,
initiation,
planning, design,
execution and
monitoring so that
targets can be
achieved.
The main responsibility of
project manager is to conduct
the meeting so that each thing
can be undertaken effectively.
Product
manager
Wales In this, it can be
determined that
product manager
is responsible in
terms to make
effective strategy,
road map and
features so that
product can
successful. This
kind of strategy
will be helpful in
terms to make
smooth working
in market.
It is the responsibility of
product manager to include
the things as are marketing,
forecasting and profitability
so that each thing can be
undertaken effectively.
7
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

5. Analyses and prioritize the work objectives in term to complete work.
Team member name-
Team A (carney's team)
Time Monday Tuesday Wed Friday Saturday Sunday
3 hours
To
develop a
team
To assign
task
Develop
understan
ding
related to
work
Monitori
ng
activities
Improvi
ng way
of
working
Off
8
Team member name-
Team A (carney's team)
Time Monday Tuesday Wed Friday Saturday Sunday
3 hours
To
develop a
team
To assign
task
Develop
understan
ding
related to
work
Monitori
ng
activities
Improvi
ng way
of
working
Off
8
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Team B (jack's team)
Time Monday Tuesday Wed Thursday Friday Saturday Sunday
3
hour
s
Review
the
work
Making
changes
Prioritise
the task
Assignm
ent work
Team
meeting
Discussi
on on
changes
off
Team c (Wales's team)
Time Monday Tuesday Wed Thursday Friday Saturday Sunday
3
hour
s
Designi
ng of
the
product
s
effectiv
ely
Targetin
g key
audience
in
market.
Adoptio
n of
alternati
ve price
strategy
To have
quality
tools and
techniqu
es
Feedbac
k
collectio
n from
team
members
Modific
ations if
any.
off
6. Scheduling time for work activities to ensure that work is completed efficiently and
effectively.
The whole activities is need to conduct effectively so that each things can be
planned effectively and efficiently. The each task need to be accomplished in proper
timely manner.
Task Name Duration Start Finish Predecessors
Initiation 1 day Fri 4/13/18 Fri 4/13/18
Development of initiation
phase of product 15 days Mon 4/16/18 Fri 5/4/18 1
Determine the resources of
project 10 days Mon 5/7/18 Fri 5/18/18 2
Formulating the set goals
of an enterprise 6 days Mon 5/21/18 Mon 5/28/18 2,3
Setting end goals of an
enterprise. 1 day Tue 5/29/18 Tue 5/29/18 4
Collecting the Team 15 days Wed 5/30/18 Tue 6/19/18 5
Planning 1 day Wed 6/20/18 Wed 6/20/18 6
Gathering meeting 10 days Thu 6/21/18 Wed 7/4/18 5,7
9
Time Monday Tuesday Wed Thursday Friday Saturday Sunday
3
hour
s
Review
the
work
Making
changes
Prioritise
the task
Assignm
ent work
Team
meeting
Discussi
on on
changes
off
Team c (Wales's team)
Time Monday Tuesday Wed Thursday Friday Saturday Sunday
3
hour
s
Designi
ng of
the
product
s
effectiv
ely
Targetin
g key
audience
in
market.
Adoptio
n of
alternati
ve price
strategy
To have
quality
tools and
techniqu
es
Feedbac
k
collectio
n from
team
members
Modific
ations if
any.
off
6. Scheduling time for work activities to ensure that work is completed efficiently and
effectively.
The whole activities is need to conduct effectively so that each things can be
planned effectively and efficiently. The each task need to be accomplished in proper
timely manner.
Task Name Duration Start Finish Predecessors
Initiation 1 day Fri 4/13/18 Fri 4/13/18
Development of initiation
phase of product 15 days Mon 4/16/18 Fri 5/4/18 1
Determine the resources of
project 10 days Mon 5/7/18 Fri 5/18/18 2
Formulating the set goals
of an enterprise 6 days Mon 5/21/18 Mon 5/28/18 2,3
Setting end goals of an
enterprise. 1 day Tue 5/29/18 Tue 5/29/18 4
Collecting the Team 15 days Wed 5/30/18 Tue 6/19/18 5
Planning 1 day Wed 6/20/18 Wed 6/20/18 6
Gathering meeting 10 days Thu 6/21/18 Wed 7/4/18 5,7
9

Scope of assignement 5 days Thu 7/5/18 Wed 7/11/18 8
data collection 10 days Thu 7/12/18 Wed 7/25/18 9
WBS structuring report 10 days Thu 7/26/18 Wed 8/8/18 10
Budget planning 14 days Thu 8/9/18 Tue 8/28/18 11
Execution 1 day Wed 8/29/18 Wed 8/29/18 12
Quality assurance 20 days Thu 8/30/18 Wed 9/26/18 13
Team training 10 days Thu 9/27/18 Wed 10/10/18 14
Monitoring and
controlling 1 day Thu 10/11/18 Thu 10/11/18 15
Variation and control
integration 21 days Fri 10/12/18 Fri 11/9/18 16
Monitoring of project 10 days Mon 11/12/18 Fri 11/23/18 17
Check quality 15 days Mon 11/26/18 Fri 12/14/18 18
Closure 1 day Mon 12/17/18 Mon 12/17/18 19
Evaluate the activities of
project 15 days Tue 12/18/18 Mon 1/7/19 20
modification areas 10 days Tue 1/8/19 Mon 1/21/19 21
10
data collection 10 days Thu 7/12/18 Wed 7/25/18 9
WBS structuring report 10 days Thu 7/26/18 Wed 8/8/18 10
Budget planning 14 days Thu 8/9/18 Tue 8/28/18 11
Execution 1 day Wed 8/29/18 Wed 8/29/18 12
Quality assurance 20 days Thu 8/30/18 Wed 9/26/18 13
Team training 10 days Thu 9/27/18 Wed 10/10/18 14
Monitoring and
controlling 1 day Thu 10/11/18 Thu 10/11/18 15
Variation and control
integration 21 days Fri 10/12/18 Fri 11/9/18 16
Monitoring of project 10 days Mon 11/12/18 Fri 11/23/18 17
Check quality 15 days Mon 11/26/18 Fri 12/14/18 18
Closure 1 day Mon 12/17/18 Mon 12/17/18 19
Evaluate the activities of
project 15 days Tue 12/18/18 Mon 1/7/19 20
modification areas 10 days Tue 1/8/19 Mon 1/21/19 21
10
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 14
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.