Environmental Management Practices and Processes in Building and Construction

   

Added on  2022-12-27

11 Pages1497 Words58 Views
ENVIRONMENTAL MANAGEMENT PRACTICES AND PROCESSES IN
BUILDING AND CONSTRUCTION
Student Name
Course
Instructor
Institution
Location
Date
Environmental Management Practices and Processes in Building and Construction_1
Question 1
Supervision of the Planning of the construction Work in Progress
Subcontractors
A construction project is usually awarded to a contractor. The primary duties of the contractor
include cost and time estimation .The sub constructors were subcontracted to perform the
following operations:
Estimation of the cost of the work.
Provision of subcontracted services like plumbing among others (Ismailos and Touchie
2017).
In the construction work of that was under supervision, the selection of the subcontractors that
were on the site was guided by the following criteria.
In order to ensure that the sub-contractor met the job requirements, the following criteria were
used:
The chosen subcontractor had requisite financial strength to maintain flow of cash
Had enough experienced staff for site supervision
Had standard workmanship as stipulated in the job requirements
Programme adherence
Craftmen and labourers sufficiency
Question 2
Environmental Management Practices and Processes in Building and Construction_2
Construction materials availability, conditions review and authorized purchased(Salzer et al
2017). The selection of the materials for the construction sought the assistance of the experts
including civil engineers, architects, among others. In order to ensure that all the required
materials were available for the construction, quantity surveyor assistance was considered very
importance. It was through the pieces of advice from the quantity surveyor that the purchases
were made.
Question 3
Construction sites are known to be some of the easy targets for thieves that are opportunistic.
Considering the high value for the equipment and plants, any thief with an access to the site can
easily have quick profits. Considering the location of the project, the access to the site was
determined after identification of the threats which included: Theft, Vandalism as well as
terrorism(Gusakova et al 2017). The construction site has been designed to have only one point
for accessibility on the Eastward area which is facing the adjacent main road. Biometric system
has been used with the details of the individuals accessing the site. Only those individual whose
details are in the database will have access to the sites. The visitors are to be issued with
‘Visitors Card’
Question 4
Establishment of Contacts
In order to ensure that the construction process of the low rise building in Sydney is properly
achieved, the establishment of contacts will be very important. It is through this contact that the
relevant statutory authorities that are responsible for the licensing of the construction work will
Environmental Management Practices and Processes in Building and Construction_3
use to reach out to the team handling the processes of construction as well as the client. The
details therefore include:
Property Address
The full property address is 1046 Sydney
Name of Client
James Makarios
P.O. Box 5215-2510
Sydney
Supervision work subject to Australian Construction Authority Management terms and
conditions pursuant to building and construction acts.
Date of supervision
The inspection to be carried out as deemed fit by the Authorities
Report reference number
The reports regarding the supervision of the construction work to be generated in line with the
reference number of the project. Contact details are treated as legally owned information and
their use in one way be legally binding.
Question 5
The construction of the low-rise building that was under the supervision had specific stages that
were considered being covered within the allocated time frame. In order tie ensure that all the
Environmental Management Practices and Processes in Building and Construction_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Comparison between the Role of QS in Main Contractor and Interior Design Firm
|12
|999
|315

CPCCBC4008B – Conduct On Site Supervision Of Building
|12
|2011
|13

Electronics Engineer Job Profile
|5
|902
|154

Supervise Planning of On-Site Medium Rise Building or Construction Work
|11
|1750
|88

Comparison between the Role of QS in Main Contractor and ID Firm
|28
|8848
|67

Assessment of a Tender Document
|39
|6452
|90