logo

Project: Electric Design on Roadway

   

Added on  2020-03-07

5 Pages1607 Words284 Views
CAREER EPISODE – 3a) Introduction: My ternary CDR project is completely based on work expertise of mine. I worked asa Senior Electrical Engineer on a project with Ferrovial Agroman (Upgrading AbiBakr Assiddiq Road Project) the project was a roadway project based in the cityRiyadh. I undertook numerous activities associated with the project and thusfinished those with complete dedication for the company. The project activitiesinitiated in July 2015 and the complete is yet to complete and is running.CE3.1Duration: July 2015 - PresentLocation: RiyadhName of the organization: Ferrovial AgromanPosition Title: SeniorElectrical Engineerb) Background: CE3.2 The roadway project’s primary objective is to finish the entire electricalconstruction works at Construction Site-Electrical LV and to maintain the higherquality of the project construction.CE3.3 The proposed project is based on the electric design of the roadway project.The project tasks involve all the drawings of the electric circuits, designing andfurther development of the electric components. I advised all my subordinates theprinciples of the drawing, design and development and further assist them inexecuting the project successfully.To effectively set up the proposed project, I did the following:1)Assessment of electric design of the buildings as per planning.2)Design, develop and administer the construction of key electric segments3)Supervise and manage each and every operation and upkeep of electricalsegments and machines. 4)Examine the proper use of electric power along with proper electric distribution.5)Writing every specialized detail in a report. CE3.4 I administered UPS system, HV, Capacitor panels, LV system Installation,MDBs & SMDBs, HV panel, Diesel Generator Sets, testing and commissioning of LVPanels, Auto Capacitor boards as per consultant prerequisites and local authoritymade policies.

CE3.5 I was in charge for reporting all my working details to my superiors, I alsotook the necessary suggestions from them whenever I got stuck. They monitored allmy work activities. I was in charge of the on-site work. CE3.6 My project activities statements comprised of:a)External Lighting of the project includes street lighting, car park, pedestrian andstreet lighting along with flood lighting.b)The testing and analysis of Power Transformers ranging up to 30 MVA: OTI WTIgauge calibration, short circuit impedance test, winding resistance, turn’s ratio,vector group, no load magnetizing current, oil breakdown voltage, IR values.c)The proper management of man force, tools and materials according to theproject prerequisites.d)The proper follow up of the electric goods’ quality process for reviewing andresearch of installations all throughout the project timeline.e)All the electrical equipment and the relevant components that need to besubmitted should be prepared for the approval of the clients.f)Help in monitoring the construction diagrams to guarantee that they are to bedesigned as per proposed plan.c) Personal Workplace ActivityConstructionManagerMEP ManagerQuality ManagerProject ManagerSenior MechanicalEngineerSenior Electrical Engineer (Me)

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
CDR Project - Saudi Oger Limited
|4
|1486
|54

Competency Demonstration Report - PDF
|9
|1791
|116

Competency Demonstration Report: Development of Security
|8
|1730
|274

Building Automation System for World Academy School Project
|7
|1813
|444

Project Engineer at Mech Power Generator PTE LTD
|8
|1769
|346

Competency Demonstration Report - Assignment
|9
|1984
|188