logo

Just in Time Manufacturing System

   

Added on  2022-11-30

16 Pages1542 Words246 Views
807-Project
Logistics and
Management
Student
Institution
Date

Table of Contents
Introduction
What the problem is
Relevance and originality of the project
Relevance of the topic
Methodology chosen
Difficulties met with the methodology
Summary of observations
Summary of recommendations
Conclusion
Matters in the project but outside its scope
Transcript
Just in Time Manufacturing System
Main Aspects of the Project
References

Introduction
TPS or Just in Time (JIT) production
system (Keynes, 2017).
TPS and market demand alignment
The production process and TPS
Merits and demerits of TPS

What the problem is
o JIT in supply chain
o JIT and inventory costs
o JIT and reduction of waste
o JIT and production efficiencies
o JIT and financial/ labor costs(Roh et al.,
2014, p. 199).

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Supply Chain Analysis of Toyota Company 2022
|12
|1965
|10

The Challenge of Logistics and Supply Chain in the UK: A Study on Toyota's Just-in-Time Implementation
|38
|9331
|2

Operation Management of Toyota Motors
|10
|583
|78

Impact of Just-in-time inventory on supply chain efficiency in Mozambique's Fast Food Sector
|28
|9881
|92

Automotive Systems and Control
|7
|1650
|188

Understanding Operations, Logistics and Supply Chain Management - Toyota Automotive Company
|11
|2905
|226