Project Management for Building a Common Room in College Premises
Verified
Added on Β 2023/04/24
|7
|519
|68
Presentation
AI Summary
This project plan outlines the requirements for building a common room in college premises, including project initiation, planning, execution, monitoring, and closure phases. It includes a network diagram, scheduling, resources and budget allocation, risk management plan, and human resource management plan.
Contribute Materials
Your contribution can guide someoneβs learning journey. Share your
documents today.
Project management Student Name: Course name: Building a common room in the College Premise
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Task 1: Project plan requirements 1.1 Task indication and structures Common room design schedule Project initiation phase Survey to identify the need for common room building project Site inspection Request permits Buying project materials Taking permits from the college authority and governing body Contract signing to contractor ad sub contractors Lay foundation Project budget estimation Project outline document design Project planning phase Details survey of the site Contract to interior Contract to painter Contract to electrician and plumbers Installation of wallboard Building substructure and a superstructure for the common room External work details Final testing and commission Common room structure outlining Final construction with quality interior and exterior Project execution phase Columns reinforce, shuttering and concrete Slabs shuttering by installing ribs Reinforcing and concrete slabs Construction finalization Project monitoring phase Interior finalization with painting Cladding exterior wall Floor tiling with false ceiling design Project closure phase Placing furniture as per the needs Placing indoor gaming (TT, Chase, carom)
Network Diagram and scheduling
Resources and budget allocation
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
References οDeviKrishnaya, S., Jamaludin, K. R., & Ismail, S. (2017). Communication Management during Design Phase in Construction Project. InMASTER PROJECT SYMPOSIUM ON ENGINEERING BUSINESS MANAGEMENT(Vol. 13, p. 29). οGreenaway, K. H., Wright, R. G., Willingham, J., Reynolds, K. J., & Haslam, S. A. (2015). Shared identity is key to effective communication.Personality & Social Psychology Bulletin,41(2), 171-182. οHam, T. J., AragΓ³n, J. L., & Martonosi, M. ((2015), December). DeSC: Decoupled supply-compute communication management for heterogeneous architectures. InProceedings of the 48th International Symposium on Microarchitecture(pp. 191-203). ACM. οHeagney, J. (2016).Fundamentals of project management. AMACOM Div American Mgmt Assn. οKaiser, M. G., El Arbi, F., & Ahlemann, F. (2015). Successful project portfolio management beyond project selection techniques: Underst&ing the role of structural alignment.International Journal of Project Management,33(1), 126-139. οKerzner, H., & Kerzner, H. R. (2017).Project management: a systems approach to planning, scheduling, & controlling. John Wiley & Sons. οMalhotra, N., & Ackfeldt, A. L. (2016). Internal communication & prosocial service behaviors of front-line employees: Investigating mediating mechanisms.Journal of Business Research,69(10), 4132-4139. οMen, L. R. (2014). Strategic internal communication: Transformational leadership, communication channels, & employee satisfaction.Management Communication Quarterly,28(2), 264-284. ο