logo

2.3 CONTRACT DOCUMENTATION PHASE.

   

Added on  2020-11-02

1 Pages253 Words217 Views
2.3 CONTRACT DOCUMENTATION PHASEThe contract documentation phase is really where the details of a project’sdesign are finalized. During this portion of the project, the architect andengineer had finished the design and produced the documentation that willguide all of the stakeholders in the project to moving forward. Besides, thisphase is where all of the information gathered during the schematic designand design development phase is put together and finalized. I assisted En.Isamrisaudin Mohamed to finish the final drawing for the project.After the final drawing gets the approval by the architect. I was assigned bymy supervisor to handover the drawing to Building and Quantity SurveyorDepartment to updating the cost estimation of the project. An updatedestimation of construction costs will be generated and a meeting with theclient will be held between the architect and client. I was not fortunate to nothave the opportunity to attend the meeting because I needed to accompanymy supervisor to make an inspection at the hospital.After obtaining the approval by the client, the bidding session will be held atthe JKR office that leads by the architect. It is because the architects have abetter understanding than anyone of what the design will require from thecontractor and evaluating the results of the tenders and may be able to makea recommendation for which contractors are ideal for carrying out the design.

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
2.2 Design Development Phase - PDF
|1
|327
|81

Experienced Project Engineer in Oil & Gas Field - Mohsin Javaid Bajwa
|4
|696
|416

The nominated subcontractors Assessment 2022
|16
|3709
|54

Project Procurement Management
|11
|2387
|124

The Project Plan and Architectural Design of the Project
|11
|2594
|102

Self-Reflection Research Paper 2022
|5
|699
|27