COIT20265 Networks and Information Security Project - Progress Report
Verified
Added on 2024/05/15
|4
|943
|134
AI Summary
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
COIT20265 Networks and Information Security Project Submission of Periodic Group Progress Report This Project Report numberPlease tick (only one) Report 1Report 2Report 3Report 4 Due date:Friday Weeks 4, 6, 8 and 10 Part:Progress Report Weighting:10 marks of total assessment (2.5 marks x 4 progress reports) Submission:Electronic (see course website for details) This reporting period (e.g. week 4, 6, 8, 10) Student(s) Number(s) Student(s) name(s) 1.1Schedule review The project has been greatly understood and discussed till now. The total work till the fourth week has included number of tasks. We have performed various things like understanding the case study, requirement analyses etc. the project is on the fourth week stage which is project planning. Following is the brief summary of the tasks performed in the previous weeks – 1.Week 1 – Requirement Analyses In this phase all the major requirement of the project is analysed and different aspects are discussed. Case study outline – in this the complete case study is studied thoroughly. Brief discussion on project requirement – general discussion on the project requirement Analysing raw data 2.Week 2 – Project Scope Project scope is identified and deliverables are analysed of the project. This is a vast topic so we’ve divided it into subparts which are – Deliverables – Deliverables are the end result of a task or process. It can be either a end product or service. Technology – Technology plays a vital role in this project for obvious reason. Here, technologies that can be used in this project is discussed. Acceptance criteria – It is the term which defines that the solution for project scope is justified or the requirements are fulfilled as per requirements 3.Week 3 – Project objectives In this week we’ve discussed about the project objectives. Analysing the objectives and how to achieve the aims were discussed. Examining the existing knowledge – Here we checked our existing knowledge related to the project Identifying project goals – In this section we define the actual project goals and aims
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Cost effective solution – General discussion about effective solution to achieve the objectives which should also be cost effective 4.Week 4 – Project planning Project planning is present phase of the project. This phase includes the planning of overall project assigning tasks to the group members. This phase is really important because without scheduling the project there will definitely be mismanagement in the project and the project result will definitely be not on the schedule date. Assigning responsibilities – This work is critically important so that individual tasks are defined and no one is there to blame another. In this we’ve assigned roles and responsibilities of the team members RACI Matrix – RACI matrix is a technique by which each task of project is divided into different roles and these are allotted to team members Gantt chart – Gantt chart is the schedule representation of the tasks involved in project according to the dates Project phases – Different project phases are defined In the upcoming week we’re going to perform the Network Redesign which will include different sub parts like studying the existing network, analyses of requirement for upgradation, and defining addressing scheme will be done. 2.1 Work completed Activity # DescriptionDate started Assigned to% complete 1Week 1 – Requirement analyses05 Mar 2018100% 2Week 2 – Project scope12 Mar 2018100% 3Week 3 – Project objectives19 Mar 2018100% 4Week 4 – Project planning26 Mar 2018100% 5Week 5 – Network redesign02 Apr 201810%
2.2 Any Issues Initially there was lots of issues in getting through the project. The project includes various technologies which was like new to us. To get over such issues we had some training session about technologies to be included in the project. The other main issue was communication. The way of communication between our team was not so great, so, to resolve this problem we use third party application like slack and google docs. 3.1Risk review The main initial risk in every project is to schedule the project in a plan and to stick with the schedule. We were also in a great risk that the planned project will be done in the proposed schedule or not. For this we’ve introduced a supporting management tool which RACI matrix and Gantt chart which will help us in getting the project deliverable as per phase on scheduled time. But not following the scheduled plan will put the project in great risk. COIT20265 Networks and Information Security Project Submission of Periodic Group Progress Report Reporting week Student(s) ID(s):Student(s) Name(s): Marker: ComponentMarksMarks
availableawarded 1.Schedule Review a.Work completed1.0 b.Issues0.5 2.Risk Review0.5 3.Clarity of presentation (language and grammar)0.5 Total2.50 Penalty (Plagiarism / late submission) Grand total Marker’s Comment: