Construction Project Management: Risk, Health and Safety

14 Pages4933 Words253 Views
   

Added on  2019-09-23

About This Document

This report discusses risk management, health and safety in construction project management. It covers topics such as identifying and evaluating risks, risk mitigation, training, risk assessment, and establishing a safety culture. The report provides insights into the importance of proper planning, training, and safety culture in ensuring the success of construction projects. Course code and college/university not mentioned.

Construction Project Management: Risk, Health and Safety

   Added on 2019-09-23

ShareRelated Documents
CONSTRUCTION PROJECT MANAGEMENT
Construction Project Management: Risk, Health and Safety_1
Table of ContentsIntroduction................................................................................................................................3Theme 1: Risk management in construction Project..................................................................3Theme 2: Health and safety risk in construction Project management......................................6Theme 3: Cost Planning for Construction Project...................................................................10Conclusion................................................................................................................................12References................................................................................................................................12
Construction Project Management: Risk, Health and Safety_2
IntroductionIn this particular report, the assessment regarding the construction project management hasbeen engulfed. The project management has been considered as the viability foraccomplishing a project significantly so as to ensure that the overall requirement of entailinga successful completion of the project has been done or not. In order to pertain efficientconstruction and their respective feasibility, it is highly important for the management to lookafter the ongoing instances of the project. Thus considering the perspectives of constructionproject and their management perspectives different assessment has been gathered throughidentifying the managing operations of the respective construction projects that has beensignificantly ensured with the different processing of the projects. The project has alsoidentified and analyzed through pertaining the issues that has restraints the challenges formanaging the project construction. It is also evident that the examination has been entailedthrough applying important theories along with the methods justifying the allocation towardsthe effectiveness of the construction project has been assembled. On the other hand, thecritical evaluation has been judged through enabling the practice accomplished throughadministering the project significantly. The portfolio described regarding significant topicshas been enormously depicted in underpinning the ideas that will reflect the opportunities incumulating the factors essentially. These themes will generate higher viability towards thepersisting evaluation that has been generated through identifying the factors significantly. Theme 1: Risk management in construction ProjectAs per the analysis, it has been observed that a well-planned project may also face somemajor obstacles or problems. It has become very important to consider all the risk, which mayoccur in order to conducting the project. Risk has been deemed as an uncertain event bywhich the overall project could be affected. Risk within the project may occur as bothpositive and negative way. Risks those are carries positivity, has been considered as anopportunity for the project planners to consider (Carvalho, et al., 2015). Risk within theproject can force the planners to do some additional changes in their project planning. Thereis no assurance included in any projects; risk can appear even in a small or simple projectalso.
Construction Project Management: Risk, Health and Safety_3
Through the sources, it has been examined that in order to handle a risk, some majorinitiatives need to take by the project planners. Avoid, mitigate as along with transfer andaccept are one of those major initial steps to conquer those risks.Ensuring all the precautions has become very crucial in order to handle any kind of risksduring the on-going project. Proper planning for those uncertain risks is very essential fromthe beginning, which can give more stability to the on-going project. Risk management planhas been deemed as very important in order portraying those major precautions to deal withthe risks. The Risk management plan covers many areas such as identifications of the risks asalong with proper analysis of those risks and help the planners in the process of providingproper solutions regarding to those major risks. Risk within the project planning can bothinternal and external also. Risks those are related to the technologies have been deemed asinternal risks. On the other hands, risks such as, changes in the market as long with theweather problems can be considered as one of those external risk factors within a project. Ithas become very important for the project planners to follow some major guidelines in orderto conduct the proper Risk management plan. As per the analysis, it has been observed fromthe analysis that risk management process contain two major aspects in order to conduct theproper Risk management plan within the project. Assessment of the risks as along with themitigation strategy is very crucial part within the risk management process. Risk mitigationplan has been deemed as very impactful in order to eliminate the overall impact of those riskevents. Identification of the risks can be done with both creative as along with the disciplineway. In the below part there will be complete discussion about the various stages of Riskmanagement plan, which can be proved as very impactful in order to understand the overallscenario.Identification of the risks:This following segment has been deemed as one of the most crucial parts in the Riskmanagement plan, by which the planners can, proves their further planning in order toconquer or tackle those major risks. Discipline manner of risk identification is very muchpopular among the project planners, which give them opportunity to identify those majorrisks within the project in a appropriate manner. Using checklist has been considered as oneof the most effective way to conduct the identification process of those major risks. Bysuccessfully implementing the checklist, the project managers as long with the team memberscan identify those major areas of risks. It has been observed that many organizations or
Construction Project Management: Risk, Health and Safety_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Investigating Procurement and Marketing Strategies in Australian Construction Industries
|12
|2292
|220

Environmental Management Practices and Processes in Building and Construction
|11
|1497
|58

Introduction to Gas Pipeline Construction
|8
|2074
|119

Project Management Competencies
|5
|763
|325

Legal Risk Management
|12
|2726
|334

CBD and South East Light Rail Project, Sydney
|12
|3317
|85