Executive Summary
The report demonstrate about the knowledge and understanding of the background of the
project. The project implementation or placement are evaluated effectively. The report has a
project placement module having a Cesim simulation were awareness is needed for skill
development. This project give the information about the King and Queen Restaurant
Business for simulation of the project. Skills were developed and discussed through Cesim
simulation which will be analyzed and discussed in the project. Analysis were underpin that
demonstrate the models or theories and evaluate the project effectiveness and will assess the
project phase. Thus, it is concluded that portfolio evidence were given to get the learning
outcome.

2CESIM PROJECT MANAGEMENT SIMULATION
Table of Contents
1. Introduction............................................................................................................................3
2. Underpin the analysis by demonstrating the theories or the models of trans-disciplinary....4
3. Effective evaluation of the phases of the project...................................................................5
4. Solving the problem that are based on work by developing the skills...................................6
5. Evaluating and analyzing the action taken or not taken with proper reason..........................8
6. Conclusion.............................................................................................................................9
References................................................................................................................................12

3CESIM PROJECT MANAGEMENT SIMULATION
1. Introduction
The student would experience the learning contract about the PPDI from the platform
that are based on learning. This could be clarified and recognized for my role and about my
tutor. The author Wall, (2017) in his article even stated the idea behind practicing the work
based learning through which it could achieve it for it is associated with the theory for the
practices of work based learning (Willenborg, Sindram and Kolbe, 2016). The simulation of
Cesim project management would give the student with the aim of gaining opportunities form
the members of the group keeping in mind to have a hand-on experience for the skills that are
needed by the manager of the project with the ongoing project till the project completion
(Pennbrant and Svensson, 2018).
The business of the company is about the Kings & Queen Restaurant that has owned
by Maxwell. The development and awareness of the skills of project management is taken by
the Cesim simulation. There are 3 staff members in the project. There are diverse audience
for catering the restaurant. They have comfortable areas for sitting with children and adults. It
offers services like home delivery from its location within the radius of 1-mile. Certain
responsibility is listed for each of the owner (Sunindijo, 2015). The research study for the
Cesim simulation shows that the location is hazard free that aids to Cesim simulation. The
procedures for decision-making is cost effective when a training is needed by the student
were different area of practical requirements are there for the team work. The process for
Cesim simulation helps in improving the interaction and communication among the members
of the group (Jiang et al., 2014). There is some work in the past that has experience and
would be established with adequate understanding thorough planning, negotiation, team
work, communication and feedback.

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Placement Design and Implementation - Professional Research and Communication
|14
|3973
|202

Cesim Simulation: Analyzing Theories and Effective Evaluation for Project Phases
|14
|3776
|483

Project Placement Design and Implementation
|26
|6894
|359

PPDI5039 Project/Placement Design and Implementation
|16
|5743
|70

Assignment on Leadership Skills
|24
|2930
|62

Project Placement and Design Implementation
|20
|4669
|448