This report details a workplace risk management plan, focusing on identifying and assessing risks using both qualitative and quantitative methods. It emphasizes the importance of establishing a risk register and consulting with team members to address potential hazards, including those related to equipment, environment, and security. The report outlines strategies for mitigating risks, such as avoidance, sharing, and transferring, and highlights the roles of managers and project managers in overseeing safety protocols. It underscores the ongoing nature of risk management, with regular assessments and the need for proactive measures to ensure a safe working environment. The report also mentions the importance of feedback from employees and the implementation of appropriate safety measures to protect against potential harm.
Document Page
Task 1
What was done?
In order to identify the organisational health and safety plan, make sure to use risk identification
and risk assessment tools which in turn leads to manage the risk, to assess the risk, two methods re
used i.e. qualitative and quantitative method.
Also, for physical environment, manager should develop the risk register which in turn leads to
manage the risk. Then for work practice, make sure to determine the risk by taking feedback to
employees. In the term of security issue, also ensure to make proper exit plan and company should
offer best equipment in order to manage the things.
How were the tasks performed eg real workplace, simulation, role play
The work is perform in workplace by undertaking health and safety plan.
When was it done and over what period of time?
It was done every month and whenever new risk is faced by the firm.
Who observed the tasks being performed?
Manager or Project Manager
Task 2
What was done?
In an organisation, there are many risk face by the firm such that slip and fall from height, provide
wrong equipment etc. Thus to minimise the same, it is necessary for the project manager to consult
with entire team members in order to determine the actual results.
Moreover, all the members should report health and safety issues to project manager whenever it
arises so that proper action may be taken. Also, risk register should also be maintain so that it will
protect them from harm.
To mitigate the risk, there are four option available:
Avoidance which means to eliminate the risk
Reduction
Sharing means reduce the impact of risk through proper collaboration
Retention
How were the tasks performed eg real workplace, simulation, role play
It is perform within a workplace
When was it done and over what period of time?
It was done due to safety concern within every week.
Who observed the tasks being performed?
Manager and Project Manager
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Task 3
What was done?
To eliminate the risk 3 strategies are applied:
Avoidance: it means a person knows that the activity is harmful but still participate. So try to avoid
such activity in order to eliminate the same.
Sharing: it means consult with each other in order to generate the best results and this in turn leads
to provide the best solution.
Transferring: Risk may be varies from different areas and Project manager has to make sure that
they have expert who handle the risk or adverse situation. So, transfer the risk to assigned manager
in order to reduce the impact of risk.
How were the tasks performed eg real workplace, simulation, role play
The task is performed in the real workplace
When was it done and over what period of time?
It was done whenever company faces any risk and depend upon the type of risk which company
face.
Who observed the tasks being performed?
Project manager
chevron_up_icon