logo

System Development Life Cycle for Gold-Cinema System

30 minutes test comprising of multiple-choice questions

13 Pages2534 Words59 Views
   

Added on  2023-01-12

About This Document

This report discusses the system development life cycle for the Gold-Cinema system, including the planning, analysis, design, coding, testing, implementation, and maintenance phases. It also includes the development of a work breakdown structure and a use case diagram for the system.

System Development Life Cycle for Gold-Cinema System

30 minutes test comprising of multiple-choice questions

   Added on 2023-01-12

ShareRelated Documents
Case study
1
System Development Life Cycle for Gold-Cinema System_1
Contents
INTRODUCTION...........................................................................................................................3
TASKS.............................................................................................................................................3
CONCLUSION..............................................................................................................................13
REFERENCES..............................................................................................................................14
2
System Development Life Cycle for Gold-Cinema System_2
INTRODUCTION
The report is based on the Gold-Cinema system that develop the online platform to keep
track the information of customers, seats, performance and productions. The primary purpose of
system is to record the details and provide better facilities of customer. The documentation will
describe about the system development life cycle which mainly identified various activities that
will perform, launch, build and maintain the information system in proper manner. It will
produce the work break down structure description that supported with the help of table.
Furthermore, it will develop the use case diagram that will define the actors, participates those
are performing different action within Gold cinema system.
TASKS
1. Discuss about the system development life cycle which identifies all different activities,
require to build, maintain and launch the information system.
System development life cycle is a process used to model which provide the better
framework in both technical as well as non-technical activities. In order to deliver the best
quality of system and meet the enterprise expectations. In some situation, it also supported to
manage in decision-making process. System development lifecycle (SDLC) is consider as
systematic process for developing an efficient software (Budiman and Gunarta, 2018). It must
ensure that correctness, quality which will build the significant design. It is an essential process
that mainly used within system for handling complex task because many cases, it will arise
complex condition or situation during execution. So as it support for identifying the complex
condition and resolve them in step by step manner.
The primary aim of SDLC is to produce high quality of Gold-Cinema system which
provide the better facility and service to customer. The system development should be completed
in the pre-defined cost and timeframe. This process consists of detailed plan which described that
how build, plan and maintain the entire system in proper manner.
Planning: It is initial phase of system development life cycle that can identify, discover
and define the scope of Gold-Cinema project. In this way, it can be decided that what
action and specifying the address any issues, resolved by implementing the new solution
(Gechman, 2019). It is to be consider as an important crucial phase which require for
identifying need of project success. That’s why, during phase that thoroughly to do
research and identify technical need, budget, and resources.
3
System Development Life Cycle for Gold-Cinema System_3
Analysis: In this phase, Developer can understand the entire business requirement and
processing of new system design. Here, development team will consider the entire
functionality of system to assess how solution will meet the user’s expectation (Budiman
and Gunarta, 2018). In this way, user can easily identified and documented the system
specification, feasibility study is usually performed to identify that project is feasible in
term of technological, financial, social and organizational.
Design: It is important stage where system design documentation prepared as per
requirement of project specification. In order to define overall system architecture
effectively and efficiently. This process will be continues after comprehensive analysis. It
should be consider the different elements, architecture, components, modules, and user
interface and security levels (Pal, 2019). It also defined and designed the process to
evaluate how overall system finished work. The system design process will be choosing
an effective structure or layout. Afterwards, it produced in detail to ensure system will
include essential feature.
Coding/ Development: Once the design phase over, it is moving towards next phase
whereas develop start to build the entire system by using programming language. It is the
most common phase where different task divided into modules, units (Budiman and
Gunarta, 2018). This type of process is longest phase of software development lifecycle
process. Developer must be following certain predefine coding instruction, guidelines.
Sometimes, it also require to use an appropriate tool such as debugger and compilers.
4
System Development Life Cycle for Gold-Cinema System_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Systems Development Life Cycle Analysis 2022
|12
|1582
|24

System Analysis and Design for the Gold-Cinema Case Study
|10
|2315
|73

Gold-Cinema Ticketing System Development Online | Report
|15
|2978
|17

Management of Digital System
|9
|1748
|55

System Analysis and Design: A Case Study of Gold Cinema
|10
|2331
|38

System Analyst and Design: Body Sculptors Gymnasium
|14
|1908
|69