logo

6 Windows Frame and Door Installation Completion within Given Timelines

   

Added on  2019-10-01

12 Pages1854 Words53 Views
 | 
 | 
 | 
Strategic and Operational ManagementModule UBLLXF-30-3Case StudyCoursework Assignment2019Student Name University 1
6 Windows Frame and Door Installation Completion within Given Timelines_1

Task: 1Figure: Gantt chart Yitmen, I. (2013)2
6 Windows Frame and Door Installation Completion within Given Timelines_2

Figure: Network diagram Task: 2 histogram of all labour resourcesMoveontositeSteelframeExternalwallfoundationsExternalblockwork2ndFloorBrickwork1stFloorWindows2ndFloor01234567Unnamed Series 1No.ofoperativitives3
6 Windows Frame and Door Installation Completion within Given Timelines_3

Task: 3 procedures a further construction program : Task: 4 produce a management control: As per the given specification and construction activities, the “roofing” activity is not goingaccording to project plan due to various projects and controlling issues of the construction. Theproject plan needs to complete within 26 weeks but the roofing activity may having variousissues such as assign duration of activity. The following key elements need to consider in orderto follows the standard procedure to control activity. a.setting standards : In order to provide cost effective and ensure to complete activity in given time period, estimatestandard cost and prepare time table for particular activity. b.measure actual performance : Perform quality and data analysis, in order to measure actual performance of the particularactivity and ensure the delivery possible within given time limit Ssegawa, J. (2013).4
6 Windows Frame and Door Installation Completion within Given Timelines_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents