Introduction to the Built Environment and Northern Powerhouse Rail Construction
Verified
Added on  2023/06/06
|13
|3923
|417
AI Summary
This report discusses the sectors of the built environment, with a focus on the Northern Powerhouse Rail construction project in the UK. It covers the project's background, life cycle, and the professionals and professional bodies involved. Additionally, it explores the benefits of the construction industry to the UK economy and local communities.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
INTRODUCTION TO THE BUILT ENVIRONMENT
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents INTRODUCTION...........................................................................................................................3 MAIN BODY..................................................................................................................................3 Sectors of built environment and the project...............................................................................3 Northern Powerhouse Rail construction......................................................................................4 Professionals and Professionals bodies involved in Northern Powerhouse Rail construction project..........................................................................................................................................6 Benefits of construction industry to the UK economy and local communities...........................8 CONCLUSION..............................................................................................................................10 REFERENCES................................................................................................................................1
INTRODUCTION Built environment basically refers to the surroundings that are human made and provide settings for the human activities in particular, ranging in the scales from the parks and buildings or even the green space that is within the neighbourhoods as well as the cities which often involve the infrastructure that is supporting like the energy networks or the water supply in particular (de Valence., 2018). Built environment mainly includes the physical parts in the regions of living or working of individuals. His environment in particular is a major influence to the levels of the physical activities of an individual or person. This topic is taken because in the present environment it is very necessary to give relevance to such a topic. This topic in particular includes the encompassing of the buildings that the people of the society live in the roads and the railway lines they use for travelling, the electricity and the water and the other transportation systems too. Hence, the topic is very essential to be researched as well as evaluated in detail. And that is what is done in the essay below. This report in particular discusses regarding a specific project of building of railway lines in the United Kingdom. The project is briefly discussed in the first segment of the report. Then the sector in which the project that is selected is categorized in is provided and a detailed background of the project in particular is also given below. Also, the date of starting of the project and the end of the project is also given below. Next, it also provides information regarding the project life cycle. The roles as well as the responsibilities of the professional bodies that were involved in the project in particular and their contribution in the completion of the overall project is also mentioned below. MAIN BODY Sectors of built environment and the project The construction industry in particular is one of the fastest growing industry that has grown and developed a lot over the last decade. The construction industry is basically divided into three major sectors, these sectors are namely, infrastructure, industrial and buildings. The buildings' construction mainly focuses on the process of the addition of the structures to the areas of land. Typical activities of construction are undertaken either by the owner or by the person or governmental body who has compulsorily bought the land from the owner. This construction is further categorized into non- residential and residential construction. Industrial construction is comparatively a smaller aspect of the overall construction industry in particular. Industrial construction mainly involves the off shore construction in particular (Donaubauer. Meyer. and
Nunnenkamp., 2016). Such as mining, chemical processing, mills, power generation, etc. Infrastructure constructions in particular refers to the construction of the highways, bridges, railways, public works, etc. It is also known as the heavy or the civil engineering in particular. All these sectors work in different dimensions of the society. Each of the sectors or the aspects are equally important or necessary for the individuals living in the society and the companies or the businesses that work in the society or the environment as well. The Northern Powerhouse Rail construction project is a very big project in the history of construction industry of the United Kingdom in particular (Raikes., 2019). This a major and very essential rail programme that is designed for the purpose of substantial enhancement of the economic potential of Northern England. This programme is regarding the new as well as the significantly railway lines that require to be upgraded. The major aim of the project was to transform the railway services between the towns and the regions that it was covering in the overall journey of the train. Northern Powerhouse Rail construction The project that has been selected in particular which is Northern Powerhouse Rail construction project comes under the infrastructure construction in particular. This is because the projectisrelatedtotheconstructionoftherailwaytracksandthedevelopmentorthe enhancement of the overall rail services that is provided in the regions as well as the towns that it covers in particular (Martin. and Gardiner, 2018). This is the reason why it is categorized under the infrastructure construction specifically. The project mainly aims at improving the public transportation facilities and the journey times in between the major cities that are located in Northern England in particular. The railway connections before the project started were slow and improvisation was required necessarily. The construction of this railway line will support or allow the commuters to be able to travel more freely to work and will also allow these cities to become one big economy and further compete together rather than having competition against each other. This will not only help the individuals but also help in the enhancement of the economic conditions of the United Kingdom which will further lead to better society and lifestyles. Hence, it is not made for a single purpose, it has many reasons to be constructed in particular. The project of Northern Powerhouse Rail construction was launched in the year 2016 in the month of September in particular (Headlam., 2019). The project has been completed in
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
several aspects but certain aspects are still to be worked upon. Hence, the project is still ongoing. The ending date of the project which means the estimated year in which the project is stated to end that is provided by authentic sources is stated to be 2030. The steps or the phases in which a particular construction project depends upon the sector of the project in particular. In this case, the project comes under the infrastructure construction in particular. The major phases of the project in particular are, firstly, the scoping studies, this can also be stated as the planning stage of the project in particular. In this stage plans regarding the finances used, the inception as well as the execution of the project are developed. Activities that are involved in this step are development of aims and the objectives of the project. Preparation of the budget and preparing a list of resources that are required for the completion of the project in particular. The next step is to conduct a feasibility study, the activities that are to be done in this are organizing the efficient as well as proficient human and technological resources for the task, then further providing them the required resources for effective evaluation procedures and further in accordance to the requirement of the project select the best and most suitable service providers. The project life-cycle is basically a sequence in which a particular project is to be conducted (Heralova., 2017). Majorly there are five stages of a project life- cycle in particular. These are initiating, then planning, then executing, monitoring and lastly closure of the project. In the initiation stage of the project life- cycle in particular the project is started or initiated, which means it is confirmed that the project is going to be conducted and the aims as well as the objectives of the project are decided and the purposes too. In this project also all these aspects were considered in the initiation step of the project. Next, is the planning stage or phase, in this stage the plans regarding the resources required and the budgeting is done. The resources that were majorly required for this project are human, technological, financial, equipments and other basic resources. Next, is the execution stage, in this phase the plans that are prepared in the planning stage are worked upon to be achieved efficiently and the overall project is moved towards the objectives that are prepared in the initiation stage as well. The execution refers to starting of the physical activities and tasks in the project, which here means evaluation of the tracks and construction of the railway lines. Next, is monitoring, which means overviewing at certain time durations, to check if the project is going in the right direction or not.
Professionals and Professionals bodies involved in Northern Powerhouse Rail construction project Theinvolvementofprofessionalsandprofessional’sbodiesplayvitalroleinthe construction projects successful completion, deliverables and milestone achievement. In the successfulcompletionofNortherPowerhouseRailconstructionproject,thefollowing professionals and professional bodies are involved such as: Project Manager or controller:The project manager or controller is the professionals involve in the construction that are required to manage and control the each and every phase of construction life cycle. The various roles and responsibilities of project manager or controller are as follows: They are responsible for developing project strategy, undertaking rail construction planning, and adopting the methods of project management to optimize future outcomes. They are also responsible for scheduling each task and activities of rail construction projects including development, maintaining and maintenance. The role of project manager or controller is to estimate the risk associated with the construction projects and adopting the ways to minimize the risk such as cost overrun etc. They are responsible for earned value management, earned schedule with the use of work breakdown structure, Gantt chart etc. Architect: The architects are also professional artists which involve in the construction of NorthernPowerhouserail.Forexample,RoyalInstituteofBritishArchitectsinvolvein construction of Northern Powerhouse Rail. The roles and responsibilities of architect are as follows: They are responsible for leading and developing designs of Northern powerhouse rail from early concept via design development. Further, they are also responsible for preparing drawings, construction document as well as the specification documents of Northern Powerhouse rail. The role of architect includes designing of infrastructure projects and consult with the clients to determine their requirements. They also liable to work with the teams during each phase of project life cycle to ensure the proper designing and construction of Northern Powerhouse rail.
The architect also modifies plans as per client needs. Quality Surveyor: The quality surveyor is also a professional person that involve in the construction of infrastructure projects. For example, Royal Institute of Chartered Surveyor (RICS) is the professional body of UK involve in the construction of Northern Powerhouse Rail. The roles and responsibilities of quality surveyor professional and professional’s bodies are as follows: They are responsible for preparing tender and contract documents such as assessing bills of quantities with the client. They are also requiring to undertake cost analysis for repair and maintenance of project work such as Northern Powerhouse Rail. The role of quality surveyor also involves performing risk, value management and lastly controlling cost. To manage the overall quality of material and resources used for rail construction, the quality surveyor (QS) is responsible. The QS is also responsible for maintaining awareness of Northern Powerhouse rail contract. Engineer: They are the civil engineers that design and implement the large infrastructure and buildings projects. For example, the Institute of Civil Engineers (ICE) is professional body involve in construction of Northern Powerhouse Rail. The roles and responsibilities of engineers are as follows: They are basically responsible for planning and designing stage of construction of rail projects. They are required to collaborate with the project managers with the aim to preparing work schedules. Their role also includes liaising between the contractors, subcontractors, supplier etc. to complete the work on time. They also require to manage and control the overseeing construction engineering process.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Financial manager or budget planner: The financial budget planner is a professional that should be involve in the construction projects. The roles and responsibilities of budget or financial planner within the construction industry are as follows: Their primary role of financial manager in construction is to advise the company’s management to meet financial goals. The financial manager is requiring to work with the banks and financial institution with the aim to arrange the funds for projects. Their role also includes working with legal and regulatory issues. They are responsible for tracking income and expenses accurately during the whole process. The financial manager of Northern Powerhouse rail is also responsible for monitoring the key performance indicators as well as analysing the financial trends based on past data. Managing liquidity and cash flow along with preventing the finance from theft and fraud is the key responsibility of finance manager in construction. Government advisory body: The government advisory body is also one of the professional’s bodies that involve in the construction of National Powerhouse Rail infrastructure project. Their roles and responsibilities are as follows: The advisory board are responsible for conducting public sessions and noticed in accordance with state law. They require to act as a resources for executives. Thegovernmentadvisorybodyisalsoresponsibleformonitoringtheoverall performance of construction project throughout the project life stages. It has also responsible for providing proper recommendations such as collaboration between TfN and HS2. Benefits of construction industry to the UK economy and local communities Four social benefits of construction industry to the local community of UK:
Promoting better living conditions for people: Due to the construction of Northern Powerhouse rail, the construction company are able to bridge the gap between the people from one place to another place. This ultimately improves the standard living of people of UK. For example, with the help of strategic rail program, the government of UK able to provide effective and efficient rail connectivity between the major economic centres of North. Attracting tourist: The rise of the construction industry provides the benefits of rise in the tourist all over the country. For example, previously tourist in UK are unable to visit one central area of Norther UK to another central area. Now with the help of rail program, the tourists along with people, communities and businesses are easily connecting different places of North without any difficulty. This is one of the fastest and reliable service across entire region. Community engagement: The construction industry is also beneficial for enhancing the engagement of businesses in the local community. The impact of which local community able to achieve its sustainable goals. It also beneficial for building the better relationship and connection between the construction businesses and local community. Reducing greenhouse gases: This is also one of the social benefit of construction projects to the local community. The local community is highly involving in reducing the greenhouse gases with the help of which the negative impact of climate change on environment and health of individual get reduced. For example, the infrastructure project of Norther powerhouse has benefited in reducing greenhouse gases as clean energy and public transit can reduce the same. It helps increasing cities resilience to climate change which further improve health and safety of people living and residing in UK. Four financial benefits to the construction industry to UK economy: Government revenue and GDP contribution: This is also one of the social benefits which indicatethat the construction industry helps in generatingthe revenue and economic growth of the country. It means because of the rail project in Northern UK, the economic growth of UK has increased along with government revenue which they further used for the welfare of people. The construction industry contributes £90 million to the UK economy in the year 2021.
ï‚·Increases employment rate: The new construction projects also socially beneficially because it helps in increasing the employment rate of country. For example, because of the Northern Powerhouse rail project starter in 2013, the employment rate of UK was increased by 12% in that year. The people living in country get job opportunities because of construction projects. The industry has provided around 2.93 million jobs to the individual of UK which is equal to 10% of total UK employment in the year 2021. ï‚·Increase in production and productivity: It is also helpful in increasing the production and productivity of business goods and products. It is because infrastructure ensures easy movement of goods which leads to increase in quality goods production. ï‚·Reduce transaction and trade cost: This is also one of the financial benefits that construction projects or industry provide to the economy of UK. It is because due to the infrastructure development and rail construction, the country able to move goods and people from one place to another place in minimal cost. The impact of which the overall budget expenditure reduces and budget revenue increases which leads to budget surplus. Thetradecostof UKisalsoreducingdueto NorthernPowerhouse railtoUK government which leads to economic development. CONCLUSION The purpose of doing this project in particular is the importance built environment has on the present construction industries of the world in particular. In the current situations this is one of the most necessary parts that is to be considered by the companies mainly that work in the construction sector of the society or the environment in particular. The major purpose is also to impact the environment in a positive manner rather than impacting it in the negative manner. Which will further lead o moving towards a sustainable society or environment which will further be beneficial for the natural environment as well as the human beings living in this environment in particular. The above report mainly discusses regarding the project of Northern Powerhouse Rail construction that took place in the UK. It was a very big project which impacteddifferentaspectsofthesocietyindifferentways.NorthernPowerhouseRail construction is a railway line between Manchester and Sheffield in particular. The report basicallydiscussesregardingthe sectorin which thisparticularprojectfallsin andthe background of the project. Further the starting and the ending dates of the project are stated in
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
the report as well. And the project life cycle is also discussed above. Further, the essay has also summarised the roles and responsibilities of the professional bodies involve in the construction of Northern Powerhouse rail in UK. The various professional bodies discussed in this essay include engineer, architect, surveyor, National Infrastructure commission of UK, government, Manchester city council, project manager, designer etc. In addition, it has been also summarised the four social as well as financial benefits of construction projects or industry to local community and economy of UK respectively.
REFERENCES Books and journals Ansari, R. and et.al., 2022. Decision Support System for Analyzing Key Performance Indicators inConstructionProjectsManagement.InternationalJournalofEngineering.35(5). pp.865-874. MELENDEZ, J. R., MALVACIAS, A. M. and ALMEIDA, A., 2018. Importance of the participationoftheemployeeintheexecutionofprojects:Management perspectives.Revista Espacios.39(14). Yuan, G. and et.al., 2021. The Whole Process Research On Distribution Network Construction Projects Management Based On Information Management and Control. InE3S Web of Conferences(Vol. 257, p. 02095). EDP Sciences. Raikes, L., 2019. Transport Investment in the Northern Powerhouse. Winch, G. M. and Msulwa, R., 2019. Building the Northern Powerhouse: The role o f Infrastructure Owners and Operators.Infrastructure@ Manchester, Manchester. Mackinnon, D., 2021. Governing uneven development: The Northern Powerhouse as a ‘state spatial strategy’.Territory, Politics, Governance.9(5). pp.613-635. Wray, I., Thrower, D. and Steer, J., 2020. High Speed Rail in Northern England Tactics and PoliciesforImplementingMegaPlansbyModularIncrementalism.Built Environment.46(3). pp.466-484. O’Brien, P. and Pike, A., 2019. ‘Deal or no deal?’Governing urban infrastructure funding and financing in the UK city deals.Urban Studies.56(7). pp.1448-1476. Georgiadou, M. C., 2019. An overview of benefits and challenges of building information modelling (BIM) adoption in UK residential projects.Construction Innovation. de Valence, G., 2018. Reframing construction within the built environment sector. Engineering, Construction and Architectural Management. Donaubauer, J., Meyer, B.E. and Nunnenkamp, P., 2016. A new global index of infrastructure: Construction, rankings and applications. The World Economy. 39(2). pp.236-259. Raikes, L., 2019. Transport Investment in the Northern Powerhouse. Martin, R. and Gardiner, B., 2018. Reviving the ‘Northern Powerhouse’and spatially rebalancing the British economy: the scale of the challenge. In Developing England’s North (pp. 23- 58). Palgrave Macmillan, Cham. 1
Headlam, N., 2019. An Underpowered Northern Powerhouse: Infrastructure in the Ungovernable North1. In The North East After Brexit: Impact and Policy. Emerald Publishing Limited. Heralova, R.S., 2017. Life cycle costing as an important contribution to feasibility study in construction projects. Procedia engineering. 196. pp.565-570. Zelentsov,L.B.andet.al.,2019,December.Theorganizational-technologicaldecisions acceptance support system in the investment and construction projects management. InIOP Conference Series. Materials Science and Engineering(Vol. 698, No. 7). IOP Publishing. 2