Table of Contents INTRODUCTION.......................................................................................................................................2 LO1: Describe the construction industry with reference to company structures and other activities.......3 P1: Explain how the construction industry has developed and encompassed professionalism within its structure...................................................................................................................................................3 P2: Demonstrate the scope and linkage between all parties within a construction organization..............4 P3: Identify the type of contractual work tendered by the contractor.......................................................5 M3: Analyze how the construction industry has developed overall in terms of company structures, itโs employees and contracted work...............................................................................................................6 LO2: Explain different types of construction companies with the market and their relationships within the tendering process.........................................................................................................................................6 P4: Identify the different types of construction companies in the market................................................6 P5: Explain the relationship between different construction organizations..............................................7 M2: Analyze the catalyst which connects construction companies, including contracts and tendering.. .7 LO3: Key stages in a construction project and how Building Information Modelling informs the different stages...........................................................................................................................................................9 P6: Sustainable and Modern construction processes and sequences used within todayโs industry...........9 P7: Contract planning techniques used within micro and macro projects..............................................10 P8: BIM impacts upon operations and construction companies.............................................................11 M3 Analyze how construction has developed in terms of innovation, designs and within contracts for micro and macro projects and interrelationships with BIM...................................................................12 LO4 Analyze how the construction industry has developed suitable collaboration strategies in support of greater recognition of health & safety........................................................................................................13 P9 Explain how health & safety has now become an integrated part of the construction process..........13 P10 Describe the government legislation which has benchmarked health & safety within construction. ...............................................................................................................................................................14 P11 Discuss the role of collaboration and communication in ensuring safe working practices.............14 M4: Demonstrate how the construction industry has benefited through changes in health and safety legislation..............................................................................................................................................15 CONCLUSION.........................................................................................................................................16 References.................................................................................................................................................17 1|P a g e
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
INTRODUCTION In this report we will discuss about construction companies, their types and various aspects that affects the construction industry. In LO1 we will discuss about what is a construction company, its structure and its various references. Different links between all parties in a construction company will be discussed along with the analysis of various processes like tendering and contracting. In LO2 we will get to know various types of construction companies in the market and how they are dependent in certain situation. We will get to know what connects these various companies and how to engage in the process of collaboration when needed. LO3 is all about various stages in a construction project, process of traditional construction versus modern construction methods. Planning of macro and micro projects will be debated in this section. LO4 will include discussion about health and safety measures in a construction project and what all kind of measure can be taken to prevent any harm to the projects or to the people involved in it. 2|P a g e
LO1:Describetheconstructionindustrywithreferencetocompany structures and other activities. Construction companies are the companies which are dependent on their performance standard and quality of their work. Despite the everyday structural development around the globe but as a whole, the construction business is scarce. There are still problems like performance standards and performance measurements that affect the construction industry. P1:Explainhowtheconstructionindustryhasdevelopedandencompassed professionalism within its structure. Structure of any construction company consists of two major roles: first is all the job roles and theirarrangementinthecompanyandsecondrelationshipsbetweenthosejobrolesor designation. There are numerous roles present and required in a construction company like Marketing, Human resources, Finance, Logistics, Project Management etc. and to have a strong integral structure all the departments must have proper communication and ethnic relationships between them. Main roles in the structure of Construction Companies CEO or Chief Executing Officer CEO of a construction company is responsible for decision making on all the important aspects of the company. Chief Executing Officer assigns distinct roles to his/her subordinates to oversee various projects as it would be impossible for a single person to see every single detail of every project so dividing and distributing responsibilities is the best and more efficient way to proceed any project in a construction company. Managing Director The role of managing director is to see every project that the company takes and oversee all the construction jobs after they have acquired it. The managing director is responsible for structural plans of the project and work plans for the jobs that will be required to complete the project. This job also comes with the responsibility of hiring people who are capable of the job and for firing any person who is incompetence for the job Project Director 3|P a g e
Before the actual construction of the project is started, there has to be an analysis and survey of all the criteriaโs which are included in the project. Like, cost analysis, performance standards etc. After all analysis, the Project Director directs the construction workers to the site to start the project and he also oversees all the day to day progress and reports them back to the headquarters. Project Supervisor Project Supervisor is a subordinate of Project Director. He sees over all the aspects of the work along with the roles that it requires. For example, Project supervisor will oversee the team who is responsible for construction materials like asphalt and cement. He also ensures that all workers are completing their shift and if there are any issues regarding workers, he must pass along the request to the Project Director. Construction Workers Construction workers perform daily tasks at the site. They build the structure using tools and construction materials. They handle all the physical aspect of the project. There are special permits for the workers who handle distinct tasks like electrical wiring, bulldozers etc. P2: Demonstrate the scope and linkage between all parties within a construction organization. There are various parties within a construction organization. Like: ๏ทEmployer/Client ๏ทContractor ๏ทProject Manager ๏ทContract administrator ๏ทArchitect 1.Employer/Client An employee or client is the person who hires a construction organization to work for him. An employee describes the construction of anything that he/she requires to the 4|P a g e
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
construction company and hires them to procure the work and build the project that the client desires. 2.Contractor The contractor is the person who is hired by the employer to carry out and complete the project. To divide and distribute the workload, a contractor hires sub-contractors so that he can separate the responsibilities between them. The contractor is responsible for the design and development of the project and oversees all the tasks of the project. 3.Project Manager Project Manager is responsible for the analysis of the projectโs different aspects like cost analysis, jobโs analysis etc. The project manager also sends the works to the construction site after the analysis is completed. 4.Contract Administrator Contract Administrator is responsible for the contractual proposalโs preparation and review. He also negotiates the cost of equipmentโs and material to lower the overall cost of the project. 5.Architect The architect is the person who designs the project and figures out the calculation that makes the project durable and sturdy. Calculation done by the architect has to correct and precise because the whole projectโs construction depends upon those calculations. P3: Identify the type of contractual work tendered by the contractor. At this stage, the contractor selects and appoints a number of works for the project. According to their job profile management assign them different responsibilities which fit their profile. Sometimes this stage is repeated at various times because responsibilities changes as the project move forward. This stage is very crucial because hiring the right person for the job is very important to the project to avoid problems in the future. 5|P a g e
M3: Analyze how the construction industry has developed overall in terms of company structures, itโs employees and contracted work. In the past few decades, various number of industry sectors has evolved. Traditional ways of working are becoming obsolete and new ways are fulfilling requirements of the project. Same things are happening to the construction industry as well. Traditional ways of constructing a projectarenotusedintodayโsworld.Variousentitieswereintroducedbecauseofthe circumstances. Like contractorโs have to bid for the tender if they want to get the project. They hire people with proper permits and license so that only rightful person will complete the to job and incompetence can be avoided. Overall company structure has also changed HR departments to see all the works and discuss any issues related to them. Banks are acting a Funder so that the right amount of capital can be invested in the project. 6|P a g e
LO2: Explain different types of construction companies with the market and their relationships within the tendering process. P4: Identify the different types of construction companies in the market. There are 8 types of construction companies in the market: 1.Small Renovation Contractor 2.General Contractor 3.Owner- Builder 4.Real Estate Developer 5.Professional Construction Manager 6.Program Manager 7.Package Builders 8.Sponsor-Builder P5: Explain the relationship between different construction organizations A various number of Construction organizations are present in the market. Generally, they appear as competitors but there are some aspects where they have certain relationships between them which are co-existential. Like a company who takes projects and build them will not have specific departments for the construction materials. It would usually contact some other company whose primary role is to provide construction material to the larger corporation who need it. Another example would be sometime companies doesnโt hire all the expertise that they need for a specific project as when the project is completed, they have to pay that specific person a salary without being able to use his/her skills. So, in that case, there are some industries which provide skill or unskilled workers for hire for a specific amount o time. After their work is finished, they will go back to the company from which they came and they will get assigned to another project in some other company. M2:Analyzethecatalystwhichconnectsconstructioncompanies,including contracts and tendering. Sometimes there are some projects which are too big for any single company to finish so some companies get in a binding contract which includes them in a temporary contract which 7|P a g e
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
establishes them together as a single company. The catalyst in this situation is the project which made this collaboration possible. This is a very efficient way of working because if a company takes on a project which is out of its bounds then both the company and the project will suffer. So, the clever thing to do is find a suitable or compatible company which can help in the completion of the project. The process of tendering is the first stage as it will determine the size of the project and it will also help the companies to realize whether to find a compatible company or not to finish the project. 8|P a g e
LO3: Key stages in a construction project and how Building Information Modelling informs the different stages. P6: Sustainable and Modern construction processes and sequences used within todayโs industry There are various sustainable and modern practices in construction which are as follows: 1.Materials To build a sustainable structure, it is required to utilize materials which are environment- friendly. There are various modern and sustainable materials which are utilized as concrete, steel roofs, prefabricated bathrooms, etc. These materials are also environmentally sustainable and environment-friendly. 2.Prefabricated or Volumetric Construction There is greater demand for volumetric construction as a lot of time is saved and also waste is reduced. With this transportation, the volume is also saved. 3.Permanent Modular Construction This includes modules for offsite structure. After these cranes are utilized to assemble all prefabricating chunks. This process is sustainable. This is becoming common as it is flexible. 4.Software Estimation There are various softwareโs available from which the volume of materials utilized in the construction process would be estimated. It saves both money in time. The example of this is BIM software. 5.Construction Software These are the tools for managing a construction project. It includes all the needed support for construction, resources, operations, etc. The software which comes under is as CAD and BIM Hook J. (2016). 9|P a g e
P7: Contract planning techniques used within micro and macro projects. The planning is done according to the specified project. These are available to the contractor. These techniques are applied to both minor and macro projects. There are various techniques included in contract planning which are as follows: 1.Bar charts or giant charts: In bra charts, the time period is estimated. There are various symbols and tasks which can be accumulated in these graphs. In Giant chart also, Various tasks are enlisted with an estimated period of completion of that particular task. Through this target can be met. 2.Precedence Diagrams: Through these various activities in the process can be identified with scheduling time. Here dependencies are also shown. 3.Network analysis or critical path techniques: This is extensively used in construction industry. Here the time and resources can be estimated Rodriguez J. (2018). 4.The line of balance charts: This is one of the control processes which contains a lot of methods as related to various parameters as cost, completion and time 10|P a g e
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
P8: BIM impacts upon operations and construction companies BIM has a great impact on the construction industry. According to the study, 75 % have adopted great investment. There is a great impact on the construction industry as: 1.33% of costs have decreased at initial phases. 2.Till completion 50% projects are delivered faster. 3.More environmentally friendly process. It was around 50 % of lower harmful emissions. 4.More collaboration and coordination. 5.There is a higher level of flexibility. 6.Risk can be mitigated. Entire practices are changed because of this tool. This has a good impact on the construction industry. 11|P a g e
M3 Analyze how construction has developed in terms of innovation, designs and within contracts for micro and macro projects and interrelationships with BIM. After BIM, the whole construction industry is innovated in terms of parameters as construction designing and management. There are various capabilities of BIM. This has 3 dimensions as Visualization perspective, rich inclusion and non-geometric data. There are various benefits in terms of innovation and design: 1.Both communication and collaboration are better As BIM allows various things like versioning, collaborating with multiple other softwareโs, and communication. There are different tools available on clouds. Here different models for the project can be communicated and collaborated. 2.Model-based cost estimation There are different estimators incorporated in BMI. These estimators can help you with different estimators. It saves both time and money. Here risks can be determined with proper identification of construction assemblies. 3.Visualization of the project Here the entire project can be visualized. A full overview of projects can be taken. The decision-making process is also improvised. 4.Clash Detection with improved coordination Here clash in the projects can be detected easily. This improves the coordination and efficiency in the project. 5.Risk Mitigation and Cost efficient There are various strategies of risk which can be seen with proper analyzing it (Hall, J., 2018). 12|P a g e
LO4Analyzehowtheconstructionindustryhasdevelopedsuitable collaboration strategies in support of greater recognition of health & safety. P9Explainhowhealth& safetyhasnowbecomeanintegratedpart ofthe construction process. There are various health and safety hazards with laborers which should be seen at the time of construction. There are various hazards related to health and safety as trips, slips, moving objects, etc. Now, this is an integrated part in the process of construction. The points below are followed at the time of construction as: oDaily visits should be carried out to view all possible risks and preventive steps should be identified. oSafety toolbox should be there. Meeting are organized with a major topic for safety where various safety measures are covered. This is done so that all the workers know about different measures related to health and safety oPPE should be mandatory oRegular breaks should be given to all workers. oBoth physical and mental health of workers is focused on. 13|P a g e
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
P10 Describe the government legislation which has benchmarked health & safety within construction. As we have discussed so far that Construction business like any other business have some health and safety measures and government plays an important role in establishing rules and regulations regarding construction work so that no possible harm can be done to the people working on the project or harm to the project. Over the past few years there have been some huge improvements regarding reducing number of injuries on the construction site due to new government legislation about health and safety issues. These legislations both motivates the field and improve quality of work as it ensures no number of people should harmed in the process. P11 Discuss the role of collaboration and communication in ensuring safe working practices In the above section all the safety measures that are implemented by government are discussed. No matter how small or big a project is safety of the workers has to be of highest priority. Theyโre also a very important measure to ensure safety of the project and workers and i.e. proper communication and collaboration of safe working practices. These safety criteria would be useless if no one knows about them or no one understands how to apply these practices in their work. Assigning a worker, the responsibility of ensuring communication about safety practices is a basic step to help workers to communicate better. Regular survey to ensure that workers are satisfy from these new safety measures or not. To understand the importance of collaboration, we must understand what impact does it make on construction management: 1.Improved worker safety 2.Better coordination among workers 3.Improved emergency response measures 4.Trust and respect 5.Reduced dispute resolution All these points are important as it ensures that all the tasks during a construction project runs smoothly. Also, we must understand that a task is just as good as the people that does it. 14|P a g e
M4: Demonstrate how the construction industry has benefited through changes in health and safety legislation. So far, we have learnt about all the safety measure that construction company must implement at their work place and include in workplace procedure. But what the point of all this if no one gets benefited from all these legislations. In reality people have been benefited from all these new rules and regulations. There has been a huge decrement in number of workplace hazards, a smaller number of safeties complains. Workers trust each other which promotes positivity in the company. 15|P a g e
CONCLUSION In LO1 we discussed about what is a construction company, what is measures and structures? Also, we learnt links between various entities in structure in a construction. In LO2 we came to understand about various types of construction company and how in some situation they are co- dependent on each other. In LO3 we discussed about key stages in a constriction project. Stages like contracting, planning, designing, etc. Impacts of BIM and its references were also the part of LO3 section. In LO4 we discussed health and safety measures and how these measures improve the quality of the work at a construction site. 16|P a g e
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
References Hook J. (2016).The Modern Methods of Building and Construction. [online] Available at: https://www.buildsoft.com.au/blog/the-modern-methods-of-building-and-construction [Accessed 9 Mar. 2019]. Rodriguez J. (2018).How to Use and Identify the Critical Path Using a CPM Schedule. [online] Available at: https://www.thebalancesmb.com/critical-path-method-scheduling-844481 [Accessed 9 Mar. 2019]. Hall, J. (2018).Top 10 Benefits of BIM in Construction. [online] Connect.bim360.autodesk.com. Available at: https://connect.bim360.autodesk.com/benefits-of-bim-in-construction [Accessed 9 Mar. 2019]. Sharman, J. (2018).12 of the biggest health and safety risks in construction. [online] thenbs. Available at: https://www.thenbs.com/knowledge/12-of-the-biggest-health-and-safety-risks-in- construction [Accessed 9 Mar. 2019]. 17|P a g e