The assignment requires the development of a verification plan and test cases for an ERP system. The system will be developed using the waterfall method, with distinct phases for verification. The feedback plan will differ by department, with each department presented with a verification plan based on its functional requirements. Test cases will be created for both functional and non-functional requirements, including component testing, integration testing, system testing, and acceptance testing.