BSBPMG522 – March_2018 Student name: Assessor name: Date of assessment / evidence: Venue:451 PITT STREET, MANNING BLDG, HAYMARKET, SYDNEY, NSW Qualification title:10656NAT - Diploma of Enterprise Resource Planning Unit(s) of competency assessed:BSBPMG522 – Undertake Project Work Instructions to the student:Tocompletethisunit’sassessment,youarerequiredto complete all the tasks in this booklet and demonstrate specific tasks and skills. Assessment Case Studies□ Satisfactory□ Not Satisfactory□ Not Completed Instructions to the assessor To complete this unit’s assessment, the student is required to answer all questions in this booklet and demonstrate specific tasks and skills. Once the booklet is completed, you are to make the assessment decision. Please refer to the marking guidelines when making this decision. Context of AssessmentAssessment tasks will be completed in the College, including the computer lab, using provided software and documentation. Assessment outcome: (please tick to indicate)CompetentNot Yet Competent Is re-assessment required?YesNo Date of re-assessment (if applicable) Date declared competent: (if different to date of assessment) Student: Theassessmentprocess,includingassessmentinformation,competencyrequirements, student rights and appeals were clearly explained. I have been provided with feedback on my assessment and agree/disagree (delete what is not applicable) with the assessment result. Student signature: Date: Assessor: Theassessmentprocess,includingassessmentinformation,competencyrequirements,
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
BSBPMG522 – Undertake Project Work student rights and appeals were clearly explained. The assessment was valid, reliable, flexible and fair. I have provided the student with feedback on their assessment. I certify this assessment record is accurate. Assessor signature: Date: Comments: *Please see Moodle for feedback on assessment(s)* Assessment - Submission Guidelines All work must demonstrate a satisfactory standard of literacy (i.e. standard spelling and correct grammar). All assessment tasks must be submitted via Moodle Submission Link by due date i.e., two weeks after the receipt of assessment task details. Students are advised that extensions beyond the due date must be negotiated with the relevant facilitator in advance. Marked assessments will be returned with written feedback comments in the Moodle website within one week from the final submission date (at the end of the TERM). Resubmitted assessments must include the original corrected submission. Students are required to keep a soft copy of all work submitted. Please submit WORD files only Assessments not including this submission form or without student name will not be accepted Draft assessments will not be graded Read the following document, answer all the questions therein and complete all tasks required. BSBPMG522 – February_2019 Page2of23
BSBPMG522 – Undertake Project Work Project Scenario:Open a new Fitness Studio in Sydney CBD A group of investors GMSC Pty Ltd is launching a project to open a new Fitness Studio in Sydney CBD. The CFO has sponsored this new project and you has appointed you as Project Manager. GMSC is currently operating a Vocational Institute but changes in legislation for the students Visa applications are making the current market less and less profitable. GMSC is currently using part of the Manning Building 5thand 2ndfloor and will use to same premises to start the new business. After consulting the ASQA, GMSC agreed to complete the current business operations at the end of 2018 Quarter 3. The target for the new Fitness Studio is to serve people working in public and private offices in the Central Station area, from Monday-Friday. Opening hours will be between 6 AM and 8 PM. The expected offer to the customers will be: Body Building, Pilates, Yoga, Zumba and General Fitness. The project team will file in advance a Permit Request to the Council and perform all the preliminary tasks to be able to start the construction at the end of Q1. Final training is expected to start in June 2019 and the Fitness Studio to start to operate in early July. A preliminary estimation, based upon a similar project, has provided an estimation of 1.2 M$. TASK 1: General Knowledge Questions: BSBPMG515 – March_2018 Page3of23
BSBPMG522 – Undertake Project Work 1.Why is gathering requirements important in project management?Identify and describe 5 reasons. The gathering of requirements is an important aspects within project management. This is due to the following reasons: 1.Gain a foothold over the requirements of user– Based on defining of proper requirements, it would be helpful for the project team to understand the exact requirement of the user and thus act accordingly to fulfil the tasks as per the gathered requirements. 2.Develop a strategy for project development– After the requirements have been defined, a strategy should be developed. In this strategy, the proper plans of execution would be defined by the project manager. 3.Estimation of Project Budget– After the stakeholders have been defined, the project budget would be determined. 4.Defining schedule of project activities– After defining of project budget, the activities of the project would be scheduled. This would help the project team and other stakeholder to gain control over the project. 5.Determination of stakeholders– During defining of project plan, the stakeholders who would hold responsibility for performing the activities of the project would be defined and hired for the project. 2.People who are involved in or affected by project activities are? (underline the correct response) a.project mangers b.project stakeholders c.project steering committee d.organisational employees 3.Who could be the project sponsor? (underline the correct response) a.a company financially supporting then project b.a group of company stakeholders c.a key stakeholder who is responsible for reporting on the outcomes of the project d.a key stakeholder who has developed the idea for the project and is responsible to make funds available for the project 4.What are thebenefitsof Quality Assurance over Quality Control? BSBPMG522 – February_2019 Page4of23
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
BSBPMG522 – Undertake Project Work The benefits of Quality Assurance over Quality Control are: 1. The quality assurance would help in providing users with a high-quality of output over the business processes and project outcomes. 2. Quality assurance process would benefit the project team to eliminate the waste. 3. This process would also ensure customer satisfaction that would affect the brand and would help in further growth of business. 4. This process would also provide confidence and motivation for the project team. 5.Sometimes it may be important to compress your project schedule. Describe two techniques that could be applied to compress a project schedule.Clearly identify whyeachmightberequired and what effect theywillhaveon project cost/time/quality, The techniques required to compress the project schedule are: 1.Reducing the duration for each activity based on reducing of associated project risks– With the implementation of this technique, it would be easy to calculate the time taken to complete the entire project activity. 4.Reducing of project duration with the replacement of a particular team member with other person who would have greater knowledge and skill– With the reduction in project duration and increase in a skilled member, it would be helpful for increasing the quality of the project and hence increasing the positive outcomes for the project. 6.The project Control Change Process could require two approval points.Explain the reason for this approach. Two reasons for the approach are: 1. Management of a plan for back out– This approval point is highly necessary within the project to ensure that the needed changes could be performed within the project in cases where the project might get out of control. 2. Testing over the Entire Process– Different kind of changes are implemented within the test systems in order to ensure that production systems might last for a longer time. 7.What is the difference betweenresidual riskand a riskcontingency? The difference between residual risk and risk contingency are: BSBPMG515 – March_2018 Page5of23
BSBPMG522 – Undertake Project Work Risk ContingencyResidual Risks DefinitionThese risks could be the outcome for the implementation of a risk response. These risks are would remain after the response to risks have been planned. Action takenThe response plan to risks would be created A contingency plan would be created. 8.A project expected duration is 12 months and the current budget (BAC) is $240,000. The planned value profile for this project is linear (spending is the same month after month). After seven months the project figures are: CPI=0.9, SPI=0.95. Calculate the project Actual Cost (AC) after 7 months. Actual cost (AC) = Earned Value / CPI The Actual Cost (AC) of the project after 7 months is $2,66,666. TASK 2: Project Charter Name of the Project:Opening a Fitness Studio Background:The project is based on the launch a new Fitness Studio in Sydney CBD. The primary goal of the project is to serve various people who are presently working in various private and public offices. An estimation for the budget has been provided that has been set at $1.2M. Goals:The primary goal of the project are: To design a project plan for completing the design of the fitness studio To complete the project within the estimated budget and a limited time period To implement a proper training plan for the employees High Level Scope:The scope of the project is based on the design of a fitness studio. The project should be completed within a limited time period and an estimated budget. Key Stakeholders:The stakeholders of the project are: Project Manager Investors at GMSC Pty Ltd Project Milestones:The milestones for the project are: Completion of the Project Planning and Initiation Phase Completion of Design phase Completion of Execution phase BSBPMG522 – February_2019 Page6of23
BSBPMG522 – Undertake Project Work Completion of training of employees Project closure Project Budget:The budget for the project has been estimated at $1.2M. Key Risks:The key risk to the project are: The investors would not be able to fund the project due to some financial problems The project plan might not be designed within the proper time period. The employees might not get the proper training. There might be some legal risks that might affect the project Approval Signatures James ClovenRobert AldersonJohn Smith [Name], Project Client[Name], Project Sponsor[Name], Project Manager TASK 3: Project WBS BSBPMG515 – March_2018 Page7of23
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
BSBPMG522 – Undertake Project Work A.For this project collect 5 key deliverables (for example: opening hours, number of rooms, number of customers…...) and write a high level project scope (at least 200 words). The 5 key deliverables for the project are: 1. Defining of a project plan, schedule and budget 2. Preparing a plan for the design of project 3. Executing the design of the project 4. Execution of training phase of employees 5. Evaluation over the entire project Scope of the Project– The project is based on the development of a Fitness Studio. The project is based on designing a fitness studio that would be able to provide various kind of benefits to the people who would visit the store in the future. The primary target behind the development of the project is based on serving the people who would work in various private and public offices. Upon viewing the present scenario of the market, it has been seen that people in the recent times lack proper healthcare tips and thus suffer from various diseases. Hence, in order to help the people in mitigating the problems, the management team have decided to upgrade the current market and thus design a fitness studio. The various offerings listed within the organization include facilities such as: Pilates, Zumba, Body building and General Fitness methods. The fitness studio would also hire trainers who would be able to train the people in performing these activities. The project is also aimed to construct the Fitness Studio within a limited time period in order to bring the much necessary services before the people within the shortest possible time. Hence, this project would be able to incur better outcomes in the future with the inclusion of such kind of facilities. B.Identify 3 of the key deliverables and prepare for each a WBS using at least 5 break down levels. BSBPMG522 – February_2019 Page8of23
BSBPMG522 – Undertake Project Work Deliverable 1Deliverable 2Deliverable 3 Level 1Level 1Level 1 Planning PhaseDefining of a project plan, schedule and budget Approval of budget by project sponsor Level 2Level 2Level 2 Design PhasePreparing a plan for the design of project Designing the plan for the project Level 3Level 3Level 3 Execution PhasePerforming of the project task Executing the design of the project Level 4Level 4Level 4 Training to Employees Training Initiation Phase Execution of training phase Level 5Level 5Level 5 Project ClosureEvaluation over the project task Gathering feedbacks from internal stakeholders Project Title:Opening a Fitness Studio TASK 4: Communication Plan A.Identify 4 internal and 4 external stakeholders for this project. The 4 internal stakeholders of the project are: Management team, Investors, Project team members and Labours The 4 external stakeholders of the project are: Students, Business owners, People in Public Offices and People in Private Offices. B.Develop a project COMMUNICATION PLAN. Target Audience Communication NeedsMessengerMedia/ChannelFrequency People in Public Offices The communication wouldbedone by conducting a meeting with the people Training staff Face-to-Face communication High BSBPMG515 – March_2018 Page9of23
BSBPMG522 – Undertake Project Work Target Audience Communication NeedsMessengerMedia/ChannelFrequency People in Private Offices The communication would be made by conducting of aseminarwith the people. Training staff Training staffMedium StudentsThestudents wouldbe communicated by conducting a highlevel communication in the form of a separate session Training staff Training staffMedium InvestorsTheinvestors would be made tounderstand about the day to day activities for the design of the project. Project manage r E-mailreports anddirect communication High Project Title:Opening a Fitness Studio c.Hold a consultation meeting with project team members and take their views into account. To do this, pair up with 2 or more students (you will each serve as a team member for the other) and hold a meeting. Discuss your project plan, including WBS and project charter.You must upload your notes/minutes and the observation checklist signed by your Trainer. Discussion of Project Plan 1. The plan of the project is to develop a Fitness Studio that would be of great benefits to the people working in various offices, business class people and students. The project would progress as per the scheduled tasks and duration. Firstly the design of the Fitness Studio would be prepared, the service provider would be contacted, the execution phase would be BSBPMG522 – February_2019 Page10of23
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
BSBPMG522 – Undertake Project Work performed and the training to the employees would be provided. 2. The stakeholders or resources who are involved within the project would be diligent in performing their work. They would be assigned to particular job roles and would thus perform the given tasks. Marking Guide:MeetingObservation Checklist#1 Student’s Name Trainer or Observer’s NameJasmin Hill Unit of CompetenceBSBPMG522 Undertake Project Work Date of Assessment Location Demonstration TasksMeeting Materials and EquipmentNote-taking materials Tasks to be observed, demonstrated or simulated YesNoComment 1.Did the Student attend/perform the Meeting 2.Did the Student effectively interact and communicate with others? Eye Contact Body Language Appropriate language Use active listening Ask Questions Paraphrase or Summarise Take Minutes/Notes 3.Did the student cover the points outlined in the assessment guidelines for this task? 4.Comments 5.Result : S/NYS Assessor Signature: BSBPMG515 – March_2018 Page11of23
BSBPMG522 – Undertake Project Work TASK 5: Risk Register A.Identify five project risks and populate a risk register. Risk IDRISK CategoryRisk DescriptionResponsible 1Technical Risks There might be some kind of risks during defining the technical aspects of project. Development team 2Governance Risks The project manager might not be gain control over the project. This would lead to problems in relation to governing the project Project manager 3Change Management Management of various changes within the project could be of a critical aspects within the management of projects. Project manager 4Project Scope The scope of the project might exceed. There might occur some problems in defining the scope and following of changes. Project manager 5Design of Project There might be some problems in design of the project. This would mainly happen during the designing of the Fitness Studio Development team Project Title:Opening a Fitness Studio B.Using the following risk matrix calculate the risk rating BSBPMG522 – February_2019 Page12of23
BSBPMG522 – Undertake Project Work Risk IDRisk Likelihood Risk ConsequenceRisk Rating 1PossibleSignificant5 2LikelyMinor4 3UnlikelyModerate1 4Very UnlikelySignificant1 5UnlikelyModerate3 Project Title:Opening a Fitness Studio C.Apply a mitigation risk response strategy and provide a risk re- assessment for the five identified risks. Use the Red, Amber, Green approach to categorise the risks. BSBPMG515 – March_2018 Page13of23
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
BSBPMG522 – Undertake Project Work Risk ID Description of mitigation processResidual RISK Likelihood Residual Risk Impact Residual Risk Rating 1 The technical risks could be mitigated with the help of a proper plan for the project. PossibleSignificant5 2 The project manager should define a proper project schedule. They should exercise control over the project plan LikelyMinor4 3 The change management strategies should be properly defined. The project manager should thus be able to handle the various situations of changes that happen within the project. UnlikelyModerate1 4 The scope of the project should be defined properly. Each of the tasks should be performed as per the proper project management plan Very UnlikelySignificant1 5 The project manager and development team should carefully design the project in order to achieve success towards the project. UnlikelyModerate3 Project Title:Opening a Fitness Studio BSBPMG522 – February_2019 Page14of23
BSBPMG522 – March_2018 TASK 6: Project Quality A.After the opening, the Fitness Studio is facing an unexpected drop on the number of clients. Using an Ishikawa/Fishbone Diagram, identify the possible causes of this reduction. Provide at least 4 causes and 8 sub- causes. Please use a template from the web or use the provided excel template.In both cases the diagram must be attached here. (Fig 1: The Fishbone Diagram for the Problems faced within the Fitness Studio) (Source: Created by author)
BSBPMG522 – March_2018 TASK 7: Project Schedule Referring to the one of the deliverables of Task 3 create a Gantt chart. Please use excel, gantt software or Odoo to perform the task.The chart must be attached here.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
BSBPMG522 – March_2018 IDOutline Number Task Mode Task NameDurationStartFinishPredecessorsResource Names Cost 00Opening of Fitness Studio 81 daysFri 15-03-19 Fri 05-07-19 $1,202,400.00 11Start of the Project 1 dayFri 15-03-19Fri 15-03-19$0.00 22Planning Phase5 daysMon 18-03-19Fri 22-03-19$58,800.00 32.1Defining of a project plan, schedule and budget 5 daysMon 18-03-19 Fri 22-03-191$58,800.00 42.1.1Design of a proper project plan 3 daysMon 18-03-19 Wed 20-03-19 1Project Manager $34,800.00 52.1.2Approval of budget by project sponsor 2 daysThu 21-03-19 Fri 22-03-194Project Sponsor $24,000.00 62.1.3Completion of planning phase 0 daysFri 22-03-19Fri 22-03-195$0.00 73Design Phase11 daysMon 25-03-19Mon 08-04-19$128,400.00 83.1Preparing a plan for the design of project 11 daysMon 25-03-19 Mon 08-04-19 $128,400.00 93.1.1Designing the plan for the project 9 daysMon 25-03-19 Thu 04-04-19 6Project Manager $104,400.00 103.1.2Approval of project design plan 2 daysFri 05-04-19Mon 08-04-19 9Project Sponsor $24,000.00 113.1.3Completion of design phase 0 daysMon 08-04-19 Mon 08-04-19 10$0.00 124Execution Phase53 daysTue 09-04-19Thu 20-06-19$913,200.00 134.1Performing of the project task 53 daysTue 09-04-19 Thu 20-06-19 11$913,200.00 144.1.1Executing the design of the project 33 daysTue 09-04-19 Mon 27-05-19 11Labours,Project Manager $726,000.00 154.1.2Performing tests over the project 9 daysTue 28-05-19 Fri 07-06-1914Labours$93,600.00 164.1.3Making the necessary amendments 9 daysMon 10-06-19 Thu 20-06-19 15Labours$93,600.00 174.1.4Completion of Execution Phase 0 daysThu 20-06-19 Thu 20-06-19 16$0.00 185Training to Employees 5 daysFri 21-06-19Thu 27-06-19 $44,000.00 195.1Training Initiation Phase 5 daysFri 21-06-19Thu 27-06-19 17$44,000.00 205.1.1Execution of training phase 5 daysFri 21-06-19Thu 27-06-19 17Trainers$44,000.00 215.1.2Completion of training phase 0 daysThu 27-06-19 Thu 27-06-19 20$0.00 226Project Closure6 daysFri 28-06-19Fri 05-07-19$58,000.00 236.1Evaluation over the project task 6 daysFri 28-06-19Fri 05-07-1921$58,000.00 246.1.1Gathering feedbacks from internal stakeholders 5 daysFri 28-06-19Thu 04-07-19 21Project Manager $58,000.00 256.1.2Initiation of Fitness Studio 1 dayFri 05-07-19Fri 05-07-1924$0.00 266.1.3Completion of Project Closure Phase 0 daysFri 05-07-19Fri 05-07-1925$0.00 277End Project0 daysFri 05-07-19Fri 05-07-1926$0.00 Project Manager Project Sponsor 22-03 Project Manager Project Sponsor 08-04 Labours,Project Manager Labours Labours 20-06 Trainers 27-06 Project Manager 05-07 05-07 WTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMT 11 Mar '1918 Mar '1925 Mar '1901 Apr '1908 Apr '1915 Apr '1922 Apr '1929 Apr '1906 May '1913 May '1920 May '1927 May '1903 Jun '1910 Jun '1917 Jun '1924 Jun '1901 Jul '1908 Jul '19 (Fig 2: The Gantt Chart for the design of Fitness Studio) (Source: Created by author)
BSBPMG522 – March_2018 TASK 8: Project Budget Referring to the one of the deliverables of Task 3 create a related Budget. You can use the provided template.The chart must be attached here (you can upload one file only). Assumptions: Duration 1 week (each task) Working hours 8/day Labour cost 45$/hr Simulate material cost, heads, travel and other costs Executing the design of the project726000 Performing tests over the project93600 Making the necessary amendments93600 Total Cost for the project913200 Execution Phase for the project (Fig 3: Execution Phase for the Project) (Source: Created by author) IDResource NameTypeMaterial LabelInitialsGroupMax. Units Std. RateOvt. RateCost/UseAccrue AtBase Calendar 1Project ManagerWorkP100%$1,450.00/hr$0.00/hr$0.00ProratedStandard 2Project SponsorWorkP100%$1,500.00/hr$0.00/hr$0.00ProratedStandard 3LaboursWorkL100%$1,300.00/hr$0.00/hr$0.00ProratedStandard 4TrainersWorkT100%$1,100.00/hr$0.00/hr$0.00ProratedStandard (Fig 4: Execution Phase for the Project) (Source: Created by author)
BSBPMG522 – Undertake Project Work IDOutline Number Task Mode Task NameDurationStartFinishPredecessorsResource Names Cost 00Opening of Fitness Studio 81 daysFri 15-03-19 Fri 05-07-19 $1,202,400.00 11Start of the Project 1 dayFri 15-03-19Fri 15-03-19$0.00 22Planning Phase5 daysMon 18-03-19Fri 22-03-19$58,800.00 32.1Defining of a project plan, schedule and budget 5 daysMon 18-03-19 Fri 22-03-191$58,800.00 73Design Phase11 daysMon 25-03-19Mon 08-04-19$128,400.00 83.1Preparing a plan for the design of project 11 daysMon 25-03-19 Mon 08-04-19 $128,400.00 124Execution Phase53 daysTue 09-04-19Thu 20-06-19$913,200.00 134.1Performing of the project task 53 daysTue 09-04-19 Thu 20-06-19 11$913,200.00 144.1.1Executing the design of the project 33 daysTue 09-04-19 Mon 27-05-19 11Labours,Project Manager $726,000.00 154.1.2Performing tests over the project 9 daysTue 28-05-19 Fri 07-06-1914Labours$93,600.00 164.1.3Making the necessary amendments 9 daysMon 10-06-19 Thu 20-06-19 15Labours$93,600.00 174.1.4Completion of Execution Phase 0 daysThu 20-06-19 Thu 20-06-19 16$0.00 185Training to Employees 5 daysFri 21-06-19Thu 27-06-19 $44,000.00 195.1Training Initiation Phase 5 daysFri 21-06-19Thu 27-06-19 17$44,000.00 205.1.1Execution of training phase 5 daysFri 21-06-19Thu 27-06-19 17Trainers$44,000.00 215.1.2Completion of training phase 0 daysThu 27-06-19 Thu 27-06-19 20$0.00 226Project Closure6 daysFri 28-06-19Fri 05-07-19$58,000.00 236.1Evaluation over the project task 6 daysFri 28-06-19Fri 05-07-1921$58,000.00 277End Project0 daysFri 05-07-19Fri 05-07-1926$0.00 T 11 Mar '19 (Fig 5: Entire schedule and duration of each tasks within the Project) (Source: Created by author) BSBPMG515 – March_2018 Page19of23
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
BSBPMG522 – Undertake Project Work TASK 9: Change Request After 6 months from the start of the project, you realised that a key task is missing. The task will deliver a significant impact in terms of scope, budget and schedule. Pleaseprovide an exampleand prepare a project change request. As project Manager, you willreject the proposed change: please provide a clear explanation. Project Change Request Issued byGMSC Pty Ltd Description and reasonThe changes to the project that have been described have been based on implication of technical needs. There have been some changes that have been made to implementing new strategies to design the Fitness Studio. However, the proposed changes would increase the budget and lead to delay in project delivery. Hence, the project schedule and budget cannot be changes. Impact on scopeChanges in the project would lead to changes in the scope of the budget in terms of scope creep, budgetary changes and increase in time for delivery of project. Impact on budgetThe budget for the project would increase. Impact on scheduleThe project schedule would need to get changed. This would thus lead to delay in project delivery. Impact on the Risk Register The risks for the project would change and thus lead to severe risks that might impact the project. Change authorised:YES Reason: NO Reason:Due to lack of budget and extension of delivery date DateDate: 16/08/2019 Project Title:Opening a Fitness Studio Project Sponsor: Robert Alderson Project Manager:John Smith BSBPMG522 – February_2019 Page20of23
BSBPMG522 – Undertake Project Work TASK 10: Project Finalisation and Review Hold a meeting to review the project and obtain necessary sign- offs.To do this, pair up with 2 or more students (you will each serve as a team member for the other) and your trainer (as project sponsor) and hold a PIR and project finalisation meeting. Discuss your project plan, any issues that arose in the project and project delivery and lessons learned from the project.You must upload your notes/minutes of project lessons learned and the observation checklist (below) signed by your Trainer. Discussion of the Project Plan: 1. After the training session has been done, it could be concluded that the training provided to each of the employees would be beneficial for providing better kind of services to the clients. 2. The project has been successfully accomplished. Each of the project activities has been successfully met and the objectives have been clearly defined. 3. The project has been delivered within the given provided time frame. All the resources were able to help in completing the tasks within the given time frame and within the estimated budget. Marking Guide: MeetingObservation Checklist #2 Student’s Name Trainer or Observer’s NameJasmin Hill Unit of CompetenceBSBPMG522 Undertake Project Work Date of Assessment Location Demonstration TasksMeeting Materials and EquipmentNote-taking materials Tasks to be observed, demonstrated or simulated YesNoComment 6.Did the Student attend/perform the Meeting 7.Did the Student effectively interact and communicate with others? Eye Contact Body Language Appropriate language Use active listening Ask Questions Paraphrase or Summarise Take Minutes/Notes 8.Did the student cover the points outlined in the assessment guidelines for this task? BSBPMG515 – March_2018 Page21of23
BSBPMG522 – Undertake Project Work Bibliography Aicher,T.J.,Paule-Koba,A.L.andNewland,B.,2019.Sportfacilityandevent management. Jones & Bartlett Publishers. Braglia, M. and Frosolini, M., 2014. An integrated approach to implement project management information systems within the extended enterprise.International Journal of Project Management,32(1), pp.18-29. Fleming,Q.W.andKoppelman,J.M.,2016,December.Earnedvalueproject management. Project Management Institute. Harrison, F. and Lock, D., 2017. Advanced project management: a structured approach. Routledge. Hopkin, P., 2018.Fundamentals of risk management: understanding, evaluating and implementing effective risk management. Kogan Page Publishers. Kendrick, T., 2015.Identifying and managing project risk: essential tools for failure- proofing your project. Amacom. Serra, C.E.M. and Kunc, M., 2015. Benefits realisation management and its influence on project success and on the execution of business strategies.International Journal of Project Management,33(1), pp.53-66. Siu, M.F.F., Lu, M. and AbouRizk, S., 2015. Resource supply-demand matching schedulingapproachforconstructionworkfaceplanning.Journalofconstruction engineering and management,142(1), p.04015048. Skinner, S., 2014. Skinner Fitness Limited: wellness centre business plan. Smith, N.J., Merna, T. and Jobling, P., 2014.Managing risk in construction projects. John Wiley & Sons. BSBPMG515 – March_2018 Page23of23