logo

Emerging Topics in Computing

   

Added on  2022-09-14

7 Pages732 Words17 Views
Running head: IT PM
IT Project Management
Name of Student
Name of University
Author Note
Emerging Topics in Computing_1
1
IT PM
Stage 1: Project Brief-E-Taxi Project
1. Project Name
The chosen project aims in development of a mobile application through which people
can book Taxi. The name of the project is “E-Taxi Project”.
2. Project Sponsor
Please insert the name of your Teacher
3. Project Manager
Please insert your name and name of your team member
4. Problem Statement/Opportunity
Taxi is considered to be an important transportation mode yet there are very little
availability of taxis in peak hours. The undertaken project aims in development of an application
that can help in overcoming this problem, and will increase the number of taxis. The application
is basically a car pooling system that is capable of accepting the real time ride requests of the
passengers, considering the time of the service opted, the capacity of the car and the monetary
constraints.
5. Project Summary
The E-Taxi application involves development of a vehicle tracking system that will be
using GPS for vast amount of resource coordination. It is observed that finding a taxi in peak
hours can be quite difficult and therefore, the project proposes a carpooling system that will
operate as per the real time requests of the customers. Once a customer asks for a service and the
Emerging Topics in Computing_2
2
IT PM
service is confirmed, the passenger can track the taxi driver using GPS. The location of the
drivers will be relayed to the control room for taking necessary actions. This would be an easier
and an hassle free alternative to the existing taxis.
6. WBS
The work breakdown structure of the project is indicated in the table below-
WBS Task Name
0 E-Taxi Project
1 Initiation/Market Research
1.1 Understanding the Requirements
1.2 Analysis of the Market Demand
1.2.1 Analysis of the need of this application
1.2.2 Collection of Feedbacks
1.3 Documentation
1.4 M1: End of Market Research
2 Information Gathering
2.1 Analysing the project Requirements
2.2 Analysis of the current Process
Emerging Topics in Computing_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Scope Management Plan E-Taxi Company
|7
|940
|11

Project Management Plan- E Taxi Project
|11
|1439
|20

Work Breakdown Structure for Project Management Project Management
|15
|1440
|421

Project Management
|9
|2335
|172

Technical Document Template for CA1: Database Design and Development
|5
|893
|70

Mobile Based Farmer Support Application (MBFSA) Project
|9
|1316
|49