logo

Wind Turbine Project Development Report

   

Added on  2020-02-18

8 Pages1662 Words84 Views
 | 
 | 
 | 
COMPETENCYDEMONSTRATION REPORTCareer Episode 1KUPPA KRISHNA CHAITANYA
Wind Turbine Project Development Report_1

CE 1.1 Project InformationName of the project: Small Wind Turbine ProjectLocation of the project: [PLEASE FILL]Project Duration: [PLEASE FILL]Organization: [PLEASE FILL]Role and Designation during the time: Team MemberCE 1.2 Project BackgroundCE 1.2.1 Characteristics of the projectThe small wind turbine project has been developed based on the idea of providing powerto the rural and remote areas of the world. The wind turbines would be able to be used forproviding power to different communities, homes and businesses and to miscellaneousequipment’s which are able to work on unattended operations. The small wind turbine project arebeing developed across the world and are being installed in rural settings for domestic as well aninternational market. The project was based on the theory of renewable energy. The project hasbeen developed with the special theoretical emphasis on specification, application and the windturbine concept.
Wind Turbine Project Development Report_2

CE 1.2.2 Objectives developed for the projectI had taken great care for the completion of the project by helping my team members. Ihad also helped my team members to get into meetings and understand the objectives of theworking of the project. The objectives which I had set during the process of development of theproject were as follows:To implement the small wind turbine project at the lowest cost.To provide power to the rural areas at a low cost and high production. CE 1.2.3 My area of workFor the development of the project I was responsible for the designing of the wind millthat would be responsible for main electricity power generation. I had also helped in the findingof the best motor for the wind mill which would be responsible for the production of theelectricity when the blades of the wind mill rotates. The wind mill needed to be designed in sucha way so that the size of the project should be small and the power to be generated is to be ofreasonable voltage to sustain a certain mediocre household. With these thought I had helped myteam mates in the development of the small wind mill project.
Wind Turbine Project Development Report_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents