First Name: <Please fill> Surname: <Please fill>
Name of the organization: First Age Private School, Abuja, Nigeria
Week #:1 to 4
Day Date Details of tasks completed during this period
5 2/04/2020 During installation of the generator in First Age Private School, Abuja, Nigeria some
issues related to generator load calculations was faced. In this stage the problem those
have been identified earlier are clearly understood by in depth and detail analysis.
6 5/04/2020 During this period the feedback given by the professor is properly analyzed. After
considering the previous problems and issues what specific changes can be incorporated to
avoid these issues again are identified in this stage
2 9/4/2020 In this stage the capstone project plan was redefined and based on those project objectives,
aims as goals are successfully set. Apart from project objectives and aim, the project
stakeholders, timeline and budget are also analyzed in this stage
2 12/04/2020 The main aspects that needs main focuses for the project are logistic plan, HR
management plan and the calculation of the load balance of the generator properly before
final installation
2 16/04/2020 In this stage the detail project skeleton or outline is prepared followed by a draft and at
the end of the 11 week the final project is submitted along with a lesson learnt document.
Certified by the supervisor/employer
I confirm that this is an accurate summary of work performed in this period
Signature: <Please fill> Name: <Please fill>
Date: 18.04.2020
Please complete Log Sheet and submit according to the assessment timeframes. The Log Sheet must
be signed by your supervisor/employer at the organisation were you are undertaking your project.
During installation of the generator_1

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Log Sheet | Employer-Based Project
|1
|391
|25

Status Report of Generator Installation
|2
|873
|23