logo

Project Information Assignment (doc)

   

Added on  2021-06-16

8 Pages1646 Words28 Views
 | 
 | 
 | 
CE 1.1 Project InformationName of the project: Determination of the Effect of Salinity on the RheologicalProperties of Water Based MudLocation of the project: Please fillProject Duration: Please fillOrganization: Please fillRole and Designation during the time: Team Member of the projectCE 1.2 Project BackgroundCE 1.2.1 Characteristics of the projectThe project of Determination of the Effect of Salinity on the Rheological Properties ofWater Based Mud was developed for providing significant benefits to the oil and gas field.Since this project was my first major project in engineering career, I made sure that theproject was accomplished perfectly. This particular project helped me in determining the totaleffectiveness of salinity over the several rheological properties of the water based mud for theindustry of oil and gas. CE 1.2.2 Objectives developed for the projectThis particular project of Determination of the Effect of Salinity on the RheologicalProperties of Water Based Mud has various significant objectives. They are as follows:To determine the effectiveness of salinity over the various rheological properties ofthe water based mudTo execute this project in high pressure and higher temperature.
Project Information Assignment (doc)_1

CE 1.2.3 My area of workThe project of Determination of the Effect of Salinity on the Rheological Properties ofWater Based Mud was one of the most important projects in my career. Being a petroleumengineer, I made sure that the project was executed properly, without any type ofcomplexities. I was responsible for making the project successful without any type ofproblem. I was under the supervision of my project supervisor and the entire project wascompleted under the control of our Head of the Department. My major area of work was tomake the project document properly and also get involved in the research study. All the staffsof my branch helped me with the core opportunity for working in various departments andthus I was able to gather practical knowledge. CE 1.2.4 Project GroupHead of DepartmentProject Leader Team MemberTeam MemberTeam MemberMEFigure 1: People involved in the projectCE 1.2.5 My responsibilities throughout the projectI was an important part of the project. I had various and several roles andresponsibilities throughout this project and I was successful in executing all of them. My first
Project Information Assignment (doc)_2

responsibility was to learn about the oil and gas field. As, this was my first project, I madethe project report properly and thus was responsible for documenting the project records. Mynext responsibility was to assist my project supervisor in the entire project and I was happythat I was successful in doing so. Another important responsibility that I had to execute inthis project was providing guidance to my juniors. I gained significant knowledge andexperience in the entire phenomenon. I even determined the effect of salinity in water basedmud. The temperature as well as the pressure was also determined by me. CE 1.3 Distinctive ActivityCE 1.3.1 Engineering knowledge and skills applied in the projectI have successfully utilized my petroleum engineering knowledge and skills for themajor success of this project. I knew that if I will apply my skills and knowledge in theproject properly, it is evident that the project will be a huge success. I am a hardworkingperson and have excellent problem solving skills. Since I was a quick learner, I utilized myexperience in this particular project. I had also used my computer proficiency in the project,which included MS Office, MS Project and many more. My power of critical thinking is alsoapplied here. CE 1.3.3 Comprehending the Theory of Project There is a basic significance of the exploration of deep as well as ultra deep wells forfulfilling the globalized demands of oil and gas. However, drilling to such depth often bringsout various difficult issues or challenges. One of the major challenges is that there is anegative force over the drilling fluid rheological properties, which whenever exposed to thehigher pressures and higher temperatures or simply HPHT conditions and becomingcompletely contaminated with the salts that are ordinary in the deep drilling or within theoffshore operations. There should be a high-quality estimation for all the values of
Project Information Assignment (doc)_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Engineering Technologist Assignment PDF
|11
|1506
|36

Project Information - Assignment PDF
|7
|1609
|100

Maturity Concept in the Strength Development of Concrete - Project Information and Background
|7
|1673
|379

Design and Fabrication of Magneto Rheological Fluid assisted Smart Worktable for Milling Process
|8
|1823
|88

South Qurainat Rumaila Temporary Compression Station Project
|7
|1633
|421

The Design of a Double Pipe Heat Exchanger
|8
|1697
|181