Aviation Planning Toolkit: Review, Challenges, Stakeholders, Arguments, and Decision for LHR Expansion
Added on 2022-12-16
10 Pages3630 Words42 Views
Aviation Planning
Toolkit
Toolkit
Tables of content
Tables of content.........................................................................................................................................1
INTRODUCTION...........................................................................................................................................4
MAIN BODY.................................................................................................................................................4
Task A..........................................................................................................................................................4
Review the current planning considerations taken by LHR for improving the runways and terminals. . .4
Task B..........................................................................................................................................................5
Based upon the above analysis identify and justify the most significant planning challenges impacting
LHR..........................................................................................................................................................5
Task C..........................................................................................................................................................7
Complete a stakeholder analysis of LHR’s four primary stakeholder groups...........................................7
Task D..........................................................................................................................................................7
Develop 2 key arguments from the above stakeholder perspectives in regards to the expansion plans
of LHR......................................................................................................................................................7
Task E...........................................................................................................................................................8
Finally offer a balanced and justified decision regarding the expansion plans for LHR...........................8
CONCLUSION (200)....................................................................................................................................10
REFERENCES..............................................................................................................................................11
Tables of content.........................................................................................................................................1
INTRODUCTION...........................................................................................................................................4
MAIN BODY.................................................................................................................................................4
Task A..........................................................................................................................................................4
Review the current planning considerations taken by LHR for improving the runways and terminals. . .4
Task B..........................................................................................................................................................5
Based upon the above analysis identify and justify the most significant planning challenges impacting
LHR..........................................................................................................................................................5
Task C..........................................................................................................................................................7
Complete a stakeholder analysis of LHR’s four primary stakeholder groups...........................................7
Task D..........................................................................................................................................................7
Develop 2 key arguments from the above stakeholder perspectives in regards to the expansion plans
of LHR......................................................................................................................................................7
Task E...........................................................................................................................................................8
Finally offer a balanced and justified decision regarding the expansion plans for LHR...........................8
CONCLUSION (200)....................................................................................................................................10
REFERENCES..............................................................................................................................................11
INTRODUCTION
A planning tool kit is structural method of understanding and carrying out planning for any given
field. Aviation is the industry that constitutes airlines, airports, and flight all around the world. It
is the aviation industry that is responsible for the complete processes of air travels which include
management and planning at multiple levels. Aviation planning toolkit as the name suggest is the
toolkit, i.e. a structured way of carrying out and planning the changes along with the progress of
aviation related bodies (Goodfellow and Natarajan 2021). In this report the London Heathrow
Airport is taken as a subject to carry out the planning toolkit. The LHR is one of the busiest
airport of the world with around 80 million passengers passing through its door yearly. The
planning tool kit allows the complete research and analysis of the changes and progress taking
place so that a better approach can be chosen and ultimately reaching the better conclusion and
result. In this report the planning of LHR for the improving the runway and terminal is reviewed
followed by an analysis of the most significant challenges that are impacting the LHR. Further in
the report is the stakeholder analysis of the LHR’s primary four stakeholder groups and their
arguments regarding ht expansion plan of the considered airport. Finally, included in the report is
a justified and balanced decision regarding the expansion of the airport.
MAIN BODY
Task A
Review the current planning considerations taken by LHR for improving the runways and
terminals.
Aviation industry has always been on a rise ever since its inception. With more and more
passengers travelling every year in the world of globalisation the demand of aviation services
and total air traffic is expected to increase with time. Looking at this increment in the air traffic
the traffic department of the nation began to think about the expansion of the airport in order to
meet the demand and continue the operations with ease at the airport. The planning for
improving the runways and terminal at London Heathrow Airport began with the proposal in
2006 by the department of transport of England. In this report the origin vision if the expansion
and improvement in the terminal was planned. The next year government started thinking and
considering the proposal and suggested that there should be a third runway which will be shorter
in length than the original two runways at the airport (Heyvaert 2020). In addition to this
passenger was also considered in order to meet the demand of the future. In 2009 the then
A planning tool kit is structural method of understanding and carrying out planning for any given
field. Aviation is the industry that constitutes airlines, airports, and flight all around the world. It
is the aviation industry that is responsible for the complete processes of air travels which include
management and planning at multiple levels. Aviation planning toolkit as the name suggest is the
toolkit, i.e. a structured way of carrying out and planning the changes along with the progress of
aviation related bodies (Goodfellow and Natarajan 2021). In this report the London Heathrow
Airport is taken as a subject to carry out the planning toolkit. The LHR is one of the busiest
airport of the world with around 80 million passengers passing through its door yearly. The
planning tool kit allows the complete research and analysis of the changes and progress taking
place so that a better approach can be chosen and ultimately reaching the better conclusion and
result. In this report the planning of LHR for the improving the runway and terminal is reviewed
followed by an analysis of the most significant challenges that are impacting the LHR. Further in
the report is the stakeholder analysis of the LHR’s primary four stakeholder groups and their
arguments regarding ht expansion plan of the considered airport. Finally, included in the report is
a justified and balanced decision regarding the expansion of the airport.
MAIN BODY
Task A
Review the current planning considerations taken by LHR for improving the runways and
terminals.
Aviation industry has always been on a rise ever since its inception. With more and more
passengers travelling every year in the world of globalisation the demand of aviation services
and total air traffic is expected to increase with time. Looking at this increment in the air traffic
the traffic department of the nation began to think about the expansion of the airport in order to
meet the demand and continue the operations with ease at the airport. The planning for
improving the runways and terminal at London Heathrow Airport began with the proposal in
2006 by the department of transport of England. In this report the origin vision if the expansion
and improvement in the terminal was planned. The next year government started thinking and
considering the proposal and suggested that there should be a third runway which will be shorter
in length than the original two runways at the airport (Heyvaert 2020). In addition to this
passenger was also considered in order to meet the demand of the future. In 2009 the then
End of preview
Want to access all the pages? Upload your documents or become a member.
Related Documents
Airport Planning Toolkitlg...
|13
|4032
|4
Planning Considerations for LHR Runway and Terminal Improvementslg...
|16
|5091
|128
London Heathrow Airport Expansion Planslg...
|15
|3727
|190
Airport Planning Toolkitlg...
|14
|3477
|193
Strategic Airport Planning and Developmentlg...
|8
|2272
|93
Managing Quality in Hospitality, Tourism and Events Assignment - London Heathrowlg...
|11
|2973
|142