logo

Network Requirement Analysis & Plan

10 Pages1307 Words111 Views
   

Added on  2020-05-16

Network Requirement Analysis & Plan

   Added on 2020-05-16

ShareRelated Documents
Running head: INTERNETWORKING TECHNOLOGIESAssignment 1 - Network requirement analysis and planName of the StudentName of the UniversityAuthor’s Note
Network Requirement Analysis & Plan_1
1INTERNETWORKING TECHNOLOGIESTable of Contents1. Project Scope.....................................................................................................................................22. Project hardware Requirement.........................................................................................................23. Network Design in Netsim.................................................................................................................44. Network Device Configurations.........................................................................................................4a. Switch Configuration......................................................................................................................4Setting hostname as family name..................................................................................................4Setting system clock to 29th August 2018 5:00 pm.........................................................................4Displaying the name of the file and version of IOS........................................................................5Displaying the name of the interfaces...........................................................................................56 IOS Modes..................................................................................................................................5b. Router Configuration.....................................................................................................................6Setting hostname as the family name............................................................................................6Setting the system clock to 20th September 2018 4:45 Pm............................................................6Displaying the name of the file and the version of IOS..................................................................7Displaying the name of the interface.............................................................................................76 IOS Modes..................................................................................................................................8Bibliography...........................................................................................................................................9
Network Requirement Analysis & Plan_2
2INTERNETWORKING TECHNOLOGIES1. Project ScopeThe network solution is developed for a hospital building consisting of five floors in each of the threebuildings of the hospital. The building floor plan is used for the management of the networkframework and identification of the hardware device that are needed to be installed for thedevelopment of the network. The network points that are needed to be created for each of thedepartment should be identified for the development of the network framework. The followingscope are created for the development of the project and listed below:Development of a subnet plan for the allocation of the IP address to the network deviceinstalled in the network and reduce the wastage of the IP addressTo analyse the future growth of the organization and management of the communicationbetween the department and sharing of information between the devices connected in thenetwork.The network points should be created and different vlans should be created for each of thedepartment such that the collision in the network should be avoided and the efficiency ofthe network is improvedUse of encryption algorithm for the configuration of the wireless access point and restrictthe unwanted user to connect with the network and secure it from external agentsInstallation of server for recording the organizational information and following a namingstructure for naming the devices and protect the network from different types of networkthreats. 2. Project hardware RequirementFor the development of the network framework of the hospital the following network devices arenecessary and the detailed specification of the network device used for the development of thenetwork framework are given in the below table.Name of theDevice ManufacturerNameSeriesModelPortsCisco 2811 seriesRouterCisco2800 Series ISRCISCO2811 Cisco2811 Router2800 Series ISRAuxiliary Port x 1Console Port x 1USB port x 2Cisco 2960 Serieslayer 2 SwitchCiscoWS-C2960S-24TS-SCisco CatalystWS-C2960S-24TS-S 24-port10/100/1000switch24 Ethernet portsNetwork TopologyThe network topology is used for the management of the structure of the network solution and athree layer hierarchical model is used for the development of the network framework. The threelayers are the core, access and distribution layer. The access layer is used for the management of theswitching platform and connecting the host with the network. The distribution layer is used forfiltering and management of the network traffic. It acts as a workgroup layer and deals withdelivering the data packets to the destination address form the source address. The core layer isused for the management of the high speed connection. In this layer redundant links are created
Network Requirement Analysis & Plan_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Internetworking Technologies - PDF
|9
|787
|44

IT Networking Designing
|9
|845
|84

Advanced Network Design Name of the Student Name of the University Authors Note
|21
|3526
|196

BN321 - Advanced Network Design
|17
|1750
|35

Computer Networking | Assignment
|14
|1209
|21

Network Design for MyNetworks Company
|13
|896
|270