OVERVIEW OF INTERNETWORKING1Student DeclarationI/We declare that:the work contained in this assignment is my/our own work/group work, except where acknowledgement of sources is made;certify that this assessment has not been submitted previously for academic credit in this or any other course;I/we have read the MIT’s Plagiarism and Academic Misconduct Policy Procedure, and I/we understand the consequences of engaging in plagiarism; a copy of the original assignment is retained by me/us and that I/we may be required to submit the original assignment to the Lecturer and/or Unit Co-ordinator upon request;I/we have not plagiarised the work of others or participated in unauthorised collaboration when preparingthis assignment.Student Signature:Date:Student Name:
OVERVIEW OF INTERNETWORKING2Table of ContentsProject Scope...................................................................................................................................3Project hardware requirements......................................................................................................3Network Design in Netsim...............................................................................................................6Switch configuration........................................................................................................................7Router Configuration.......................................................................................................................9Conclusion......................................................................................................................................10Bibliography...................................................................................................................................11
OVERVIEW OF INTERNETWORKING3Project ScopeThe scope of the project includes the development of the network design in the casinoand it would involve the development of the effective information processing for theoperations of the organization. The development of the network servers are implied forforming the development of the two servers in the casino and it would form theimplementation of the High Speed Internet Connection for the Casino.Project hardware requirementsDevice: SwitchQuantity: 5Manufacturer’s Name: CiscoSeries: 6500Model: 6509EFeatures: MTBF: 348,935 hours (Maximum forwarding performance (IPv4): 510 Mbps)Ports: 16Device: FirewallQuantity: NAManufacturer’s Name: CiscoSeries: ASA 5500Model: 5550Features: Security Context – Up to 50, Throughput: Up to 1.2 Gbps, VPN Throughput: Up to
Found this document preview useful?
You are reading a preview Upload your documents to download or Become a Desklib member to get accesss