logo

CDR Project - Saudi Oger Limited

4 Pages1486 Words54 Views
   

Added on  2020-03-07

About This Document

In the assignment, we will analyze the CDR ( critical design review ) project, the Public Address System, LAN System, Lighting and Power Layout, Fire Alarm system, Telephone System, CCTV System these are all things that must be essential for the project review, detailed analysis of all the electric design, layouts and development of the buildings, and also the management of all the relevant electric components.

CDR Project - Saudi Oger Limited

   Added on 2020-03-07

ShareRelated Documents
CAREER EPISODE – 2a) Introduction: My second CDR project focuses completely on my work expertise and skills. At SaudiOger Limited, Riyadh I worked as the Electrical Engineer on a roadway project. Theproposed project commenced in the month of February 2010 and I concluded all theproject activities in the month of July 2013. I completed all my project activities withaccordance to the company’s policies, standards and approaches.CE2.1Duration: February 2010 to July 2013Location: RiyadhName of the organization: Saudi Oger LimitedPosition Title: Electrical Engineerb) Background: CE2.2 According to the report, the project is expected to finish housing facilities inPrincess Noura University (PNU) which comprise of 400 villas for the higherranking staff. CE2.3 The electrical architectural design of housing facilities at three unique areas inRiyadh has been presented in this project. The project plan involves the review ofdrawings ofa)Public Address Systemb)LAN System.c)Lighting and Power Layout.d)Fire Alarm system.e)Telephone System.f)CCTV System.I educated my juniors al the project activities including design, develop, and basicestablishment of all the electrical components To effectively finish it, I fulfilled these key strides: 1)Detailed analysis of all the electric design, layouts and development of thebuildings2)Detailed Analysis electric design layout, development and management of all therelevant electric components.
CDR Project - Saudi Oger Limited_1
3)Monitored each and every activity and assistance of all the electrical frameworksand equipment and system.4)Analyse the use of electric consumption.5)Composing every single technical detail in a project report.CE2.4 I did all my responsibilities as the main agent of the project. I had to plan theproject chores and monitor all the necessary electrical activities on the site. Imonitored and administered all the operational electric tasks that need to be doneand the procedures by which the plan will be executed. I assured that all therelevant tasks related to electrical framework systems and electric equipments mustbe executed within speculated time and the budget assigned.CE2.5 I processed appropriately according to the organisations’ policies and sent alldaily reports and workings to my seniors. I took advice from them, also took helpfrom them. I performed all my duties with full responsibility. I monitored thelocation where the electric equipments were installed and helped as per myknowledge and skills. I helped my juniors there and also monitored whether theyworked as per the organisations policies and standards.CE2.6 My project duties comprised of the following statements:a)I made building drawings, set rules and regulations relevant to electric powerutilization and the electric supplies.b)I was responsible for detailing the designed electrical plans relevant to theorganization’s management and the on-site workers c)I worked for hand in hand with the project team to set up the electric circuitsand systemsd)I tested the whole electric design system after set up with the proposedguidelines set beforee)I composed a technical report upon completion of the project with every minuteand critical detailsf)I ensured that the whole project set up must be completed as per my superiors’demands and within the given deadline.g)I followed each and every word of my superiors and executed the project; Imade the design model as proposed with intensive learning outcome. c) Personal Workplace ActivityCE2.7 I began my work accumulating all the data and later I finished load estimationof the electric equipment utilised during the construction of the buildings. I utilizedall my theoretical as well as the practical knowledge for analyzing the electricalequipment. I additionally computed load calculation values, circuit calculations andvoltage drop over the circuits. I audit GI passage, all control sectors with cable tray,and I also did numerous mathematical calculations.
CDR Project - Saudi Oger Limited_2

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project: Electric Design on Roadway
|5
|1607
|284

Career Resume of Mohamed Mahmoud - Maintenance Manager for Bahra Steel Co.
|4
|791
|370

Electronics Engineer Job Profile
|5
|902
|154

Competency Demonstration Report (CDR) - Continuing Professional Development - CPD
|4
|749
|83

Competency Demonstration Report - PDF
|9
|1791
|116

Abdel Ghany Abo Elyazeed Nassar - Career Resume
|4
|961
|196