logo

Key Studies on Safety Practices: Fire Detectors, Proceduralization, and Sustainable Workplaces

   

Added on  2023-04-24

2 Pages531 Words475 Views
Bioinformatics
 | 
 | 
 | 
Bibliography
Asif, O., Hossain, M. B., Hasan, M., Rahman, M. T., & Chowdhury, M. E. (2014). Fire-detectors
review and design of an automated, quick responsive fire-alarm system based on
SMS. International Journal of Communications, Network and System Sciences, 7(09),
386.
Bourrier, M. (2017). Trapping safety into rules: how desirable or avoidable is
proceduralization?. CRC Press.
Camuffo, A., De Stefano, F., & Paolino, C. (2017). Safety reloaded: lean operations and high
involvement work practices for sustainable workplaces. Journal of Business
Ethics, 143(2), 245-259.
Hofmann, D. A., Burke, M. J., & Zohar, D. (2017). 100 years of occupational safety research:
From basic protections and work analysis to a multilevel view of workplace safety and
risk. Journal of applied psychology, 102(3), 375.
Mobin, I., Abid-Ar-Rafi, M., Islam, M. N., & Hasan, M. R. (2016). An intelligent fire detection
and mitigation system safe from fire (SFF). Int. J. Comput. Appl, 133(6), 1-7.
Nathanael, D., & Marmaras, N. (2016). WORK PRACTICES AND PRESCRIPTIONS: A KEY
ISSUE FOR ORGANISATIONAL RESILIENCE. In Resilience Engineering
Perspectives, Volume 1 (pp. 115-132). CRC Press.
Nordlöf, H., Wiitavaara, B., Högberg, H., & Westerling, R. (2017). A cross-sectional study of
factors influencing occupational health and safety management practices in
companies. Safety science, 95, 92-103.
Key Studies on Safety Practices: Fire Detectors, Proceduralization, and Sustainable Workplaces_1

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Risk Assessment and Mitigation Plan for Chemical Shifting and Mixing Machines
|6
|465
|480

Introduction to Structural Engineering Design
|14
|783
|258

Employee Engagement and Organizational Commitment: Evidence from Jordan
|2
|781
|81

Exploring delay causes of Road Construction p=rojects in Egypt
|3
|568
|68

Performance Management System : Assignment
|6
|1800
|144

Globalization and Human Resource Management - Assignment
|6
|1782
|186