Project Report: Case study 'The Chunnel Project'

Verified

Added on  2023/06/12

|16
|3574
|116
AI Summary
This project report is a case study on 'The Chunnel Project' which was made for supporting the deployment of the effective employment development methods. It encompasses the construction of the activities for supporting the ease of economic development and the utilization of the innovative technology. The report discusses the project scope, communication issues, project management office, project contract, project stakeholders, project performance, and reflection of teamwork.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: PROJECT REPORT
Project Report
Case study: ‘The Chunnel Project’
Name of the Student:
Student ID:
Name of the University:
Author’s note:

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1PROJECT REPORT
Executive Summary
The implication of the improved documentation and processes was deployed the effective
implication of the intentional development modulation. The analysis had been deployed for
easing the implication of the deployed modification. The Chunnel project had been made for
supporting the deployment of the effective employment development methods. The Chunnel
Project had been deployed for easing the implication of the improved functional and
development model. The Chunnel project had result in developing the tunnel channel in
Australia. The following assignment had been helpful for easing the flow of operations and it had
also been helpful for constructing the pipeline across the state. The following assignment had
provided a brief information context for easing the implication of the improved communication
of the project requirements. The assignment had provided the overview of the project scope and
the integration of the improved communication development. The communication plan had been
supported by the alignment of the successive development of the activities. The completion of
the project had been dependent on the activities of the project and it can be analysed with the
help of project performance factors like cost performance index and schedule performance index.
Document Page
2PROJECT REPORT
Document Page
3PROJECT REPORT
Introduction
The implication of the improved documentation and processes is deployed the effective
implication of the intentional development modulation. The analysis would be deployed for
easing the implication of the deployed modification (Nicholas and Steyn 2017). The Chunnel
project had been made for supporting the deployment of the effective employment development
methods. The Chunnel Project would be deployed for easing the implication of the improved
functional and development model. The Chunnel project would result in developing the tunnel
channel in Australia. The following assignment would be helpful for easing the flow of
operations and it would also be helpful for constructing the pipeline across the state. The
following assignment would provide a brief information context for easing the implication of the
improved communication of the project requirements. The assignment would provide the
overview of the project scope and the integration of the improved communication development.
The communication plan would be supported by the alignment of the successive development of
the activities (Rogers 2016). The completion of the project would be dependent on the activities
of the project and it can be analysed with the help of project performance factors like cost
performance index and schedule performance index.
Project Scope
The Chunnel project was based on the development of the transportation link between
England and France by the help of the underground tunnel transportation network. The Chunnel
project would be dedicated for the formation of the effective transportation in the organization
supporting the utilization of the improved communication process. The Chunnel Tunnel Project

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4PROJECT REPORT
would encompass the construction of the activities for supporting the ease of economic
development and the utilization of the innovative technology. The in scope items of the project
have been explained below,
Construction Activities: The construction of the tunnel would be aligned for ensuring
that the project deliverables would be achieved with the help of the improved functional and
effective transportation network (White 2017). The Chunnel project would be dedicated for the
formation of the effective transportation in the organization supporting the utilization of the
improved communication process. The Chunnel Tunnel Project would encompass the
construction of the activities for supporting the ease of economic development and the utilization
of the innovative technology.
Documentation: The proper documentation of the project activities would be helpful for
ensuring that the final project deliverable would be achieved. The documents like project
initiating documents comprising of the project scope can be aligned with the implication of the
final project deliverable (Cross and Brohman 2014). The documents would serve the purpose of
easy information exchange and the alignment of the activities. The proper project charter would
be formed for aligning the implication of the final documentation reports for ensuring that the
project information can be stored for further use.
Project Management Principles: The various construction principles of project
management is incorporated for the execution of the project and it would involve the alignment
of the final deliverable supporting the execution of the improved project execution and
development (Basu 2016). The completion of the project would be effectively aligned with the
development of the improved functional and operational development. The completion of the
Document Page
5PROJECT REPORT
improved activities would be aligned with the implication of the successive alignment of the
management principles and activities.
Communication Issues
The communication plays a crucial role for the execution of the event of project and the
completion of the activities (Bennett and Ho 2014). The construction of the tunnel would be
aligned for ensuring that the project deliverables would be achieved with the help of the
improved functional and effective transportation network. The Chunnel project would be
dedicated for the formation of the effective transportation in the organization supporting the
utilization of the improved communication process. It would encompass the construction of the
activities for supporting the ease of economic development and the utilization of the innovative
technology (Small 2014). The communication between the English and French side would be
required for ensuring that the activities of the project would be executed successfully. The right
transfer of information would also be required in the execution of the project. The various
communication and execution issues would be helpful for ensuring that the execution of the
improved functional and development models would be supported by the utilization of the
improved communication. However, there are several issues that would result in forming the
major setback for the implication of the improved communication process. The communication
issues like delay in information transfer, lack of proper communication methods, and distance
between the sender and receiver (Amenyo et al., 2014). The major issue of communication is the
delay in transferring of the information and it would result in forming the major for the
successful transformation of the information processing.
Document Page
6PROJECT REPORT
Delay in communication: The delay in communication is the major problem for the
effective information transfer and alignment of the improved processing and integration. The
delay in completion of the project activities would be aligned for the causing the major issues for
the completion of the project activities (Amenyo et al., 2014). The delay in project completion
would result in causing the major factor alignment methods. The formation of the activities
would be helpful for easing the utilization of the operations taking care of the communication.
However, due to the implication of the delay factors, the project execution would be tampered.
Lack of proper communication methods: The lack of proper methods of
communication would result in forming the major issues of the activity alignment and
development. The alignment of proper communication methods would be required for ensuring
the communication. However, due to the shortage of the communication methods the
organization would not be able to cope up with the implication of the communication processes.
Project Management Office
The project management office would be helpful for executing the implication of the
improved project development methodology and it would also be helpful for easing the process
of project role definition. The Chunnel project would be dedicated for the formation of the
effective transportation in the organization supporting the utilization of the improved
communication process (Small 2014). It would encompass the construction of the activities for
supporting the ease of economic development and the utilization of the innovative technology.
The project management office would be required for ensuring that the activities for the
construction and the alignment of the effective utilization would be eased by the use of the
successful integration management. The project management office would be supported by the

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
7PROJECT REPORT
improvement of the activities for forming the alignment of the activities. The role played by the
PMO in Chunnel project is,
Formation of the channel for the execution: The channel for the execution of the
project management operations would be helpful for easing the flow of the information and the
alignment of the improved communication methods. It would be helpful for successfully
executing the projects and aligning the implication of the successful integration management.
The utilization of the processes can be developed with the role of the alignment and formation
methods. The execution of the channel for the Tunnel project would be the responsibility of the
PMO.
Resource Acquisition: The acquisition of the resources is another major responsibility of
the project management office. The acquisition of the resources would be helpful for forming the
rift to develop the resource plan. The resource acquisition would be helpful for ensuring that the
activities of the project are met. The PMO would collect the resources and distribute it to the
various activities of the project as required in plan.
Centre of Convergence: The PMO office would act as the centre where the team
members from both the countries England and France would gather information and work
simultaneously. It would help in bringing together the two cultures successfully for ensuring that
the project activities are being executed successfully.
Project Contract
The fixed price contract was chosen as the project was construction based and the
construction project would face minimum probability of over budget when fixed pay contract
Document Page
8PROJECT REPORT
would be followed. The two Government of England and France would be responsible for the
execution of the activities in such a way that the completion of the project would be aligned with
the development of the activities of the project management. The difference in culture would
result in forming the major issues for smooth operations of the project. The difference between
the working styles of the two countries would require fix contract procurement for ensuring that
the project would be completed successfully. The contract developed between the two state
governments based on Fixed Pay would allow the maximum utilization of the resources while
ensuring that minimum cost expenditure would be faced. The utilization of the activities would
help in overcoming the implication of the activities to deploy the advancement of the improved
factors and alignment.
Project Stakeholders
The stakeholders of the project are responsible for the major activities and key decisions
of the project. The completion of the project, project success or failure, and approval of the
activities would be responsible on the project stakeholders. The project stakeholders would be
dependent on the utilization of the activities for ensuring the alignment of the utilization
methods. The implication would be responsible for the alignment of the factors. The project
stakeholders would be responsible for the deployment of the activities so that the complete
project can be achieved. The stakeholders of the Chunnel Project are British Government, French
Government, contractors, workers, engineers, people of the two countries, banks investing in the
project, and other team members. All these are the stakeholders of the project and they have
definite role for the completion of the project. The correspondence between the English and
French side would be required for guaranteeing that the exercises of the task would be executed
Document Page
9PROJECT REPORT
effectively. The correct exchange of data would likewise be required in the execution of the task.
The different correspondence and execution issues would be useful for guaranteeing that the
execution of the enhanced practical and advancement models would be upheld by the usage of
the enhanced correspondence. Be that as it may, there are a few issues that would bring about
framing the significant mishap for the formation of the enhanced correspondence process. The
correspondence issues like postponement in data exchange, absence of appropriate specialized
techniques, and separation between the sender and collector. The real issue of correspondence is
the deferral in exchanging of the data and it would bring about framing the major for the fruitful
change of the data preparing.
Project Performance
The best possible documentation of the task exercises would be useful for guaranteeing
that the last project deliverable would be accomplished. The reports like undertaking starting
records containing the project extension can be lined up with the formation of the last task
deliverable (Rogers 2016). The reports would fill the need of simple data trade and the
arrangement of the exercises. The best possible task contract would be framed for adjusting the
formation of the last documentation reports for guaranteeing that the project data can be put
away for additionally utilize. The development of the passage would be adjusted for
guaranteeing that the project expectations would be accomplished with the assistance of the
enhanced practical and successful transportation arrange. The Chunnel undertaking would be
devoted for the development of the successful transportation in the association supporting the
usage of the enhanced correspondence process. The Chunnel Tunnel Project would incorporate

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10PROJECT REPORT
the development of the exercises for supporting the simplicity of monetary improvement and the
use of the creative innovation.
CPI The cost performance index is the study of the improved communication methods
for listing the alignment of the improved development. The cost performance
index would be deployed for the alignment of the improved communication
process. The CPI would be aligned for listing the deployment of the cost indicator
for the project. The CPI would be helpful for the evaluation of the cost factor and
forming the allocation of the expenditure for the cost in the project.
SPI The schedule performance index is the study of the improved communication
methods for listing the alignment of the improved development. The schedule
performance index would be deployed for the alignment of the improved
communication process. The CPI would be aligned for listing the deployment of
the schedule indicator for the project. The CPI would be helpful for the evaluation
of the schedule factor and forming the allocation of the expenditure for the
scheduled time in the project.
Reflection of Team work
We had planned to complete the construction project for the alignment of the effective
implication of the project management. The implication of the improved documentation and
processes is deployed the effective implication of the intentional development modulation. The
analysis would be deployed for easing the implication of the deployed modification. The
Chunnel project had been made for supporting the deployment of the effective employment
Document Page
11PROJECT REPORT
development methods. The Chunnel Project would be deployed for easing the implication of the
improved functional and development model. The Chunnel project would result in developing
the tunnel channel in Australia. The following assignment would be helpful for easing the flow
of operations and it would also be helpful for constructing the pipeline across the state. The
following assignment would provide a brief information context for easing the implication of the
improved communication of the project requirements. The assignment would provide the
overview of the project scope and the integration of the improved communication development.
The construction of the tunnel would be aligned for ensuring that the project deliverables would
be achieved with the help of the improved functional and effective transportation network. The
Chunnel project would be dedicated for the formation of the effective transportation in the
organization supporting the utilization of the improved communication process. The proper
documentation of the project activities would be helpful for ensuring that the final project
deliverable would be achieved. The documents like project initiating documents comprising of
the project scope can be aligned with the implication of the final project deliverable. The
documents would serve the purpose of easy information exchange and the alignment of the
activities.
Lessons Learnt
The Chunnel project had been made for supporting the organization of the compelling
work improvement techniques. The Chunnel Project would be sent for facilitating the formation
of the enhanced practical and advancement display. The Chunnel undertaking would bring about
building up the passage direct in Australia. The accompanying task would be useful for
facilitating the stream of activities and it would likewise be useful for building the pipeline over
Document Page
12PROJECT REPORT
the state. The accompanying task would give a short data setting to facilitating the formation of
the enhanced correspondence of the project necessities. The task would give the outline of the
undertaking degree and the joining of the enhanced correspondence improvement. The
correspondence design would be upheld by the arrangement of the progressive improvement of
the exercises. The different development standards of task administration are fused for the
execution of the project and it would include the arrangement of the last deliverable supporting
the execution of the enhanced undertaking execution and advancement. The fruition of the task
would be successfully lined up with the advancement of the enhanced utilitarian and operational
improvement. The consummation of the enhanced exercises would be lined up with the
formation of the progressive arrangement of the administration standards and exercises.
Conclusion
It can be concluded that the alignment would be formed for ensuring that the effective
management would be implied for the integration of the factors. The project stakeholders would
be dependent on the utilization of the activities for ensuring the alignment of the utilization
methods. The implication would be responsible for the alignment of the factors. The project
stakeholders would be responsible for the deployment of the activities so that the complete
project can be achieved. The stakeholders of the Chunnel Project are British Government, French
Government, contractors, workers, engineers, people of the two countries, banks investing in the
project, and other team members. All these are the stakeholders of the project and they have
definite role for the completion of the project. The correspondence between the English and
French side would be required for guaranteeing that the exercises of the task would be executed
effectively. The correct exchange of data would likewise be required in the execution of the task.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
13PROJECT REPORT
The different correspondence and execution issues would be useful for guaranteeing that the
execution of the enhanced practical and advancement models would be upheld by the usage of
the enhanced correspondence. Be that as it may, there are a few issues that would bring about
framing the significant mishap for the formation of the enhanced correspondence process. The
correspondence issues like postponement in data exchange, absence of appropriate specialized
techniques, and separation between the sender and collector. The real issue of correspondence is
the deferral in exchanging of the data and it would bring about framing the major for the fruitful
change of the data preparing.
Document Page
14PROJECT REPORT
References
Amenyo, J.T., Jadoonanan, S., Gnabode, S., Tabassum, T. and Kublal, A., 2014, October. KOM
(Keep Out Mosquitoes) project: Anthropo-philic terraforming and manipulation of landscapes
for mosquito vector control in malaria disease management and eradication. In Global
Humanitarian Technology Conference (GHTC), 2014 IEEE (pp. 534-540). IEEE.
Basu, R., 2016. The best practices of managing quality in projects. Further Advances in Project
Management: Guided Exploration in Unfamiliar Landscapes, p.13.
Bennett, J.M. and Ho, D.S., 2014. Project management for engineers. World Scientific
Publishing Company.
Cross, B.L. and Brohman, M.K., 2014. Project Leadership: Creating Value with an Adaptive
Project Organization. CRC Press.
Goldsmith, H. and Boeuf, P., 2016. The Chunnel in History: breakthrough or continuity?.
Nicholas, J.M. and Steyn, H., 2017. Project management for engineering, business and
technology. Taylor & Francis.
Razali, M.A.A., 2014. Effect of Managing Technical Risk Towards Reducing Cost of Production
in Project (Doctoral dissertation, UMP).
Rogers, R., 2016. Do you want to go for a ride on the chunnel? The British public
understandings of the Channel Tunnel meet the Eurotunnel Exhibition Centre. Public
Understanding of Science.
Small, J., 2014. Project finance investors: solution to populismo. Int'l L. & Mgmt. Rev., 10, p.71.
Document Page
15PROJECT REPORT
White, S.W., 2017. Harmonising British and European Identity in a Technological Project.
1 out of 16
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]