ProductsLogo
LogoStudy Documents
LogoAI Grader
LogoAI Answer
LogoAI Code Checker
LogoPlagiarism Checker
LogoAI Paraphraser
LogoAI Quiz
LogoAI Detector
PricingBlogAbout Us
logo

Competency Demonstration Report (CDR) - Continuing Professional Development - CPD

Verified

Added on  2023/06/10

|4
|749
|83
AI Summary
This article discusses the Continuing Professional Development (CPD) of an Electrical Engineer and Project Manager, including academic qualifications and work experience. The author has completed a B.Sc. in Electrical Engineering, Electronics and Communication Department and has worked in various organizations with important responsibilities and duties. The author is applying to the Australian Immigration (Engineers Australia) to increase their professional skills and knowledge.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Continuing Professional
Development - CPD
Competency Demonstration Report
(CDR)

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Continuing Professional Development
I have successfully completed B. Sc in Electrical Engineering, Electronics and
Communication Department in the year of 2007. Throughout the four years in my
engineering degree, I have acquired satisfactory grades and my overall percentage was
59.20%. I have obtained deeper knowledge in practical field of Electrical, Electronics and
Communication Engineering by perfectly completing the final year project. My project grade
was Excellent and I was well appreciated and certified by the college authorities. Currently, I
am working as a project manager in Q-Kitchen from August 2014. I have several
responsibilities like ability in designing the full functional kitchen within the available space
matching with the Municipality and Civil Defense requirements and reviewing tender
designing, materials and drawing submittal for MEP work scope. I even have some of the
major technical responsibilities. I have also worked in several organizations with proper
recognition with various important responsibilities and duties. Hence, I want to apply in the
Australian Immigration (Engineers Australia) for increasing my professional skills and
knowledge.
Academic Qualification
Serial No. Examination School/University Year of
Passing
Percentage
1. B. Sc. in Electrical
Engineering,
Electronics and
Communication
Department
Faculty of Engineering,
Tanta University
2007 59.20%
Work Experience
Duration Position Company Responsibilities
August
2014 to
Project
Manager
Q-Kitchen Ability to design a full functional kitchen
within the available space matching with
the Municipality and Civil Defense
requirements.
1 | P a g e
Document Page
Present Review tender design, client
requirements, materials and drawing
submittals for MEP work scope.
Sending inquiries to suppliers all over the
world to finalize a quotation within the
project budget.
Review subcontractors’ submittals in
terms of materials, shop drawings, method
of statement and quality plan to ensure
adherence to contract specifications.
Reviewing and releasing LPOs for
suppliers.
Verify and approve
subcontractors’/vendors’ invoices, and
follow up for timely release of payment.
Reviewing the LCs terms and conditions.
Manage Engineering team to Develop
Workshop drawings, CSDs and Material
submittals.
Prepare required plans and time schedules
using (Microsoft Project Program).
Place material requisitions as per project
plan and the requirements.
Providing the maintenance services for
commercial kitchen equipment, cold
stores, Laundry, mechanical exhaust
system, design and technical solutions &
etc.
Sites inspections and equipment
evaluation to provide accurate quotation
to the client.
Acquiring and updating knowledge from
the suppliers with new products and
services.
Analyzing and recording the service
reports to ensure closing the issues
avoiding rework and overtime.
Following up clients and ensuring
satisfaction with goods and services and
resolving any concerns.
August
2009 to
August
2014
Project
Engineer
BASCO
Group
(Egypt/
Qatar/ UAE),
Commercial
Ability to direct design department in
preparation of detailed drawings,
requirements drawings (Equipment
Layout, Electrical, Gas, Mechanical,
Block Work).
Assist in preparing the equipment
procurement plan and review its
implementation to ensure all of them
2 | P a g e
Document Page
Kitchen and
Laundry
Equipments
available on time.
Ensure monitoring on the quality of
materials and workmanship install,
operate and maintain.
Implement safety precautions on site and
develop healthy atmosphere by enforcing
procedures, rules, and regulations.
Prepare project status reports by
collecting, analyzing, and summarizing
information and trends; recommending
actions.
Close the project by finishing the entire
snag list and meet the customer
satisfaction.
September
2007 to
July 2009
Network
Engineer
Ocean
Express
(Egypt)
Manage IT projects such as network,
Cabling, Datacenters, Servers, Microsoft
Systems, Switching, Routing, Security, IP
telephony, wireless networks and other IT
related Projects.
Responsible for planning, scheduling,
conducting and coordinating the technical
and management aspects of projects.
Coordinate the project with internal team
and sub-contractor with regard to time
schedule, material specification and
quality.
Control and follow-up with projects
logistics and materials site installation.
Managing, troubleshooting, and
configuring CISCO, Dlink, switches and
routers.
Solve customer queries related to
LAN/WAN.
3 | P a g e
1 out of 4
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]